Dr. Ralph Ellis Click to edit Master title style Click to edit Master subtitle style 1 Dispute Review Board Value Contributions Ralph Ellis, P.E., Ph.D.

Slides:



Advertisements
Similar presentations
Disputes/Claims 2009 Overview Division of Construction Management.
Advertisements

Publication of Final Regulations for Liquidation and Debt Collection Activities Initially published in Federal Register as proposed rules on 11/3/05 Published.
Construction Contracting
ABC Change Orders College of Environmental Design
ESTIMATING - A CONTRACTORS PERSPECTIVE. Company History/Background Oman Construction was founded in 1876 First bridge contract in 1881 First Highway Contract.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
NMDOT 2013 Specifications- Section 100 Presented by: Rod Billingsley Billingsley Engineering, P.C. Las Vegas, NM.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Ohio Department of Transportation Dispute Review Boards (DRB) Megan Blackford, P.E., Esq. Construction Claims Administrator.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Managing and Negotiating Change Orders Presented by Daniel Williams, P.E. May 1, 2008.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Project Close Out CTC-470.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
ESTIMATING By Laith Jacob.
RISK AND RISK MANAGEMENT. OVERVIEW DEFINITIONS RISK MANAGEMENT PROCESS ROLES AND RESPONSIBILITIES OF PROJECT PARTICIPANTS RISK MANAGEMENT TOOLS LIABILITY.
Dr. Ralph Ellis, P.E., Ph.D. The Role of the Dispute Review Boards and State Arbitration.
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Genesis Solar Module Brochure ™
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
AMENDED LAWS FOR UTILITY COORDINATION 2009 AASHTO R/W & Utilities Subcommittee Conference April 22 nd.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
NOTICE OF CLAIM – HOW TO AVOID THE TRAP© LAW OFFICES OF MICKEY BEISMAN
CONSTRUCTION ADMINISTRATION Project Closeout Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
CIVL202 Construction Engineering I Tutorial 3 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
2010 CDBG Recipients’ Workshop The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
King Fahd University of Petroleum & Minerals
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
CONSTRUCTION CONTRACTS DOCUEMENTS
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
1 Public Involvement, Access, and Petitions DJ Law EPA Region 8.
1 Welcome!. 2 Health Fund staff on today’s call Kim Moore, President Jeff Gamber, Technology Mgr. Virginia Elliott, VP for Programs.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Generic Documents for the Design, Build, Operate Contract for a Solid Waste Facility.
Change Orders. CO Proposals Initiated by owner or GC –Owner requests estimate for work proposed –GC CO results from changed site condition or response.
Contractor Alternate Design Serving the Public’s Best Interest.
Writing DRB Recommendations Ralph Ellis, Ph.D., P.E.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
CON 2001 & CVE 4070 Construction Engineering Risk Management Prof. Ralph V. Locurcio, PE.
Resident Engineer Panel Discussion Jack Stone, P.E. District 2 Engineer, Casper Chad Aagard, P.E. District 2 Engineer, Casper Pete Hallsten, P.E. District.
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Biosimilar (Insulin) – Competitive Landscape and Market & Pipeline Analysis, 2016 DelveInsight’s, “Biosimilar (Insulin) – Competitive Landscape and Market. Request for sample of this research report:
Ordinance Amending Orange County Code Section October 27, 2009.
The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
Asphalt Paving Technical Committee (APT) Proposed revisions to the Asphalt Concrete Sections of the MAG Specifications.
2010 Environmental Change Orders. Tom Harris, PE Field Engineer Division of Construction Management.
Contractor Review and Prequalification
Construction Oversight
WATER REVENUE REFUNDING BONDS SERIES 2017A
AASHTO Subcommittee on Construction Contract Administration Section
Sausalito Downtown Public Restroom
CONTRACT DOCUMENTS & CONSTRUCTION
Costs and Economics of Construction
Enhancing Procurement Efficiency: Litigation Issues, Standard Bidding Documents and eGP Shakti Prasad Shrestha March 21, 2018.
Presentation transcript:

Dr. Ralph Ellis Click to edit Master title style Click to edit Master subtitle style 1 Dispute Review Board Value Contributions Ralph Ellis, P.E., Ph.D.

