Jin Huang Los Alamos National Lab for the FVTX Group.

Slides:



Advertisements
Similar presentations
FVTX Transition to Operations PHENIX FVTX Close Out April 23, 2012 BNL 1 FVTX Close Out Review Ed OBrien April 23, 2012.
Advertisements

MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
1 The Forward Silicon Vertex Detector Upgrade for the PHENIX Experiment at RHIC Douglas Fields University of New Mexico Feb. 12, 2011 Douglas Fields, WWND11,
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
The Physics Potential of the PHENIX VTX and FVTX Detectors Eric J. Mannel WWND 13-Apr-2012.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
PHENIX Run12 Spin John Koster RBRC RSC Meeting 2012/05/11.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
U N C L A S S I F I E D 7 Feb 2005 Los Alamos RHIC Program David M. Lee Heavy Ion and Medium Energy 7 February 2005.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
M. Brooks, LANL 1 02/19/07 Review Schedule The FVTX upgrade project Melynda Brooks Silicon Sensor, Chip, ReadoutJon Kapustinsky Mechanics Walt Sondheim.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
The PHENIX Forward Silicon Vertex Tracker Eric J. Mannel IEEE NSS/MIC October 29, 2013.
FVTX Trigger Toru Nagashima, Yomei Fukushima (Rikkyo University) Shoichi Hasegwa (J-Parc) Itaru Nakagawa RIKEN and FVTX Group 1.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1 N. BrunerUniv. of New Mexico MuTr Software  Online  Calibration  Offline.
1 The PHENIX Muon Identifier Front End Electronics Andrew Glenn (University of Tennessee), for the PHENIX collaboration Andrew Glenn 5/1/01 April APS Meeting.
M. Brooks, 29-Jan-02 P-25 Review South Arm: Hardware and Analysis Status Brief overview of muon arm Physics goals-->implied performance requirements Status.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Performance of PHENIX High Momentum Muon Trigger.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1 FVTX Simulation and Analysis Software Zhengyun You Los Alamos National Laboratory Nov
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
PHENIX Timetable FY 2002 FY 2003 Prepare S  S  with Au-Au beams May 2001 March 2002 Jan 2001 June 2002 Sept st  physics (J/  suppression &
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
 Main focus ◦ Instrumentation talk on FVTX ◦ FVTX commissioning and analysis update in Run12/13 ◦ New functionality  Relative Lumi monitor, reaction.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
FVTX Trigger Toru Nagashima, Yomei Fukushima (Rikkyo University) Shoichi Hasegwa (J-Parc) Itaru Nakagawa RIKEN and FVTX Group 1.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
FVTX High Multiplicity Trigger for Run15
Evidence for Strongly Interacting Opaque Plasma
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
Maki KUROSAWA VTX Group 2014 Feb 20
Preparation of the CLAS12 First Experiment Status and Time-Line
Presentation transcript:

Jin Huang Los Alamos National Lab for the FVTX Group

 Oct-Dec 2011 – Detector final assembly and test Quality check on all wedges  Late Dec 2011 – First data from PHENIX IR Reached Dec 30 milestone  Late Jan 2012 – First full detector readout from IR  Feb – First data (self-triggered) with beam, shortly after stable run 12 collision were established  Feb – First physics data with 1/6 acceptance  Mid March 2012– Detector operational with ~90% of acceptance ON Have taken all 510 GeV p-p data  Late March 2012– Detector operation by shift workers FVTX Closeout Review Jin Huang GeV p-p start 200 GeV p-p start FVTX → IR

FVTX Closeout Review Jin Huang 3 Online display PHENIX event builder / Data storage PHENIX event builder / Data storage Standalone data (calibration, etc.) Standalone data (calibration, etc.) FPHX Chip Sensor HDI Ionizing Hit IR DAQ Room Data cable/bandwidth shown on this slide only Slow Control Client

