SHRIMP: Model Distribution Integrity Management Plan Development Tool John Erickson, PE American Public Gas Association.

Slides:



Advertisements
Similar presentations
Feeder Line Replacement Refresher Questar Gas Company Meeting with Utah PSC March 27, Questar Gas Company Docket No QGC Exhibit 1.10.
Advertisements

The State of Natural Gas Pipelines in Fort Worth.
Operator Qualification
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Gathering Update Pipeline Safety – Getting to Zero Pipeline.
CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES.
Integrity Management Program Special Permits (IMP-SP) Draft Administrative Plan 12/5/2007.
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
AGA Perspectives on Current Pipeline Safety Regulations August 2014.
Congressional Reauthorization and PHMSA Rulemakings – Enough to avoid future tragedies? Carl Weimer, Executive Director Pipeline Safety Trust.
High Consequence Areas & Pipeline Assessment Intervals –Is there a need for change? Terry Boss Sr. VP Environment Safety and Operations Interstate Natural.
Overview of Key Rule Features
Overview Lesson 10,11 - Software Quality Assurance
Actionable Process Steps and Focused Mitigation Strategies
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration U. S. Department of Transportation Pipeline and Hazardous.
Avoiding a Dam Midlife Crisis 2011 NWHA Annual Conference Scott Larrondo—Idaho Power Company Manager, Power Plant Engineering & Construction.
Development of a Remote External Repair Tool for Damaged or Defective Polyethylene (PE) Gas Pipe Presented by Kenneth H. Green, President Timberline Tool.
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
Western Regional Gas Conference August 25, 2010 Simple, Handy, Risk-based Integrity Management Plan (SHRIMP)
Oak Ridge Utility District Presents Pipeline Safety Information Grants to Communities – Technical Assistance Grants (TAG) By: Ben Andrews, General Manager.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Gerry Lee APGA Security and Integrity Foundation OQ Program Manager APGA Security and Integrity Foundation Interstate Municipal.
1 Distribution Integrity Management Update Tuesday, August 21, 2007 Western Regional Gas Conference Tempe, AZ Glen Armstrong, EN Engineering
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
Produced 27/06/05 Seeing the Future First Tom Welland Fire Services Manager.
Technical Advisory Committee December 2012 Fitness for Service.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Distribution Integrity Management John Erickson, PE American Public Gas Association.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
AASHTOWare Program Overview to the Safety Data Systems Task Group of the Safety Management Subcommittee Presented by Tony Bianchi, Project Manager AASHTO.
1 DIMSA A Distribution Integrity Management SME Approach August – 2009.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration National Association of Pipeline Safety Representatives US DOT.
2010 Western Regional Gas Conference DIMP- Beyond the Final Rule August 24, 2010 Tempe, AZ Bruce L. Paskett P.E. Principal Compliance Engineer NW Natural.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Rulemakings. Change in Derating Factor for PA-11 From.32 to.40.
Pipeline Safety Trust Fort Worth Natural Gas Production Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
Distribution Integrity Management – What To Expect John Erickson, PE American Public Gas Association Western Regional Gas Conference.
Integrity Management Continuous Improvement Fitness For Service and Management of Pre-Regulation Pipe Chad Zamarin Chief Operating Officer NiSource Midstream.
RAILROAD COMMISSION OF TEXAS Alan C. Mann Oversight and Safety Division September 2015.
1 Chapter Nine Conducting the IT Audit Lecture Outline Audit Standards IT Audit Life Cycle Four Main Types of IT Audits Using COBIT to Perform an Audit.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
1 Natural Gas Transmission Pipelines Brisbane City Council Meeting June 6, 2011.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
Pipeline Safety: How the Mayor’s Council On Pipeline Safety Can Help Presentation to: Mayor’s Council on Pipeline Safety Conference Name: Christopher A.
RAILROAD COMMISSION OF TEXAS Chairman David Porter Commissioner Christi Craddick Commissioner Ryan Sitton September 15-17, 2015.
Pipelines study – final report European Commission, DG Environment Industrial Emissions, Air quality & Noise Unit 1.
Who Pays for Safety? Who Should? November 19, 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Pipeline Performance Measures Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1 Mike Israni Senior Technical Advisor Manager: Standards & Committees.
1 Mike Israni Senior Technical Advisor Manager: National Standards July 30, 2009.
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Section 24 Pipeline Safety Standards Incorporated Into the Federal.
Response to Secretary’s Call to Action. NAPSR The National Association of Pipeline Safety Representatives (NAPSR) is a non-profit organization.
Distribution Integrity Management Program
Gas Pipeline Safety Federal Regulatory Update Pete Chace Public Utilities Commission of Ohio Gas Pipeline Safety Program Manager.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
APGA Security and Integrity Foundation
Update on regulations and SIF programs American Public Gas Association
Evaluating Non-Leak Threats
AGA Positions on Current PHMSA Rulemakings
National Conference of Regulatory Attorneys
Distribution Integrity
Presentation transcript:

SHRIMP: Model Distribution Integrity Management Plan Development Tool John Erickson, PE American Public Gas Association

What Is APGA? The National Trade Association for Publicly- Owned Gas Utilities Created in 1961 Over 700 member utilities

