Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL 36117 (334) 274-6362 Fax: (334) 274-6352 Mail.

Slides:



Advertisements
Similar presentations
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
Advertisements

State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
More Federal Funding Programs for Local Agency Projects Beth Vargas Duncan Certification Program Manager Local Government Section January 8, 2011.
Prepare + Prevent + Respond + Recover + Mitigate 1 Credit Resolution Initiative GOHSEPs focus is on proactively working with applicants to: – Identify.
ALDOT Operations and Extreme Weather Events
SAFETEA-LU Rollout WebCast Emergency Relief for Federally Owned Roads (ERFO) Program February 2006 David Hilgendorf, WFLHD ERFO Coordinator February 2006.
Mitchell D. Doht, PE Quality Management Engineer NDOR – Local Projects Division
Financial Operations Emergency Relief Procedure iHUB-F-Financial Management-Financial Ops – Program Accounting – Financial Operations Emergency Relief.
U.S Fish & Wildlife Service Southeast Region “Steady In The Storm” ERFO Process Jo Ann Clark - Refuge Roads/ERFO Coordinator Joe Girot – Refuge Roads/ERFO.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Impacting Local Government Updating Functional Classification Using GIS September 12, 2013 Bentonville, Arkansas.
Introduction to Recovery
Disaster Cost Reimbursement Assistance IDAHO BUREAU OF HOMELAND SECURITY.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
FHWA’s Emergency Relief (ER) Program February 26 th, 2014 Crowne Plaza Baton Rouge.
North Dakota Association of County Engineers 2015 Annual Conference January 22, 2015 FHWA Update.
Joe Turner, PE Disaster Recovery Engineer. DIVISIONS AND DISTRICTS.
Public Transportation Emergency Relief Program & Hurricane Sandy August 2013.
2012 Hurricane Season Remember Emergency Management  Preparation  Response  Recovery  Mitigation  Close Out.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Emergency Relief for Federally Owned Roads (ERFO) U.S. Department of Transportation Federal Highway Administration December 2013.
Brief Overview.  FEMA  Federal Emergency Management Agency   FHWA ER  Federal Highway Administration – Emergency Relief 
Emergency Operations Section 1 LA DOTD Emergency Operations Federal Highway Administration Emergency Relief (ER) Funding for Local Government 1 Parish.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
North Carolina Emergency Management Recovery Disaster Recovery Updates.
FEMA Public Assistance Program Applicants Briefing FEMA-4062-DR-HI March 3-11,
Division of Homeland Security & Emergency Management Al Cavallo Brief Disaster Assistance Overview with an emphasis on Tribal Roads Declaration Process.
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Public Disaster Assistance Grant Program Briefing.
Federal Highway Administration Emergency Relief (ER) Program Brian Hogge Field Operations Team Leader July 2013.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Public Disaster Assistance Grant Program Briefing Severe Storms June 23-30, 2015 June 23-30, 2015.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Mitigation Focus-Public Assistance Briefing for Hurricane Sandy
State Transportation Bonds. State Aid Bond Programs LBRP – Local Bridge Replacement Program ◦State Bridge Bond Funds LRIP - Local Road Improvement Program.
FEMA Programs I Session Name: FEMA Programs I Coastal Hazards Management Course Slide 31.1.
ODOT’s Local Agency Certification Program Jill Pearson Certification Program Manager March 12, 2010.
INTRODUCTION TO FEDERAL HIGHWAY FUNDING AND ELIGIBILITY Steve Baumann Financial Specialist (503) Mike Morrow(Field Operations Engineer) Mike.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
1 ID-XX-20XX DR-XXXX FMAG-XXXX Applicant Brief and Kickoff Meeting IDAHO BUREAU OF HOMELAND SECURITY.
How an Electric Utility can get ready for FEMA Marci Lopez P.E.
STATE AID DISASTER. DISASTER REFERENCE INFORMATION  Emergency Repair Resolution  Disaster Guidelines  Disaster Worksheet examples – prepared by counties.
July 14, Rural Electric Cooperatives Procurement/Contracting Guidance Roger Jones Region VIII Disaster Assistance Division.
KENTUCKY TRANSPORTATION CABINET October 2, 2012 PRESENTED BY: KENTUCKY EMERGENCY MANAGEMENT RECOVERY BRANCH A Team of Teams – With One Mission: “Protecting.
Lynnette Roshell
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
McClain County Multi- Jurisdictional Multi-Hazard Mitigation Plan Update Image from
Immediate Threat and Danger Program Pam Truitt  September 10, 2015.
LPA Program Federal-aid Issues for Local Agencies Mike Morrow – December 10, 2010.
When Disaster Strikes Prior Preparation, Response, Recovery King W. Gee Associate Administrator for Infrastructure Federal Highway Administration.
Road Safety Audits Road School, 2011 Rick Drumm, P.E. Safety Engineer Federal Highway Administration.
The Right Things to Know about Right- of-Way April 8, 2016 Tammy M. Keeley Realty Officer FHWA – AL Divisi on.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
US Army Corps of Engineers BUILDING STRONG ® Flood Fighting and Planning US Army Corps of Engineers Omaha District Joel Ames Tribal Liaison.
FEMA PUBLIC ASSISTANCE - A PRIMER
PUBLIC ASSISTANCE GRANTS
1,000 Year Flood Lessons Learned After A State Disaster Norma J
MnDOT Budget Overview House Transportation Finance Committee Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer February.
Disaster Recovery.
Illinois Emergency Management Agency
State Aid Disaster.
Emergency Relief Process
Disaster Recovery.
Declarations and Disaster Assistance ID
Presentation transcript:

Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail to: Federal Highway Administration Alabama Division Access Management

