LHC Accelerator Coordination Meeting: March 28, 20061 Remote Operations for CMS Erik Gottschalk.

Slides:



Advertisements
Similar presentations
Recent Activities toward Worldwide Remote Operations of Accelerators N. Yamamoto, KEK ICALEPCS2003,Korea.
Advertisements

Auger Project Management H. Glass Director’s Review15-Dec-2011 Fermilab (Technical Division) has hosted Auger Project Management office since collaboration.
L. Taylor 2 March CMS Centres Worldwide See paper (attached to agenda) “How to create a CMS My Institute” which addresses the questions:
09/06/2006F. Scuri - Remote CO shifts at CDF 1 CDF Remote Consumer Operator (CO) shifts in Pisa Motivations and project contour CDF online issues for remote.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
J. Patrick - Major Challenges/MOPA021 – a new Remote Operations Center at Fermilab J. Patrick, et al Fermilab.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
US CMS Collaboration Meeting: April 7-8, LHC Remote Operations Center Erik Gottschalk Fermilab.
Suzanne Gysin1 Software for the LHC Types of Software Current Prototyping Architecture Ideas Requirements Revisited WBS considerations.
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
Brochure: Lucas Taylor CHEP 2009, Prague1CMS Centres Worldwide : A New Collaborative.
J. Patrick - Major Challenges/MOPA021 – a new Remote Operations Center at Fermilab J. Patrick, et al Fermilab.
Presentation to OHEP, OFES, OASCR: Nov 7, Remote Operations and Collaborative Technologies for Distributed Science --- HEP & FES --- Erik Gottschalk.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
US CMS/D0/CDF Jet/Met Workshop – Jan. 28, The CMS Physics Analysis Center - PAC Dan Green US CMS Program Manager Jan. 28, 2004.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
Collaborating at a Distance: Operations Centers, Tools, and Trends, Erik Gottschalk 1 Collaborating at a Distance: Operations Centers, Tools, and Trends.
2006 ANNUAL MEETING Arlington, Virginia INDUSTRY / UNIVERSITY COOPERATIVE RESEARCH CENTERS PROGRAM Pre-Session: ROLE OF EVALUATOR 8:00 - 9:00 am Thursday,
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
Lucas Taylor LHC Grid Fest CERN 3 rd Oct Collaborating at a distance 1 Collaborating at a Distance Lucas Taylor ▪ LHC Grid Fest ▪ 3 Oct 2008 ▪ CERN.
CERN-IT Oracle Database Physics Services Maria Girone, IT-DB 13 December 2004.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Director, Office of Science April 29, 2004 PRESENTATION FOR THE BIOLOGICAL AND ENVIRONMENTAL.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
CMS Usage of the Open Science Grid and the US Tier-2 Centers Ajit Mohapatra, University of Wisconsin, Madison (On Behalf of CMS Offline and Computing Projects)
Computing at SSRL: Experimental User Support Timothy M. McPhillips Stanford Synchrotron Radiation Laboratory.
LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.
Argonne Accelerator Institute Activites Rod Gerig Argonne May 18, 2007 Presentation to the Fermilab-Argonne Directors’ Collaboration Meeting.
Remote Monitoring for Hardware & Beam Commissioning E. Harms/FNAL 7 April 2005 Port Jefferson, New York bnl - fnal- lbnl - slac US LHC Accelerator Research.
JINR-CERN 5-years Partnership Program N.Russakovich 103-rd session of theJINR Scientific Council meeting JINR, Dubna, 21 February 2008.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
LARP meeting – 2 August, Update Meeting II with Pier E. Harms 3 November, 2005.
11/3/2010 CM15 Controls for LARP and LAFS - 1 Terri Lahey LARP/LAFS/CERN and SLAC.
September 29, Trip to JLAB MCC September 27, 2005.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
CD Strategy Session/Briefing on Collaboration Tools: Sept. 12, Collaboration Tools Erik Gottschalk.
CMS CB, 22 June CMS Centre Status Lucas Taylor CMS Centre Project Manager CMS Collaboration Board CMS Week, June CMS Centre Status 2.New offices.
Visit to CERN/CMS Jan 2006 Patricia McBride Fermilab Slides taken from presentations by Hans Hoffmann and Werner Jank.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Committee – June 30, News from CERN Erik Gottschalk June 30, 2005.
Remote Operations Committee – May 12, Subgroups and Scenarios Erik Gottschalk May 12, 2005.
1 CF lab review ; September 16-19, 2013, H.Weerts Budget and Activity Summary Slides with budget numbers and FTE summaries/activity for FY14 through FY16.
UEC Meeting: May 6, Remote Operations Center Erik Gottschalk.
CMS ROC Report Patricia McBride May 26, 2005.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
CMS Centre Project - Green Light Meeting
LHC Science Goals & Objectives
Remote Operations Erik Gottschalk Fermilab
Remote Operations For High Energy Physics
CMS Centres for Control, Monitoring, Offline Operations and Analysis
Erik Gottschalk for Jean Slaughter
Remote Operations Erik Gottschalk 5 October, 2005
Assessment of Our Status After 183 Days (6 months)
CMS Centres Worldwide CMS Centres Worldwide
Remote Operations for CMS & LHC Erik Gottschalk Fermilab
Remote Operations at Fermilab
Update Erik Gottschalk.
Remote Operations Erik Gottschalk 7 September, 2005
Operations Model Thursday, October 20, 2005 October 13, 2005 Jean Slaughter.
Collaboration Board Meeting
Project Information Management Jiwei Ma
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Welcome Update on ESS Construction Project
Preliminary Project Execution Plan
Presentation transcript:

LHC Accelerator Coordination Meeting: March 28, Remote Operations for CMS Erik Gottschalk

LHC Accelerator Coordination Meeting: March 28, IntroductionIntroduction We are designing a joint CMS and LHC remote operations center on the first floor of Wilson Hall. We are looking for input: Functional aspects (operations, communications, outreach) Physical aspects (computing, networking, conferencing, layout) Send questions or suggestions to: Additional information is available:

LHC Accelerator Coordination Meeting: March 28, OverviewOverview Control rooms at CERN Remote operations centers Plans and goals for Computing requirements WBS & computing security SciDAC-2 Proposal Summary

LHC Accelerator Coordination Meeting: March 28, Control Rooms at CERN Temporary CMS control room (“green barracks”) CMS control room at Point 5  Under construction  Small control room, low ceiling  ~13 km from CERN (Meyrin) New accelerator control room – CERN Control Centre The CCC combines all of the control rooms for the accelerators, cryogenic systems and technical infrastructure into one room. The CCC began operations on February 1 st, 2006.

LHC Accelerator Coordination Meeting: March 28, CERN Control Centre

LHC Accelerator Coordination Meeting: March 28, Remote Operations Centers Paris Sphicas (CPT Week, Jan Feb. 3, 2006): Asymptotically, at sufficiently long times after startup, we will run CMS remotely This is not a question of whether this will happen – it’s a question of when. CCAR (planned for Meyrin)  Remote operations (and control) center for CMS  Described as the “heartbeat” of CMS at CERN ROC and  Remote operations center for CMS commissioning and operations, and LHC beam commissioning and operations

LHC Accelerator Coordination Meeting: March 28, Why build a Remote Operations Centre? 1) Dedicated facility to support CMS and LHC commissioning and operations. Remote shifts 2) Facilitate communication with CMS and LHC control rooms. Call center for US-CMS collaborators to access information about CMS and the LHC accelerator. Introduce collaboration tools to improve communication 3) Take advantage of a unique opportunity to have detector and accelerator experts working together to solve problems.

Requirements Review – July 21, Goals for Participate in shifts from the U.S. Participate in data monitoring and analysis Monitor US-CMS offline computing operations Develop and test new monitoring capabilities Provide access to data, data summaries, and analysis results Provide training in preparation for shift activities at CERN Assist in establishing communications between accelerator and detector experts in North America and CERN

LHC Accelerator Coordination Meeting: March 28, Task Force Erik Gottschalk – Chair (FNAL-PPD) Kurt Biery (FNAL-CD) Suzanne Gysin* (FNAL-CD) Elvin Harms* (FNAL-AD) Shuichi Kunori (U. of Maryland) Mike Lamm* (FNAL-TD) Mike Lamont* (CERN-AB) Kaori Maeshima (FNAL-PPD) Patty McBride (FNAL-CD) Elliott McCrory* (FNAL-AD) Andris Skuja (U. of Maryland) Jean Slaughter* (FNAL-AD) Al Thomas (FNAL-CD) also has an advisory committee with members from Universities, FNAL, CERN-PH, CERN-AB, and CERN-TS. * Accelerator Subgroup

Requirements Review – July 21, Planning for The task force developed a plan for CMS remote operations based on discussions with members of CDF, D0, CMS HCAL and trackers groups. We worked with CMS and US-CMS management at all steps in the process. A requirements document for was prepared and reviewed last summer. We visited 9 sites (e.g. Hubble, NIF, ESOC) to find out how other projects do remote operations. The goal is to have ready before the start of beam (end of 2006).