Dr. Ralph Ellis Potential Benefits Direct saving in dispute resolution cost Direct savings in improved project performance Indirect value gained from DRB hearings

Dr. Ralph Ellis Savings in Dispute Resolution Cost Litigation cost is high –Legal expenses –Key personnel time –Loss of attention to your business The outcome is uncertain

Dr. Ralph Ellis Improved Project Performance Projects with DRBs on average perform better than projects without DRBs Lower cost growth Lower time growth

Dr. Ralph Ellis Analysis of FDOT Projects In 1994 FDOT began introducing DRBs From 2000 to 2002 we have both non-DRB and DRB projects This provides a rare opportunity to compare project performance

Dr. Ralph Ellis Performance Measures Time Cost Growth = Final Contract Amount - Original Contract Amount Original Contract Amount Time Growth = Final Contract Time - Original Contract Time Original Contract Time

Dr. Ralph Ellis

Findings DRBs resulted in: 2.7% Net Cost Growth Savings 15.1% Net Time Growth Savings

Dr. Ralph Ellis In Today’s Work Program 2.7% x $3 Billion = ? 15.1% x 60,000 days = 9000 days 9000 x $4,000 per day = ? DRBs result in significant direct savings.

Dr. Ralph Ellis DRB Hearing Recommendations are an Indicator of Areas that Need Improvement

Dr. Ralph Ellis Differing Site Conditions Pay Items and Quantities General Contract Interpretation Other Issues Design Errors Rework 24% 27% 21% 14% 7% 6% DRB Hearing Disputes by Category

Dr. Ralph Ellis 27% Differing Site Conditions Utility Conflicts Different Subsurface Conditions Different Project Environment

Dr. Ralph Ellis Differing Site Condition Existing Gravity Walls Plans do not show existing gravity wall and do not call for removal Walls are mostly underground, from the road they appeared to be a thickened sidewalk edge Contractor did not notice the walls during the pre- bid site visit Contractor request compensation for removing the walls

Dr. Ralph Ellis EOR : We generally we don’t call out items to be removed such as curb, sidewalks, etc. The intent is to have the contractor perform a site visit before submitting a bid as required by the specifications. Specification 2-4 Examine the contract documents and the site of the proposed work carefully before submitting a proposal for the work contemplated.

Dr. Ralph Ellis Cross sections did not show gravity wall.

Dr. Ralph Ellis Contractors also read the PPM.

Dr. Ralph Ellis Differing Site Conditions Environmental Issues Noise ordinances and permitting No night work ordinances Security procedures

Dr. Ralph Ellis Contract Interpretation Dispute Time Extensions Design-Build contract with A+B bid and I/D provisions Contractor believes that weather time extensions are applicable to Liquidated Damages and Disincentives

Dr. Ralph Ellis

Rework We have had several substantial disputes involving replacement of concrete structures due to cracking These are serious issues because of the time and cost

Dr. Ralph Ellis Lessons to Be Learned DRB hearing issues are indicators of areas that may need management attention. Owners can use this information to improve the design and construction process.

Dr. Ralph Ellis Official Construction Engineering Career Qualification Test Dr. Ellis

Dr. Ralph Ellis Find the Shortest Path from A to B A B

Dr. Ralph Ellis Find the Shortest Path from A to B A B Forget Engineering. Try Art History or Journalism

Dr. Ralph Ellis Find the Shortest Path from A to B A B Not a Construction Engineer Great Potential in Structural Engineering

Dr. Ralph Ellis Find the Shortest Path from A to B A B Definitely Construction Engineering. Great Potential as Owner’s Project Engineer

Dr. Ralph Ellis Find the Shortest Path from A to B A B Definitely Construction Engineering. Great Potential as a Contractor

Dr. Ralph Ellis Go Gators