After Action Review. 2 AGENDAAGENDA AAR ROEAAR ROE REVIEW GOALSREVIEW GOALS PARTICIPANT COMMENTSPARTICIPANT COMMENTS GOALS SCORE-CARDGOALS SCORE-CARD.

Slides:



Advertisements
Similar presentations
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Advertisements

Multinational Planning Augmentation Team (MPAT)
Learning and Teaching Conference 2012 Skill integration for students through in-class feedback and continuous assessment. Konstantinos Dimopoulos City.
WSQA PEPD Mentor Training Session 1: Mentoring role and responsibilities.
UNCLASSIFIED 1 MNF SOP Workshop 20 – 24 June June 2011 Workshop Overview Brief UNCLASSIFIED.
CRP Evaluation Analysis Sunflower Project Chris Lewis, Stacey Calhoon and Annette Witt January 13, 2009.
UNCLASSIFIED 1 MPAT TEMPEST EXPRESS 24 (TE-24) Workshop Overview 7 January January 2014.
Co-OPR Collaborative Operations for Personnel Recovery Collaborative Sensemaking, Planning and Execution via sharing of issues, activity options, constraints.
Gender-based Violence SOP Training Workshop Standard Operating Procedures 1.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Pulaski Technical College Committee Training August 11, 2014.
29 Jul 2005 UNCLASSIFIED UNITY OF EFFORT – TEAMWORK - COOPERATION TEMPEST EXPRESS # 8 AFTER ACTION REVIEW (AAR)
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
1 Multinational Planning Augmentation Team (MPAT) TE-6 Brief / Way Ahead March 2004 Enhancing Multinational Operations.
HQ USPACOM Integrated Operations Training WJTSC 10-1 (U) Col S. Scott Davis Director, Training and Exercises USPACOM J7 2 April 2010 This brief is classified:
Campaign Planning Process 29 March 2006 Step 7 – Prepare Operations Plan (OPLAN) / Operations Order (OPORD) & Assess UNCLASSIFIED.
1 AFTER ACTION REVIEW Humuhumunukunukuapua’a. After Action Review.
1 Multinational Planning Augmentation Team and Asia-Pacific Area Network (MPAT & APAN) in Asia and the Pacific 2 May 2007 COL John M Bratton, USA (Ret.)
Multinational Planning Augmentation Team (MPAT) Enhancing Multinational Operations Updated
Multinational Planning Augmentation Team (MPAT) MPAT TE-5 Ulaanbaatar, Mongolia Enhancing Multinational Operations.
Mel C. Labrador Senior Analyst, APAN Asia Pacific Area Network (APAN)
UNCLASSIFIED 1 MPAT TEMPEST EXPRESS 25 (TE-25) Workshop Overview June 2014.
Multinational Planning Augmentation Team (MPAT) Facilitating the Planning Process MPAT TE-4 / CDW-7 Singapore, August 2002 CDR Bob Wohlschlegel
Knowledge Production Division J083. APAN Mission Communicate and share information electronically to facilitate regional understanding, promote confidence.
MPAT TE - 3 / CDW – 6 Detailed Schedule Introduction to Odyssey-Mr. Lewis Forming the MNF / CTF- CDR Wohlschlegel
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Military Decision Making Process – Multinational (MDMP-M)
MPAT TEMPEST TEMPEST EXPRESS-1 AFTER ACTION REVIEW COL BREWSTER--FACILITATOR November 2000.
Take Charge of Change MASBO Strategic Roadmap Update November 15th, 2013.
UNCLASSIFIED 1 MPAT TEMPEST EXPRESS-14 Staff Planning Workshop Phase I - Introduction 4 March 2008.
Multi-company Project Team Design Workshop Maximizes buy-in and fit to company culture and business climate Team Implementers, LLC Copyright © 2008.
FUTURE MPAT ACTIVITIES. Future MPAT Activities Summary u Time Window 22 July – 10 Aug 01 - Concept and SOP Development Workshop #5 – Location: TBD u Time.
UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 01 May 2010 What is MPAT?
MNF SOP 18 After Action Review (AAR) 8-12 June 2015
TEMPEST EXPRESS - 4 Singapore DETAILED DAILY SCHEDULE 20 Aug Aug 02.
Thirteenth United Nations Congress on Crime Prevention and Criminal Justice Ancillary Meetings and Non-governmental Activities Introduction to the Congress.
February 2009 Credentialing the FEMA Disaster Workforce Reservist Briefing Date: February 2009 Paul Geiger, Readiness Branch Chief, Disaster Reserve Workforce.
UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?
Multinational Planning Augmentation Team Tempest Express(MPAT TE-1) Tempest Express(MPAT TE-1) CDR Robert Wohlschlegel, J382 USCINCPAC J38 Training & Doctrine.
Requirements Workshop Techniques for E-Business Projects
Transformation of a National Laboratory: ISMS Component Beth Streeper ISMS Program Manager Integrated Safety Management Workshop 2007 Brookhaven National.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
UNCLASSIFIED 1 “ Southeast Asia Disaster Management Cooperation” Indonesia, June June 2007.
MPAT SECRETARIAT Multinational Force Crisis Action Planning Overview COALITION/COMBINED TASK FORCE TRAINING.
Framework for Effective Multinational OPs Multinational Planning Augmentation Team (MPAT) MNF SOP WORKSHOP JTF to CTF Transition Guide (Annex)
Course of Action Comparison Purpose u Define course of action comparison and its role in the crisis action planning process u Discuss the associated task.
Registration MPAT TE-2 Control Meeting for CECG personnel For Workshop participants: MPAT/HA-DR Overview - Col Brewster.
Overview of the Center for Excellence in Disaster Management and Humanitarian Assistance August 2007.
Campaign Planning Process 29 March 2006 Step 4E – Determine Prioritized Supporting Effects UNCLASSIFIED.
UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 18 September 2009 What is MPAT?
UNCLASSIFIED 1 UNCLASSIFIED Concept of Operations Brief 05 July 05 MPAT TEMPEST EXPRESS-8 HAWAII JULY 2005.
After Action Review. 2 AGENDAAGENDA AAR ROEAAR ROE GOALSGOALS OBJECTIVESOBJECTIVES SUSTAINMENT / IMPROVEMENT AREASSUSTAINMENT / IMPROVEMENT AREAS THEMESTHEMES.
UNCLASSIFIED 1 TEMPEST EXPRESS 28 (TE 28) OVERVIEW March 2016.
UNCLASSIFIED 1 MPAT TEMPEST EXPRESS -15 Staff Planning Workshop Overview 28 July – 1 August Jul 08.
It’s Not What They Learn, It’s What They Use: Integrated Solutions for Sustained Results Presented by: Ed Emde, President Wendy Mack, Director of Consulting.
Special Operations Command Joint Forces Command
Standing Operating Procedures
Sample Fit-Gap Kick-off
State Coordinator Intervention
MULTINATIONAL FORCES STANDING OPERATING PROCEDURES (MNF SOP)
Multinational Planning MNF SOP 18 After Action Review
MPAT TEMPEST EXPRESS 30 Staff Planning Workshop Introduction
Standing Operating Procedures
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Organizing a project kickoff
After Action Review (AAR) Plan
Standing Operating Procedures
Multinational Planning Interagency Coordination
Directions for this Template
Presentation transcript:

After Action Review

2 AGENDAAGENDA AAR ROEAAR ROE REVIEW GOALSREVIEW GOALS PARTICIPANT COMMENTSPARTICIPANT COMMENTS GOALS SCORE-CARDGOALS SCORE-CARD

3 AAR ROE INTERACTIVE PROCESSINTERACTIVE PROCESS MAXIMUM AUDIENCE PARTICIPATIONMAXIMUM AUDIENCE PARTICIPATION FOCUS ON IMPROVING THE PROCESSFOCUS ON IMPROVING THE PROCESS

4 MPAT TE- 4 Workshop Goals Improve Interoperability and Multinational CooperationImprove Interoperability and Multinational Cooperation Reduce Crisis Response Time and Increase Planning EffectivenessReduce Crisis Response Time and Increase Planning Effectiveness Develop and Become Familiar With MNF SOPDevelop and Become Familiar With MNF SOP

5 MPAT TE-4 PARTICIPANT COMMENTS CPG 1 – LTC Vagi OalaCPG 1 – LTC Vagi Oala CPG 2 – MAJ Tim GarriockCPG 2 – MAJ Tim Garriock CPG 3 – MAJ ShariffCPG 3 – MAJ Shariff IO/NGO – Sharon McHaleIO/NGO – Sharon McHale CECG – MAJ Tony KroghCECG – MAJ Tony Krogh Senior Mentor – BG(ret) HvidegaardSenior Mentor – BG(ret) Hvidegaard

