10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.

Slides:



Advertisements
Similar presentations
CESG, Fall 2011, 5 th November 2011 Stuart Fowell, SciSys Device Virtualisation and Electronic Data Sheets.
Advertisements

05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
November SLS RFM and RNG REPORT 18 November 2004.
7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Spacecraft Onboard Interface Services Application Support Services Working Group (SOIS-APP WG) CCSDS Spring 2013 Meeting.
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
07-Apr-2014-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
07-Apr-2014-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
31 st October – 4 th November 2011 Fall 2011 Meeting Agenda Boulder, Colorado, USA SOIS Application Support Services WG Conclusions & Actions.
Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
Chris Taylor TEC-EDS 1 SOIS Prototyping Activities CCSDS SOIS Berlin 2008 C. Taylor ESA- ESTEC.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
May11-cesg-1 status:OKCAUTIONPROBLEM comment: Very Good SOIS Area Report Wireless WG Goals for the spring meeting Complete the discussions and agree on.
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
16 th – 19 th April 2012 Spring 2012 Meeting Agenda Darmstadt, Germany SOIS Application Support Services WG.
15 th -18 th October 2012 CCSDS SOIS Application Support Services WG Fall 2012 Meeting Cleveland, Ohio, USA.
Spacecraft Onboard Interface Services Application Support Services Working Group (SOIS-APP WG) Use Cases Identified in ESA TRP Project CCSDS Spring 2013.
SOIS Plenary Session Spring 2015 Meeting Chris Taylor ESA.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
SOIS APP Working Group Overview. Presentation Overview Application Support Services Electronic Datasheets ESA Project History and Plans Standards Documentation.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Nov11-cesg-1 SOIS Area Report Wireless WG Primary Objectives for the fall meeting Establish lessons learned from the Asset Management (AM) Magenta Book.
IPR WG REPORT November Information Packaging and Registries WG REPORT November 2004.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
CCSDS SOIS Wireless Working Group (WWG) 01-Sep-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 01-Sep Sep-2015.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
CCSDS SOIS Wireless Working Group (WWG) 16-Sep-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 16-Sep Sep-2015.
ESA UNCLASSIFIED – For Official Use CCSDS SOIS Overview - Fall 2015 Martin Suess 07/10/2015.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
CCSDS SOIS Wireless Working Group (WWG) 04-Aug-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug New ESA Wireless WG member.
SEA-1 20 Nov 2014 CCSDS System Engineering Area (SEA): System Architecture WG (SAWG) Restart Peter Shames, SEA AD 20 Nov 2014.
1 SOIS P&P input. 2 Introdcution As part of the work to standardise onboard communication services, the CCSDS SOIS WG has recently delivered new draft.
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 09 October SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
07-Apr-2014-cesg-1 Jonathan Wilmot (WG Chair) Ramon Krosley (DWG Chair) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA APP WG.
SM&C WG Plenary CCSDS Spacecraft Monitoring & Control WG (SM&C) Workshop #17, Darmstadt (D), Apr 2012 Mario Merri, ESA/ESOC, Chairman.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
Spacecraft Onboard Interface Services Application Support Services Working Group (SOIS-APP WG) CCSDS Spring 2013 Meeting.
Chris Taylor TEC-EDS 1 Communication Management CMD & Data Acquisition Services Time Access Service File & Packet Store Services Message Transfer Service.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug-2015
CCSDS SOIS Application Support Services WG
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
SOIS Application Support Services WG – Fall 2009 Meeting
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACE INTERNETWORKING SERVICES (SIS) AREA
SOIS-APP Working Group Report Jonathan Wilmot (WG Chair)
Delta-DOR WG: Report of the Fall 2010 Meeting
Joint IPR/DAI Workshop
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACECRAFT ONBOARD INTERFACES SERVICES
Presentation transcript:

10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA

10-Dec-2012-cesg-2 1. Application Support Services WG 2. Wireless WG 3. Subnetwork Services WG (Inactive) SOIS Area Report - Current Working Groups The SOIS area covers onboard communication services with the intention of standardising H/W and S/W interfaces between avionics elements & devices. Wireless activities cover intra-spacecraft communication, AIV and RFID Our work is aligned with the European SAVOIR initiative and the WG includes representatives from the US SUMO initiative

10-Dec-2012-cesg-3 SOIS Area Report B. Meeting Demographics App Supt Svcs

10-Dec-2012-cesg-4 Application Support Services Working Group Goal: Develop SOIS Application Support layer services and if appropriate protocols; develop supporting electronic data sheet schema and dictionary of terms Working Group Status RIDs from CESG from poll Green Book Issue 2 resolved and ready for CCSDS secretariat preparation for publication Device Enumeration Magenta Book under CMC vote for publication Device Virtualisation Red Book under CCSDS secretariat preparation for Agency review Progressing Electronic Data Sheets Red Book & associated XML Schema Progressing Common Dictionary of Terms Red Book & associated ontology Status:OKCAUTIONPROBLEM Comment: Funding insecure for level of work SOIS Area Report

10-Dec-2012-cesg-5 Application Support Services WG (cont.) Progress Results of exploratory prototyping of EDS XML schemas by ESA and NASA available 2 draft schema available 2 prototype tool chains developed to support use of EDS XML schema Draft Red Book for Dictionary of terms available for WG review Consolidated SUMO, NASA-JSC and NASA-GRC contributions and developed shared work plan Identified need for a new green book to describe use of EDS XML schema Identified need to agree approach for interoperability testing of EDS XML schema Planning Publish remaining Green and Magenta Books Continue fortnightly telecons via WebEx Merge ESA & NASA schemas into a single specification Update tool chains to support new schema Establish cooperative environment for developing schema under config control Propose project for new green book Extend Common DoT taxonomy with common terms for examined ICDs Include Reprogrammable FPGA as use case Determine approach for testing SOIS Area Report

10-Dec-2012-cesg-6 Application Support Services WG Near Term Planning SOIS Area Report ActivityMilestonePlanned end date XML Specification for Electronic Data Sheets for Onboard Devices Blue book Draft 1 – Fall 2013Blue Book End 2014 Electronic Data Sheets XML SchemaDraft 1 – Fall 2013SANA End 2014 Common Dictionary of Terms for Onboard Devices Blue book Draft 1 – Fall 2013Blue Book End 2014 Common Dictionary of Terms ontologyDraft 1 – Fall 2013SANA End 2014 EDS Green bookDraft 1 – Spring 2014Green Book End 2014

10-Dec-2012-cesg-7 status:OKCAUTIONPROBLEM comment: Wireless WG Goal : Develop wireless recommendations for onboard space applications Working Group Status : Group did not formally meet but have been operating via Webex Green book issue 2 covering high rate Wireless technology submitted to CCSDS secretariat New work items proposed by NASA JSC (Encoding for RFID, Spacesuit comms) SOIS Area Report Progress Green book issue 2 finished Planning Prepare new Project for submission to CESG

10-Dec-2012-cesg-8 Wireless WG (continued) Near Term Planning SOIS Area Report ActivityMilestonePlanned end date Wireless Green Book issue 2 Submission to editor October 2013 Prepare new projectsAgreement by CESG/CMC January 2014

10-Dec-2012-cesg-9 APP WG Remaining Magenta book ready for Agency review Electronic data sheet activities on schedule Need for standalone EDS Green Book identified as handbook In order to validate the schema tool chains are required this was unplanned effort Unclear what testing will be required Wireless WG Initial work complete with the submission of Green book issue 2 covering High rate wireless technology New work items in preparation SOIS Area Report: Summary