The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Entry Capacity Substitution Workshop 5 – 5 th December 2008 Review and Options for Development.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Third Workstream meeting re Baseline Re-consultation and Substitution 12 September 2007.
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Review Group 221: Option 3 – security provided after allocation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
September 2008 QSEC auction - Allocations Transmission Workstream
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Entry Capacity Substitution Workshop 6 – 7 th January 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group 221: 23 January Analysis of the impacts of the proposal on Users.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
Transfers and Trades Special Transmission Workstream
Force Majeure Existing FM situation: Up to 200GWh/d capacity shortfall due to the rejection of NG’s planning application for a PRI in Corse / Tirley area.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Interactions with the implementation of RIIO-T1
Exit Capacity Release Methodology Statement
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
Entry Capacity - update
Capacity Methodology Statements: Impact of Mod 452
Capacity Methodology Statements
Exit Capacity Substitution and Revision
Background to National Grid’s Baseline analysis
Update on Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Development of Entry Capacity Substitution
QSEC auction timetable
Entry Capacity Substitution
Modification 501 slides for Workgroup
The Treatment of “Spare / Sterilised” Capacity
Entry Capacity Transfer and Trade
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Incremental Entry Capacity Release Methodology Statement
Entry Capacity Transfers - Constrained Period
Presentation transcript:

The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only

2 Licence Obligations  Ofgem decision to modify Licence – 5 th Sept direction  SpC C8D paragraph 10 provides obligations with respect to Entry Capacity Substitution  Ofgem direction (5 th Sept)  NG required to prepare and submit for approval by the Authority an Entry Capacity Substitution Methodology Statement by 19 th May 2008  NG required to use reasonable endeavours to have an approved Entry Capacity Methodology Substitution Statement by 2 nd June 2008  NG required to use reasonable endeavours to substitute capacity from 2 nd June 2008  As part of Section 38A notice, reconfirmed the 10% held back for shorter term and commitment to keep the limit under review

3 High Level Review of Responses to Informal Consultation Summary  7 responses received  Preference to hold back more than 10%  As stated Ofgem position clarified in Section 38A notice therefore, issue not considered further by NG at this stage for general auctions  However, for substitution the 10% rule may not be applicable  No clear consensus on preferred option for substitutions / transfer & trades – support for Options 1 through to 5.  All responses available on Joint Office website  Next slides consider substitution option 2 in detail and the variant elements of options 3 & 4  Our intention is to review Transfer and Trade comments as part of enduring solution workshops

4 Range Of Substitution Options: Recap Option 5: Driving Miss Daisy undertaken every 5 years as part of TPCR following consulted upon Ofgem methodology Option 1: The Fast & Furious triggered at QSEC (implemented Sept 08) applicable from Y+2 all available capacity subject to substitution no NPV test no limit on exchange rates

5 Range Of Options Option 5: Driving Miss Daisy Option 1: The Fast & Furious Option 2: triggered at QSEC (implemented Sept 08) applicable from Y+2 all available capacity subject to substitution lower NPV test limit on exchange rates

6 Expansion of Option 2: When? Triggered at QSEC (implemented Sept 08) Earliest obligated capacity release date – April 2010 Default incremental capacity release date – April 2012 New ASEPs Separate auctions for specific new ASEPs possible to benefit from substitution before existing ASEPs (through auction in June – Sept 08). Is this acceptable / discriminatory? What? Capacity available to be substituted All unsold obligated capacity at any ASEP except the [10%] held over to other auctions Capacity must not be sold for any quarter after that considered for substitution But what limits should be placed on “one quarter” bookings? (See subsequent slides).