EMERGENCY RELIEF MANUAL MAY 2013

PROGRAM OVERVIEW Section 125 Title 23, United States Code Assists States And Local Jurisdictions With The Repair Or Reconstruction of Damaged Federal-Aid Highways Impacted by – –Natural Disasters – –Catastrophic Failures From External Cause Restore To Pre-Disaster Condition Damage Must Be Directly Related To An Eligible Event

NATURAL DISASTERS FloodsHurricanesTornadoesEarthquakes Land Slides

CATASTROPHIC FAILURES Sudden Failure Of A Major Element Of The Highway Due To An External Cause Not Attributable To Gradual And Progressive Deterioration Not Result Of An Inherent Flaw

EMERGENCY RELIEF APPLICATION PROCESS Decision to Seek ER Financial Assistance Rests With the State Governor Issues a Formal Proclamation of the Existence of an Emergency State Submits a Formal Request for ER Funding to FHWA To be Approved by FHWA The Estimated Damages Must be at Least $700,000 Not Intended To Fund Heavy Maintenance Or Routine Emergency Repairs Not To Replace Other Funding Not To Replace Other Funding Not To Pay For All Repairs

ER FUNDING IS NOT INTENDED TO Pay For All Repairs Relieve Maintenance Responsibility Replace Other Funding Correct Non-Disaster Related Deficiency Add Capacity

ELIGIBILITY OF DAMAGE REPAIR WORK Must Be On Federal-Aid Highway –Roads Must be Major Collectors or Higher as Shown on Approved Functional Classification Maps – –County, Functional Class, and Link Node Maps are ONLINE – – alStudies/SpecialStudies.aspx

Functional Classification Map

ELIGIBILITY OF DAMAGE REPAIR WORK Must Be On Federal-Aid Highway –Roads Must be Major Collectors or Higher as Shown on Approved Functional Classification Maps Direct Result Of The Approved Disaster Within The Highway Right-Of-Way Limits Minimum $5,000 Per Site Restore To Pre-disaster Condition

MINIMUM DAMAGE $5,000 PER SITE An Individual Location Where Damage Has Occurred Group Similar Damage As A Single Site County Wide or Division Wide

TYPES OF REPAIRS Emergency Repairs Permanent Repairs

EMERGENCY REPAIRS 100% Reimbursable To Restore Essential Traffic To Restore Essential Traffic To Minimize The Extent Of Damage To Protect The Remaining Facilities During /Immediately Following A Disaster Work Must Be Completed In First 180 Days

TYPICAL EXAMPLES OF EMERGENCY REPAIRS Regrading Or Restoration Of Roadway Surfaces, Roadway Fills, And Embankments Repair/Replace Drainage Structures Erection And Removal Of Barricades, Detour Signs And Other Traffic Control Removal Of Slides From Roadways Construction Of Temporary Roadway Connections (Detours) Debris Removal

TIMBER AND DEBRIS REMOVAL Clearing Of Debris And Downed Timber Is Limited To Traveled Way, Cut And Fill Slopes Any Additional Clearing Required To Assure The Full Functioning Of Pavement Or Drainage Ditches And Structures Including The Clear Zone For Safety ER Funds Will Only Pay For Removal Of Right of Way Related Debris

Changes in MAP-21 New law was effective October 1, Debris removal for major disasters declared under the Stafford Act will be funded by FEMA. Stafford Act goes into effect when a Presidential Declaration for a disaster is made.

Debris Removal Eligible for FEMA Funding Disaster-related debris removal that is eligible for FEMA funding is not eligible for ER funds. Debris removal from Federal-aid highways is eligible for FEMA funding when the President declares an emergency or a major disaster and FEMA determines that debris removal is eligible under the Stafford Act.

Debris Removal by FHWA The Governor makes an emergency or disaster declaration but the President does not make an emergency or a major disaster declaration under the Stafford Act. The President declares an emergency or major disaster but FEMA determines that debris removal is not eligible under the Stafford Act. The Governor’s declaration covers counties that are not included in the President’s declaration.

ALDOT Guidelines for ER-eligible Debris Removal (May 3, 2011) a. Interstate routes – 60 feet from the edge of pavement (edge line) or as necessary to reestablish the recovery zone. b. Divided routes (non interstate) – 60 feet from the edge of pavement (edge line) or as necessary to re-establish the recovery zone. c. Undivided routes (non interstate) – 40 feet from the edge of pavement (edge line) or as necessary to re-establish the recovery zone. d. If application of the above limits would result in “pockets” of debris remaining on the ROW that would be insufficient in quantity to be included in a permanent restoration contract let through ALDOT, those may be included in the emergency debris removal work. e. If application of the above limits would leave debris or damaged trees that are a threat to the travel way or clear zone, those may be included in the emergency debris removal work.

DETAILED DAMAGE INSPECTIONS Inspections Conducted On Site To Determine: –The Extent Of Damage –Scope Of Repair Work –Preliminary Cost Estimate –ER Funding Eligibility

Inspection Team Personnel FHWAALDOTCounty Specialists As Appropriate

Options For Getting The Repairs Done Options For Getting The Repairs Done Emergency Repairs –Force Account (i.e. local forces) –Solicited Contracts –Negotiated Contracts Permanent Repairs –Contract Awarded By Competitive Bidding

!!! DOCUMENTATION !!! If Not Properly Documented : Cost of ER Work May Not Be Reimbursed Take pictures before starting work Documentation For Emergency Repairs Must Be Tied to A Specific Fed-aid Route and Damage Location Example – Co. Rd. 118 (FA-203) Between MP 6.3 & MP 7.5 Date work preformed Time charges for all personnel Equipment used and supporting cost documentation Materials used and supporting cost documentation

QUESTIONS? FHWA ER website: Contact : Your ALDOT Division Office FHWA Division Office: Jeff Shelley – –Phone (334) – – –