6 CPG 1 SUSTAIN / IMPROVE SUSTAINSUSTAIN – Academic reviews immediately prior to each CAP session IMPROVEIMPROVE – Prepare / Provide glossary and acronym list to be handed out before starting the conference – Make CPGs smaller to reduce noise level and maximize participation by all delegates (create a fourth CPG) – Consider providing a facilitator/mentor to each CPG

7 CPG 1 WORKSHOP DESIGN COMMENTS Is the schedule a good template for future workshops?Is the schedule a good template for future workshops? – Need more time for CPG planning sessions – “Kick start” mission analysis with product already partially completed Is the balance between work and cultural interaction about right?Is the balance between work and cultural interaction about right? – Excellent balance; perhaps ENDEX social event? Are the CAP academics beneficial?Are the CAP academics beneficial? – MNF SOP workshop participants missed out Were the subject matter briefs beneficial?Were the subject matter briefs beneficial? – Need more emphasis on PK, less on HA

8 CPG 2 SUSTAIN / IMPROVE SUSTAINSUSTAIN – Social event and Dinner were extremely valuable for team building – COA comparison final process IMPROVEIMPROVE – Consider rethinking the conference focus (Training or Teambuilding) – Have COA leads fully develop COA before conference and guide the group through the process (have canned solution to keep process moving) – Prepare Staff Estimates ahead of time

9 CPG 2 WORKSHOP DESIGN COMMENTS Is the schedule for MPAT TE-4 a good template for future workshops?Is the schedule for MPAT TE-4 a good template for future workshops? – IPB prepared staff estimate needs to be promulgated in more detail Is the balance between work and cultural interaction about right?Is the balance between work and cultural interaction about right? – Outstanding. Are the CAP academics beneficial?Are the CAP academics beneficial? – Varied answers – repetitive – possibly OK; – Baseline of operational terms, processes, etc needs to be established and all need to be aware – battle book?; – All need to participate in first week training; – DJTFAC did an outstanding job. Were the subject matter briefs (ICRC, NGO’s etc) beneficial?Were the subject matter briefs (ICRC, NGO’s etc) beneficial? – Additional briefs from those who “have been there” – mil/civ – Clear objectives to SME’s so briefs are relevant

10 CPG 3 SUSTAIN / IMPROVE SUSTAINSUSTAIN – NGO, COE, UN, Retired Service member participation – great value – Keep Tempest Express focused on planning IMPROVEIMPROVE – Integrate MPAT into an execution exercise so that the MPAT planners can see the total process – Add a media panel as part of academics so that MPAT planners can get to know and understand the media’s roles and point of view similar to what was done with NGOs, UN etc…

11 CPG 3 WORKSHOP DESIGN COMMENTS Is the schedule for MPAT TE-4 a good template for future workshops?Is the schedule for MPAT TE-4 a good template for future workshops? – YES Is the balance between work and cultural interaction about right?Is the balance between work and cultural interaction about right? – YES Are the CAP academics beneficial?Are the CAP academics beneficial? – YES Were the subject matter briefs (ICRC, NGO’s etc) beneficial?Were the subject matter briefs (ICRC, NGO’s etc) beneficial? – YES

12 IO / NGO SUSTAIN / IMPROVE IO / NGO SUSTAIN / IMPROVE SUSTAINSUSTAIN – IO/NGO PARTICIPATION ›COA DEVELOPMENT PROCESS ›RED CELL TEAM IMPROVEIMPROVE – USE HUMANITARIANS AS ‘RESPONSE CELL’ FOR CTF PLANNERS – EXPAND TO INCLUDE DONORS AND HOST NATION REPS – MORE CONCENTRATION ON COORD PROCESS DURING EXECUTION PLANNING PHASE OF CAP – TERMINOLOGY

13 CECG SUSTAIN / IMPROVE SUSTAINSUSTAIN – Detailed scenario and database information – Automated RFI tool IMPROVEIMPROVE – Enhance RFI tool to include functional area categories – Create a tool to provide daily RFI summaries – Develop queries/reports based on RFI categories

14 MPAT TE- 4 Workshop Goals Improve Interoperability and Multinational CooperationImprove Interoperability and Multinational Cooperation Reduce Crisis Response Time and Increase Planning EffectivenessReduce Crisis Response Time and Increase Planning Effectiveness Develop and Become Familiar With MNF SOPDevelop and Become Familiar With MNF SOP

15 MPAT TE-4 ANY CLOSING COMMENTS OR QUESTIONS