7 Expansion of Option 2 (continued): Capacit y ASEP A Booked capacity Obligated level Consider the one quarter issue

8 Expansion of Option 2 (continued): Capacit y ASEP A ASEP B Booked capacity Requested capacity Obligated level Consider the one quarter issue

9 Expansion of Option 2 (continued): Consider the one quarter issue NB – Substitutions may not be at 1:1 exchange rate. Diagram is intended to indicate process not absolute values. Capacit y ASEP A ASEP B No issue with substitution Period 1 Period 2 Potential substitution

10 Expansion of Option 2 (continued): Consider the one quarter issue Capacit y ASEP A ASEP B Sterilised capacity? Potential substitution For Period 1 should NG: Invest for capacity at ASEP A or ASEP B (is this economic?); or Substitute capacity and be remunerated for increased Buy-Back risk (risk also to Users of non-availability of capacity) Reject the substitution Substitution could be time limited as for transfers (current Licence does not allow). Solution still required for the single quarter. Prohibit / limit single quarter booking, e.g. set a minimum booking. Period 1 Period 2 Revised obligated level (applies from period 2) Revised obligated level (applies from period 2)

11 Expansion of Option 2 (continued): Exchange Rates In previous consultation general consensus to limit Set to avoid excessive capacity destruction – views? Exchange rate of 2:1 is a halving of capacity – is this excessive? NPV Test Existing NPV test to guarantee incremental capacity release Lower NPV test for substitution; does not guarantee release of capacity Suggested minimum qualifying bid: 4 quarters within 2 consecutive years With bid price for all 4 quarters at incremental price step

12 Expansion of Option 2 (continued): Allocation 1 st - Bids for obligated capacity – released in full. 2 nd – Incremental capacity requests meeting existing NPV test – release in full, substitute where possible. 3 rd – Incremental capacity requests meeting lower NPV test – release only if substitution opportunities remain after above 2 stages Bids ranked according to % of NPV, i.e. bid value vs. estimated project value Full bid assessed, not parts Unless full bid allocation, no incremental allocation made

13 Range Of Options Option 5: Driving Miss Daisy Option 1: The Fast & Furious Option 3: Capacity substitution triggered at QSEC (implemented Sept 08) applicable from Y+2 only certain capacity subject to substitution lower NPV test limit on exchange rates

14 Only certain capacity available for substitution (from last time)  The key issue seems to be to define “sterilised / spare” capacity. This could be based just on long term bookings or alternative metrics could be considered.  For example where there is a degree of long term bookings and short term usage the capacity should not be substituted away as this would not be “sterilised / spare” capacity e.g.:  If there are bookings in 2 quarters for four consecutive years at 50% of the existing baseline and flows during the last year have been 90% of the baseline no capacity will be substituted away.

15 Responses  Generally there appeared to be support for consideration of such an approach  But no concrete ideas forthcoming  At the meeting however it was suggested that it should not be “all or nothing” a sliding scale was proposed  It would be intended that this would sterilise this capacity from substitution for the whole auction period  Initial attempt at this ….

16 Sliding scale on capacity available for substitution Baseline 100 Capacity available for substitution No long term bookings 90% 90% booked for QSEC period 0% 50% booking for 4 Quarters in consecutive years from y+2 Historic (last year) utilisation 50% 50% 75% booking for 4 Quarters in consecutive years from y+2 Historic (last year) utilisation 75% 25%

17 Further developed…  Maximum capacity available for substitutions = [90%] of obligated level – this is term “A”  This is reduced by two factors:  Factor 1: booked capacity as a percentage of obligated level - term “B”, with booked capacity defined as the 4 th highest booked level (quarter) measured over any 2 consecutive years from Y+2 to Y[+17];  Factor 2: Historical usage term C as a percentage of obligated level, historical usage defined as peak flow in the preceding 2 years – only applies if C > B.  Capacity available for substitution term D:  D= Obligated level * (A – B – (C-B)/2) (to be rounded down to nearest 10% increment)

18 Range Of Options Option 5: Driving Miss Daisy Option 1: The Fast & Furious Option 4: triggered at QSEC (implemented Sept 08) applicable from Y+4 only certain capacity subject to substitution same NPV test as for incremental limit on exchange rates

19 Summary  We will now produce a report detailing the work undertaken in the 3 workshops and the comments we have received  This should be available in the next 2 weeks  As part of this we will also review and update the proposed timeline