FVTX Closeout Review Jin Huang 4  FVTX Slow-control ◦ Control parameters of FEM/ROC/each individual FPHX chips ◦ Read back system status  Two Slow-control interfaces ◦ C++ based: integrated into PHENIX run control ◦ FVTX Expert GUI (next page)  Slow-control commissioning ◦ Debugged slow-control communication to IR ◦ Established slow-control to all wedges ◦ Verified control commands functionality

FVTX Closeout Review Jin Huang 5  Centralized super toolkit for FVTX control/monitoring Standalone run control Database Specialized GUIs e.g. GTM, bias Specialized GUIs e.g. GTM, bias LV/HV Control Expert GUI FVTX

 Stage 1: before Dec 30, 2011 ◦ Immediately after detector installed in IR ◦ Using portable power supply / fiber routes to readout one ROC ◦ Noise level is small (≤ 500 electrons) ◦ 1 st operational experience  Stage 2: Jan 2012 ◦ Fully power on all ROCs one by one ◦ Test aliveness/solve any problem ◦ Refinement of FPGA code ◦ All ROCs other than SW5 (broken transceiver) were operational FVTX Closeout Review Jin Huang 6 Status Monitoring Webpage (End of Stage 2)

 Provide quick data readout to check detector status  Without disturbing data taking of other subsystems  Special runs: ◦ Calibration ◦ Timing scan FVTX Closeout Review Jin Huang 7 Station 3 Station 2 Station 1 Station 0 (less channels) Sector 0Sector 1Sector 2Sector 3

 Inject pulse of known charge into FEE chips and vary pulse size  Measure channel status, noise level, check mapping  2.5 min of data 8kHz, 1.7M event Spin PWG Jin Huang 8 Calibration Amp. Chips Wedges Event 8kHz

 Calibration Results ◦ Detector status channel by channel ◦ Noise level / threshold  Status ◦ Runs taken regularly ◦ Automated analysis ◦ HTML report generated/archived FVTX Closeout Review Jin Huang 9 Noise and threshold for each channel Noise ~ 430 elec. Threshold > 5 × Noise

 Data flow ◦ FVTX → DCM II → SEB Server → PHENIX event builder → Storage  Joined Main DAQ smoothly ◦ Standalone timing (Feb 22) → Granted Joining (Feb 23) → Joined Main DAQ (Feb 24) → Took 100M event (Feb )  Stability and flexibility ◦ Continuous running since 510 GeV p-p run (Mid March) ◦ Minimal DAQ failure rate during a production run ◦ Can join/exit big-partition running in few minutes (e.g. for standalone test or debugging) FVTX Closeout Review Jin Huang 10

 Adjust delay to taking FVTX data in coherent timing with PHENIX  Scan FVTX FEM delay to find best match in time ◦ Special method allows the FVTX to time in much faster (~5 min) ◦ Optimal timing → max hit ◦ Side band → hits are centered in trigger window (2 beam-clock) FVTX Closeout Review Jin Huang 11 ← High threshold

 FVTX Online Monitoring ◦ Immediate data analysis of raw hit information ◦ Monitor status of detector for possible hardware problems so expert can quickly fix ◦ First data quality check  Online monitoring status ◦ Operational and integrated with PHENIX main ◦ Can be easily accessed by shift worker ◦ Mainly used by expert for now ◦ Provide out-of-counting house access and archiving FVTX Closeout Review Jin Huang 12 Typical online monitoring plot (510 p-p) Showing most wedges in north arm is normal Legend: Normal, Low/High yield, OFF

 Many institutions and physicists worked on DAQ commissioning and made this work possible ◦ Los Alamos: Christine Aidala, Melynda Brooks, Matt Durham, Hubert van Hecke, Jin Huang, Jon Kapustinsky, Kwangbok Lee, Ming Liu, Pat McGaughey, Cesar da Silva, Walter Sondheim, Xiaodong Jiang ◦ University of New Mexico: Sergey Butsyk, Doug Fields, Aaron Key ◦ Columbia University: Cheng-Yi Chi, Beau Meredith, Aaron Veicht, Dave Winter, ◦ New Mexico State University: Abraham Meles, Stephen Pate, Elaine Tennant, Xiaorong Wang, Feng Wei ◦ Brookhaven: Carter Biggs, Stephen Boose, Ed Desmond, Paul Gianotti, John Haggerty, Jimmy LaBounty, Mike Lenz, Don Lynch, Eric Mannel, Robert Pak, Chris Pinkenburg, Rob Pisani, Sal Polizzo, Christopher Pontieri, Martin Purschke, Frank Toldo ◦ University of Colorado: Mike McCumber  Many other collaborators also provided crucial support FVTX Closeout Review Jin Huang 13