LHC Accelerator Coordination Meeting: March 28, Computing Requirements (Page 7) (Page 14)

LHC Accelerator Coordination Meeting: March 28, Computing Requirements (Page 14) (Page 17)

LHC Accelerator Coordination Meeting: March 28, Computing Requirements (Page 19) The Requirements Document is available at:

LHC Accelerator Coordination Meeting: March 28, Location & Layout Operations Center (Phase 1) Office Space (Phase 2) Conference Room (Phase 1)

LHC Accelerator Coordination Meeting: March 28, Possible CMS Activities Operations Center: Online shifts (data quality monitoring, trigger monitoring) Offline shifts (data processing, data distribution, GRID) Miscellaneous (shift training, DB maintenance) Call center for US-CMS Conference Room (integrated with Ops. Center): Daily/weekly meetings Office Space: Two small meeting rooms (3 – 5 people each) Expert space Rest area for shifters

LHC Accelerator Coordination Meeting: March 28, WBS “Phased” WBS for  Phase 1 – What is needed in FY06 for Ops. Center & Conf. Room  Phase 2 – What is needed after FY06  Category 3 – Items that should be paid for by someone else The phased WBS approach gives us time to address CERN’s policy for computing security and to understand specific needs for Base cost (Labor & M&S)  Phase 1:$213 K  Phase 2: $791 K  Category 3: $927 K The budget for assumes a model for remote access that is based on CERN’s policy for Computing and Network Infrastructure for Controls (CNIC).

Baseline for LHC Remote Access Software Application Common Middle Wear (CMW) Software Application Front End subscribe publish Databases Timber Logging Timber Logging Timber Replicated/Backed up Logging DB Remote Desktop Terminal Server Network

Preferred Model for Remote Access Software Application Common Middle Wear (CMW) Software Application Front End subscribe publish Databases Timber Trusted Host Logging Network

LHC Accelerator Coordination Meeting: March 28, CMS Timetable ROC (WH11) renovation started – June 2005 Requirements Review – July 2005 Preliminary requirements document – July 2005 ROC renovation completed – September 2005 Developed plan – Fall 2005 WBS presented to FNAL Directorate – Feb FESS engineering start – March 2006  Looking for feedback now! construction completed – End of 2006 Move ROC operations to – Spring 2007

LHC Accelerator Coordination Meeting: March 28, Computing Division Activities We are working with the Computing Division in the following areas: Video conferencing for CERN CCC and 1-East Networking for LHC software applications (working with LARP) Consulting on CMS remote monitoring Remote access and security

LHC Accelerator Coordination Meeting: March 28, SciDAC-2 Proposal On March 6, 2006 we submitted a SciDAC-2 Proposal to the DOE. The goal of this proposal is to “significantly enhance scientific collaboration” by developing “new tools and technologies.” For the proposal we are collaborating with Fusion Energy Sciences by working with researchers who are working on ITER (International Thermonuclear Experimental Reactor). The FNAL part of the proposal asks for funding to support two FTEs for five years:  Develop role-based access (LHC)  Develop a data-distribution system for online monitoring data (CMS) Collaborating institutions: General Atomics, ANL, Caltech, Columbia Univ., FNAL, LBNL, MIT, PPPL, Princeton Univ.

LHC Accelerator Coordination Meeting: March 28, SummarySummary We are developing plans for a joint CMS and LHC remote operations center, and are looking for input. If you have any questions or suggestions contact: task force mailing list)

LHC Accelerator Coordination Meeting: March 28, Additional Slides

LHC Accelerator Coordination Meeting: March 28, AssumptionsAssumptions For CMS CMS will have a shift schedule, a run plan, and a protocol that defines responsibilities and roles of shift personnel. We assume that a shift leader is responsible for CMS shift activities. will have shift operators who will be able to assist US-CMS collaborators with CMS activities during commissioning and operations. will participate in CMS shifts. Neither the duration nor the frequency of the shifts has been determined. The CMS Collaboration will have a protocol for access to the CMS control system (PVSS), and a policy for how access to the control system will vary depending on the physical location of an individual user. The CMS Collaboration will have a policy that defines how DAQ resources are allocated. This includes allocation of DAQ resources to various detector groups for calibration and testing. The CMS Collaboration will have a protocol that defines how on-demand video conferencing will be used in CMS control rooms and The CMS Collaboration will provide web access to electronic logbook and monitoring information to collaborators worldwide The CMS Collaboration will maintain a call tree that lists on-call experts worldwide for each CMS subsystem during commissioning and operations For both CMS & LHC will comply with all CERN and Fermilab safety and security standards.

LHC Accelerator Coordination Meeting: March 28, Site Visits Technology Research, Education, and Commercialization Center (TRECC) – West Chicago, Illinois (Aug. 25, 2005) Gemini Project remote control room – Hilo, Hawaii (Sept. 20, 2005) Jefferson Lab control room – Newport News, Virginia (Sept. 27, 2005) Hubble Space Telescope & STScI – Baltimore, Maryland (Oct. 25, 2005) National Ignition Facility – Livermore, California (Oct. 27, 2005) General Atomics – San Diego, California (Oct. 28, 2005) Spallation Neutron Source – Oak Ridge, Tennessee (Nov. 15, 2005) Advanced Photon Source – Argonne, Illinois (Nov. 17, 2005) European Space Operations Centre – Darmstadt, Germany (Dec. 7, 2005)

LHC Accelerator Coordination Meeting: March 28, ConsolesConsoles