LOCKPORT CITY SCHOOL DISTRICT Washington Hunt Elementary School Michelle T. Bradley Superintendent of Schools Deborah Coder Assistant Superintendent for.

Slides:



Advertisements
Similar presentations
NEPTUNE CITY SCHOOL DISTRICT
Advertisements

School District No. 73 (Kamloops/Thompson) Beattie School of the Arts – Pineridge Campus School District No.73 Facility Re-configuration Challenges and.
BOE Information Session Evolving Plan to Address Student Enrollment Challenges as of November 9, 2011.
Budget The Board of Education wished to hold costs down for the community!
Superintendent’s Recommendations for District Improvement Related to Facility Needs VICTORIA PUBLIC SCHOOLS.
REVIEW SESSION ONE When does the Fiscal Year begin each year? What are the five parts of a budget? There are four funds. Name them and provide a brief.
Budget The Board of Education wished to hold costs down for the community!
School District Efficiency Study Morrisville-Eaton Central School District Advisory Committee Meeting REVIEW OF DRAFT REPORT SEPTEMBER 17, 2014 Castallo.
BOARD OF EDUCATION Finance Presentation Thursday, February 9, 2012.
Superintendent of Schools Holland Public Schools A report on the first 100+ days.
CONTINGENT BUDGET OVERVIEW Presented by Michelle T. Bradley Superintendent of Schools and Deborah Coder Assistant Superintendent for Finance April 2012.
JOINT SCHOOL DISTRICT NO. 2 (MERIDIAN) Proposed Annual Budget Ada & Canyon Counties.
NEW HANOVER COUNTY SCHOOLS P ROPOSED C OUNTY B UDGET R EQUEST April 7, 2015.
 The first reading of the budget is to be approved and then placed on display.  The budget will be put on display on the website, and in the main office.
BUDGET DEVELOPMENT BUDGET COMPONENTS BUDGET COMPONENTS Debt Service Debt Service Fringe Benefits Fringe Benefits Transportation Transportation.
New Configuration Public Hearing May 15, 2008 Superintendent Terry E. Shoemaker.
South Nodaway Long Term Planning Bond Issue Presentation.
School District No. 73 (Kamloops/Thompson) Draft Operating Budget DRAFT BUDGET FOR
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Strongsville City Schools Recommendations on Building Utilization.
1 McKinney isd PROPOSED budget June 22, 2009.
Manteca Unified School District 45 Day Revise Sept 9, 2003.
LOCKPORT CITY SCHOOL DISTRICT Budget Presentation Expenditures: The Big Picture Presented by Michelle T. Bradley Superintendent of Schools and.
City of the Future Schools Presented to the Mayor’s 7 th District Roundtable Meeting Monday, June 19, 2006.
Lyme Central School District Budget Hearing May 7, 2015.
Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.
UPDATING 5-YEAR/10-YEAR FACILITY PLAN PLANNING FOR SUCCESS.
Manchester Essex Regional School District Budget Workshop January 19, 2010.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Brookings School District All Day Kindergarten Update Presentation Contains Projected Data.
Superintendent’s Budget Presentation for Providence School Board April 12, 2010.
Ridgefield School District Capital Facilities Plan March 9, 2010.
LOCKPORT CITY SCHOOL DISTRICT Budget Development Update Michelle T. Bradley Superintendent of Schools December 2011.
2014/15 CURRENT STUDENT ENROLLMENT PRESENTED TO THE BOARD OF EDUCATION JANUARY 13, Rye City School District.
Financial Update and Impact Pinconning Area School District January 2010.
Higher Achievement for Each and Every Student Proposed FY Capital Improvement Plan: Investing in our Students Alexandria City Public Schools.
COLLEGE STATION ISD 2015 Bond Information Election Date: November 3, 2015.
Budget Cuts and Their Consequences Mark Grey Assistant Superintendent, Business Services.
In FY the District Faced a $2.6 Million Dollar Reduction  SUMMARY OF REDUCTIONS  36.5 staff positions (5+%)  Elementary foreign language 
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Proposed 2013 Bond A Smart Plan For Continued Excellence In The Dearborn Public Schools Proposed 2013 Bond A Smart Plan For Continued Excellence In The.
The mission of the Wappingers Central School District is to empower all of our students with the competencies and confidence to challenge themselves, to.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
S.P.L.O.S.T. Building the Future … One Penny at a time “Building the future for the children of Crisp County…one penny at a time!”
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
Prior Conversations with Board as We Explore Land Acquisition
East Grand Rapids Public Schools
Consolidated Central Office Building
Portland Public Schools Proposed Budget
Board of Education Proposed Budget
WILMINGTON PUBLIC SCHOOLS
UPDATE: 8/8/2011 Batavia City School District
School #1 Ballot Question and Proposal
HARPURSVILLE CENTRAL SCHOOL
HARPURSVILLE CENTRAL SCHOOL
Award-Winning Strategies for Cost Savings in Districts
1300+ High School Seats School Board Work Session May 15, 2017
Brasher Falls Central School District Annual Meeting May 17, 2016.
Hammondsport Central School
Pillager Public School District Community Survey Results
Octorara Area School District
CENTRAL BERKSHIRE REGIONAL SCHOOL DISTRICT
ELDRED CENTRAL SCHOOL DISTRICT
NEWBURY LOCAL SCHOOL DISTRICT FIVE YEAR FORECAST
Welcome Financial Recovery Advisory Committee
ELDRED CENTRAL SCHOOL DISTRICT
final Discussions on the budget
East Troy Community School District Community Survey Results
Houston K-8 School Enrollment Information Report
Houston K-8 School Enrollment Information Report
Presentation transcript:

LOCKPORT CITY SCHOOL DISTRICT Washington Hunt Elementary School Michelle T. Bradley Superintendent of Schools Deborah Coder Assistant Superintendent for Finance June 6, 2012

Background – Long Term Plan Between 1980 – 1990 the Town of Lockport was growing at a rapid rate. The student population was over 6,000 students. To accommodate this growth additions were added in 1988 (HS), 1989 (GS), 1994 (AM), 1995 (EB) and 1997 (CU). In the early 1990’s the BOE began researching suitable locations for a new 600 student elementary school to replace the four aging elementary schools 2

Background – Long Term Plan Instead additions were built and the new elementary school concept was put on hold. In the mid to late 90’s there were three separate chemical leaks in close proximity to DeWitt Clinton. This compelled the BOE to again research building a new elementary school. However the purchase of land was cost prohibitive. 3

Background – Long Term Plan In May 2007 the District was notified that SED would not allow any new capital projects at the older schools unless the ADA compliance issues were addressed. In January 2008, Habiterra Architectural estimated this cost to be $1 million per school to retro-fit for ADA compliance. 4

Background – Long Term Plan Based on the cost information from Habiterra, the building of a new elementary school was again being considered began the fiscal crisis with NYS and state foundation aid was significantly reduced. District enrollment had declined to 5,200 students 5

Background – Long Term Plan Three of the elementary buildings did not meet ADA compliance requirements (DC, JP, WH). In September 2010 the district closed one school (DeWitt Clinton), repurposed another (John Pound) and left the option open to close the third (Washington Hunt). 6

Background – Long Term Plan The remaining K-5 buildings were now approaching capacity and many non-instructional spaces were being utilized. In May 2011, a capital project was created which contained a classroom addition to RBK, which would eliminate the use of the non-instructional spaces in the K-5 buildings. 7

Background – Long Term Plan In the fiscal crisis continued in NYS and state foundation aid was again significantly reduced. The April 2011 district budget included the merging of two middle schools to one 5/6 building and one 7/8 building as a cost saving measure and to enhance the learning environment. 8

Background – Long Term Plan In September 2011 elementary buildings are now grades K-4 and have some additional space. Students at WH can be accommodated into the K-4 buildings once the RBK addition is built. There is no longer a need to build a new elementary school. 9

Background – Long Term Plan A district long term goal has been met. All students have been removed from the older non ADA compliant buildings. In addition the district has realized some cost savings to offset the foundation aid loss. And educational programs have been enhanced to reflect new SED initiatives. 10

WH Critical Factors – ADA Compliance No elevator No handicapped toilet rooms No ramps Doors are not wide enough Classrooms are not ADA compliant Cost to renovate – over $1 million 11

WH Critical Factors – Traffic Concerns Limited parking spaces at WH Significant congestion at arrival and dismissal times Emergency vehicles have encountered difficulty entering the hospital drive at times 12

WH Critical Factors – Marketability 13 The district has spoken to a commercial realtor and the fair market value of the building is estimated to be $134,150. Proceeds from the sale of WH would be deducted from any remaining WH building aid. District will still receive the net building aid.

Critical Factors – Building Aid Impact 12 more years of building aid left on the building for two projects and one refinancing bond building aid is $92,938 per year building aid is $92,546 per year building aid is $67,104 per year Total building aid is $1,036,966 14

Critical Factors – Enrollment 15 Enrollment Projections: ●A comprehensive analysis was done: ●First the current Kindergarten, Grade 1, and Grade 2 students district-wide (as of 4/2/12) were “moved up” one grade level to Grades 2, 3, and 4 for ●Then, to project student enrollment for Kindergarten and Grade 1 for , the district counted the current students enrolled in PS and PK; as well as students currently in agency placements; and any students evaluated by the district.

Critical Factors – Enrollment 16 Enrollment Projections (continued): ●The analysis also considered the impact of the new apartments going up in the RBK school district. ●District contractual class sizes are: Kindergarten: students Grades 1 and 2:25 students Grades 3 and 4:28 students ●Class sizes at the four remaining elementary schools will continue to be below contractual limits after the assimilation of WH.

Critical Factors – Student Transportation 17 ●The majority of students currently attending WH live more than one mile from any other elementary building. ●They will be entitled to bus transportation. ●Per Ridge Road there are district buses near the WH area that are below capacity. This includes the two busses currently going to RBK and eight vans. Ridge Road anticipates very little, if any, increased costs for transportation.

Critical Factors – Fiscal Savings Staffing (salaries and benefits net of unemployment) = $535, Utility savings = $33, Other (insurance, supplies, etc) = $10, Cafeteria fund savings = $12, Total 1 st year savings = $592, Future Building Maintenance Savings = $994,

19 The district long term facilities plan has been reviewed. The fiscal challenges imposed by the State have been considered. All while maintaining quality and comprehensive programming for our students. Presentation Summary:

20 Open for Discussion with Board of Education Next Step