US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

Status of the ATLAS MM project
Chubaka Producciones Presenta :.
Information Systems and Data Acquisition for ATLAS What was achievedWhat is proposedTasks Database Access DCS TDAQ Athena ConditionsDB Time varying data.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
F. Gianotti, AFP kick-off meeting, 20/9/2012 Recommendations for the next steps Reports from the:  Technical Review A.Henriques  Physics Review R.Hawkings.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Kick-off Meeting Kick-off Meeting Presented By:.  Project/s overview and Scope  Project Organization Structure  Client Overview  Project Profitability.
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
LHC ATLAS Detector Upgrade (LADU) Project Jon Kotcher Construction Project Manager John Hobbs Deputy Construction Project Manager (Interim) & NSF Upgrade.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
7/26/2006 Wyatt Merritt 1 DECam Preparations for Critical Decision 2/3a Preparations for CD2 Preparations for CD3a DECam MOUs.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
Kuali Coeus Proposal Development Module Kuali.Colostate.edu.
TDAQ Upgrade Software Plans John Baines, Tomasz Bold Contents: Future Framework Exploitation of future Technologies Work for Phase-II IDR.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Market Systems Release Update Modifications Committee Meeting 55 June 19 th
Micromegas NSW issues Tasks list. Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader &
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
ATLAS micromegas activities (MAMMA)
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
NSDI Strategic Plan Update January 14, NSDI Strategic Plan High-level Timeline 2 Timeframe Activity Dec - Feb Project Start-up – COMPLETED Feb -
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
ATLAS Upgrade Report ATLAS Upgrade Report (20/03/12) Planning Assumptions Phase-0 Plans Phase-I Plans - Letter of Intent Phase-II - LoI Planning Conclusions.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Upgrade Review Meeting Introduction Craig Buttar University of Glasgow RAL 10/5/11.
U.S. ATLAS Project Manager’s Review with the Project Advisory Panel March 21-22, BNL Introduction Howard Gordon.
Project Parkway Timeline to 2011 April 1, 2010 Town Hall Meeting Steering Committee Schools February 2009 May 18, 2009 Project Parkway Community Kick-
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
DAVIS SR. HIGH SCHOOL ALL-STUDENT CENTER (MULTIPURPOSE BUILDING) PROGRAMMING OPTIONS August 6, 2015.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
NSW Electronics Preliminary Design Review Feb 2015 Introduction and Review Scope Feb 2015 NSW ELTX PDR S. Zimmermann 1 Stephanie Zimmermann.
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
Dianne Copeland, Director FSIO Oracle CAB December 3, 2008
Recommendation of Texas Test Plan Team to RMS
Resource Loaded Schedule and Budget Profile
Jim Fast Pacific Northwest National Laboratory
Project Management W. J. Foyt
Francesco Forti University and INFN, Pisa
Enterprise Content Management Owners Representative Contract Approval
FY16 Budget Build (Banner)
Preparations for a Lehman Review
LEGISLATIVE APPROPRIATIONS REQUEST (LAR) CALENDAR [2016‐2017]
Potential Milestones A timeline to finish in one year
McDonald’s calendar 2007.
Overall Project RAG Status:
Release 3 Scope & Proposed Plan
XRN Nov 19 Release - Status Update
Fermi Lab – 2019 CMB-S4 Workshop
Linac Coherent Light Source (LCLS)
McDonald’s calendar 2007.
XRN Nov 19 Release - Status Update
XRN Nov 19 Release - Status Update
2015 January February March April May June July August September
Presentation transcript:

US Organization 05 April 2013U.S. ATLAS Electronics Meeting at BNL1

US nSW Upgrade – Path to Approval  Review Process – path to Lehman Review & CD1 approval  December 19-20, 2012 at BNL o First review of program, scope and budget with US ATLAS Managers o Recommendation to concentrate on Electronics & Alignment  January 17-18, 2013 at Stony Brook o Mini-Lehman Review for practice – external reviewers o Presented budgets in detail, including cost books and risk analysis o Scope and budget settled  January 30-31, 2013 at BNL o Directors Review of Operations & Upgrade – external reviewers o Recommended more details of milestones, contingencies  March 4-7, 2013 DOE/NSF Operations Review at San Diego o Interface between M&O and Upgrade (Kotcher & Hobbs)  July 11-12, 2013 BNL Directors Review of Upgrade Project at BNL o Will be a ‘Lehman-like’ Review  August 26-29, 2013 Lehman Review for CD1 approval at FNAL o Key that we ‘pass’ this review for $ flow 05 April 2013U.S. ATLAS Electronics Meeting at BNL2

Muon New Small Wheels: approved at Oct 2012 CB; now following up on milestones, e.g. full size Micromegas (2x1 m 2 ), sTGC trigger demonstrator, etc.  TDR in May FTK: approved at March 2012 CB; vertical slice tested parasitically in run; simulation for TDR (physics case) on critical path Consolidating a (coherent) physics case for above projects is one of most crucial/urgent aspects in view of TDRs; presently hampered by severe lack of effort, in all of software developments, validation, performance/physics studies, as well as by computing resources  more involvement also from the upgrade community is needed  efforts being organized to increase synergies with Physics/CP groups LAr (higher-granularity readout for trigger): IDR and kick-off in January; approved by EB  for endorsement at Friday CB TDAQ (LVL1, HLT/DAQ, trigger/online software, etc.): IDR and kick-off in January; approved by EB  for endorsement at Friday CB AFP: IDR and kick-off in Sept 2012  following up on milestones (e.g. project organization, consolidation of physics case)  CB approval in 2014 Upgrade: Phase-1 projects

Project Development  Developed draft BOEs and cost book – nSW will be DOE  Schedule for drafts of Bases of Estimate 05 April 2013U.S. ATLAS Electronics Meeting at BNL4