 FVTX DAQ commissioning is successful ◦ Steady progress was made ◦ 90% of the detector is operational  DAQ operation is stable ◦ Stable noise level – monitored regularly ◦ Stable big-partition runs ◦ Taken all 510 GeV p-p data  Routine data taking handed to shift worker in late March ◦ 24/7 expert on-call and close monitoring of detector performance FVTX Closeout Review Jin Huang 14

FVTX Closeout Review Jin Huang 15

 Evaluated it is safe to run detector with 1/6 acceptance  Timed-in Feb 22 morning in standalone mode  Granted big partition test on Feb 23  Timed-in Feb 24 in PHENIX big partition ◦ Identified optimal timing (Next slides) ◦ Smooth data taking  Took ~100M events in big partition ◦ Two batches of data taking on Feb 24 and Feb 28 ◦ Almost no errors in data taking ◦ Data was analyzed quickly  Online: ensured data quality  Offline: tracking, vertex correlation to BBC and matching with Muon Arm FVTX Closeout Review Jin Huang 16

FVTX Closeout Review Jin Huang 17 Legend: Normal, Low/High yield, OFF

FVTX Closeout Review Jin Huang 18

 Disabled ROC ◦ Electrical issues, to be fixed in the summer  Missing few wedges ◦ Able to communicate through slow-control ◦ Under debugging, expect to recover  Occasional missing clock for few ROCs ◦ Suspect quality of clock signal to those ROCs ◦ Not affect majority of data taking FVTX Closeout Review Jin Huang 19

FVTX Closeout Review Jin Huang 20 FVTX Overall hit eff. (% of chan. alive) × (eff. per chan.) Noise for each wedge

 = 1.2  Tracking in forward region and close to IP  Provide ◦ Differentiate primary vertex / secondary decay ◦ Track isolation : suppress hadrons from jet for W measurement ◦ Precisely measure opening angle : J/  mass ◦ Jointed tracking with MuTr : suppress delay-in-flight FVTX Closeout Review Jin Huang 21

 2003 – 2008 LANL supported R&D  2007 – BNL / DOE / Technical reviews  2008 – prototyping  2009 – first production modules  2010 – assembly started in earnest  2011 – assembly and installation COMPLETE  2012 – first data in beam FVTX Closeout Review Jin Huang 22

Wedges that have data ROC Hit map Showing Data from 24 ROCs in a single run South Arm North Arm + Can control 95% wedges FVTX Closeout Review 23Jin Huang

FVTX Closeout Review Jin Huang 24 Packet Hit map for Run timing peak

FVTX Closeout Review Jin Huang GTM delay = 4 Expect timing delay is FEM Delay = 10, GTM Delay = 4 FEM Delay = 9, GTM Delay = 3 FEM Delay = 11, GTM Delay = 5 Expect timing delay is FEM Delay = 10, GTM Delay = 4 FEM Delay = 9, GTM Delay = 3 FEM Delay = 11, GTM Delay = 5 Special technique to speed the scan by changing FVTX delay

Number of hit per event Number of Stations with good hit(s) Four independent data sets in color coding Each include 16 wedges in one ROC FEM Timing offset … Coincidence 11!

ROC Hit map Readout from PHNEX run control. Few ROCs missing which are under firmware update

 To hear from Sergey FVTX Closeout Review Jin Huang 28

 Noise level ~ 500 electron in PHENIX  Threshold ~ 300 elec. Calibration map for ROC NE2 (1/12 of south arm acceptance) Showing stable communication to all wedges and low noise level 3.5 min to calibration 1M channels using PHENIX DAQ