What is the APGA Security and Integrity Foundation 501 c3 Non-profit foundation created by APGA in 2005 to assist small operators Receives funding from the Pipeline And Hazardous Materials Safety Administration (PHMSA) thru cooperative agreement Provides OQ evaluations and O&M procedures, in addition to DIMP

Distribution Integrity Management Programs (DIMP) Rule Proposed in June, 2008 Reviewed by technical committee December, 2008 Final rule expected in late months to develop written DIMP plan APGA SIF is developing a model plan and plan development tool

Introducing SHRIMP! Simple, Handy, Risk-based Integrity Management Plan

SHRIMP On-line software product similar to tax preparation software (TurboTax) SHRIMP asks the user a series of questions about the system and its inspection and maintenance history Questions change based on answers Output will be a nearly complete DIM Plan

SHRIMP Timing Due 6 months after final rule GOAL: Have SHRIMP trial version available when final rule is issued (~ Fall, 2009) That way utilities can decide whether to use SHRIMP or other means to develop DIMP

SHRIMP Development Advisory Group made up of state regulators, federal regulators and industry Technical Toolboxes is software developer Heath and Associates, Technical Consultant Viadata, Technical Consultant

Hypothetical Case Study The following is a case study of how SHRIMP will work to assist a user to develop a DIM plan

Welcome to Kastanopolis, 1950 Downtown business district Residential 1” – 4” Bare, unprotected steel mains and services, MAOP = 10 psig 6” steel, 150 psig

Kastanopolis Expands, 1975 New residential Mall 1” – 4” Coated, Protected steel 10 psig

Kastanopolis Expands Further, 2000 New residential ½” – 4 “ PE, 60 psig

Kastanopolis, today New mall construction New residential construction Ongoing bare steel replacement program (begun in 2003)

Running SHRIMP Go to the website distribution.com/ distribution.com/ Enter OPS ID or pick your state Pick your system from list or enter name SHRIMP is pre-loaded with OPS Annual Report Data User is asked to verify it is correct

1 st Step: Threat Assessment Asks questions to assess the probability of each of 8 threats to distribution integrity: – Corrosion – Excavation – Natural Forces – Other Outside Force – Equipment Defect/Failure – Material Defect/Failure – Inappropriate Operations – Other

Know Your Infrastructure Involve your “Subject Matter Experts” – the people who inspect and maintain the system Assemble your construction, inspection and maintenance records SHRIMP provides a list of suggested records at the beginning of each threat assessment

Corrosion Threat Groups Coated, CP protected steel Bare unprotected steel Plastic mains and services

Corrosion Leaks Repaired

Trend in Corrosion Leaks Repaired

Corrosion Threat Groups Coated, CP protected steel Group EC1: Bare steel Between 4 th Ave and the Creek Group EC2: Remaining bare steel Plastic mains and services Feeder main – Bare steel

Natural Forces Threat Groups Creek crossings 1950 feeder main installed by trenching and is vulnerable to erosion New crossing installed By boring and is too deep to be vulnerable to erosion

Excavation Threat Groups New mall Construction New residential Construction

2 nd Step: Factoring In Consequences Risk = Probability times consequences of a failure Transmission IMP focused on identifying high consequence areas DIMP avoids this – because almost all areas served by distribution are populated, therefore all areas are high consequence SHRIMP does consider consequence, however

Consequence Factors User is asked for each group would a failure here have greater consequences than average because of: – Larger diameter/higher pressure than most – In the business district under wall-to-wall pavement – The significance of the facility, and/or – The response time to get crews to it should it fail

Example: Corrosion Threat Groups Group EC1: Bare steel Between 4 th Ave and the Creek – Consequence: higher in business district Average in unpaved areas

Corrosion Threat Segments Group EC1a: Bare steel Between 4 th Ave and the Creek – Consequence: higher in business district Group EC1b: Bare steel Between 4 th Ave and the Creek outside the business district – Consequence: Average in unpaved areas

Excavation Threat Segments New mall Construction New residential Construction

3 rd Step: Risk ranking Threat groups are ranked from highest lowest by SHRIMP 1.Corrosion on bare steel in the business district 2.Excavation near the feeder main 3.Excavation on the Northeast side 4.Corrosion on bare steel near the creek outside the business district 5.Natural forces on 1950 creek crossing User can change the order, and enter an explanation why

4 th Step: Select Additional/Accelerated Actions Starting with the highest relatively ranked threat, SHRIMP asks the user to choose actions to reduce the risk SHRIMP offers suggestions (from GPTC Guide) If user is already doing something about any threat, that can be written into the DIM Plan

Additional/Accelerated Actions

5 th Step: Select Threat-Specific Performance Measures For each Additional/Accelerated Action, SHRIMP asks the user to select a performance measure SHRIMP uses the GPTC list for each threat The selected A/A Action will affect SHRIMP’s recommended performance measure

Performance Measures

Step #6: Create Written DIM Plan Summarizes all decisions made in previous steps Addresses all seven required elements Will include required provisions on LEAKS, EFVs and possibly (likely) mechanical coupling failure reporting

Potential audience Intended for small systems – will be free Could be used by larger utilities for isolated distribution systems (e.g. cities and towns with essentially stand-alone distribution systems There will be a nominal fee for larger systems to support improvements and technical support

Questions?