Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.

Slides:



Advertisements
Similar presentations
OO Star Wind Floater A robust and flexible concept for floating wind
Advertisements

Edit this text for your title
®.
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
Safinah Ltd The resource to manage your coating risk – minimising your costs wherever you are European Coatings Conference Review of.
SHIPYARDS: Differences between Tankers and FPSO Specification
Group Work Offshore Energy Case Study The Nordic Association of Marine Insurers 1.
Line Efficiency     Percentage Month Today’s Date
Our Profile Corporate Milestone MSE start to established First Dry-docking repair for bulk.
© OTM Consulting Ltd, The information contained in this document is believed to be accurate, but no representation or warranty, express or implied,
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
ISO Wellhead Integrity
Aberdeen-Stavanger Gateway. DOF Subsea 2 Welcome Giovanni Corbetta, Managing Director DOF Subsea, part of the DOF Group.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine operations Kværner ASA, UiO, Oct
OUTLOOK FOR FPSO ORDERS OVER THE NEXT FIVE YEARS Presentation by Jim McCaul at the Global FPSO Forum 25 September 2014.
Floating Production Systems
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Opportunities to Innovate in Aquaculture with Composite Materials Presentation at 1 st Annual Maine Aquaculture R&D Forum January 14, 2015 Stephen Von.
Deepwater drilling challenges Gm, Drilling – murphy malaysia
1. 2 Organizational Structure OSX Ownership OSX Leasing OSX Shipbuilding Unit OSX Services Free Float Integrated offshore E&P equipment and services provider.
By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does.
Integrated Information Platform for reservoir and subsea production systems Stavanger April 6th 2005.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, UiO,
Petroleum Engineering 406 Lesson 9b Station Keeping.
T +44 (0) W insensys Intelligent Sensing Solutions LIFE OF FIELD INTEGRITY MONITORING FOR SUBSEA ASSETS Lenny Sutherland Director,
INSTALLATION OF TOPSIDE USING FLOATOVER METHOD
Innovative Mooring & Fendering Technology for the Sea Base Dave Liese, PMS 325 Joint Sea Based Theater Access Workshop Duck, NC 8-11 February 2005 Draft.
Overview of SURF Systems & Analysis
TMR4225 MARINE OPERATIONS SPRING 2007 Introduction.
PHASE 7 FACILITIES ENGINEERING
Setting the Scene Presentation at Intsok International Oil and Gas Business Days 2007 by Jim McCaul International Maritime Associates Washington-Houston.
1 Upper Basin Snowpack as of 3/26/2014
FLNG SHELL 3,6 MTPA in the year 2017 will become the World's largest ship floated for the first time at Browse Basin North-Western Australia? How about.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
Complete Storage System Provider Racking system Shelving system Ou Efos Resources No Kompleks Sri Sungai Nibong Jalan Sultan Azlan Shah
1 of 16 6/13/2016 Design of new cylindrical tank system for storage of LNG in FPSO units Jonas Rekstad Inocean AS, Norway.
T o t a l s u b s e a s o l u t i o n s AB-X-PR Subsea 7 Inc. Results for First Quarter April
IMPROVED SEABED ANCHORING TECHNOLOGY Innovation Opportunity Identified at PROTTEC Retreat 26/28 October 2010 Jonathan Williams, Marine South East.
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
1 Spars for Deepwater Developments Don Vardeman VP, Worldwide Projects Anadarko Petroleum Corp September 9, 2009.
Offshore Mooring Systems Market to Global Analysis and Forecasts by Type, Anchorage, Application and Depth No of Pages: 150 Publishing Date: Jan.
Offshore Mooring Systems Market to Global Analysis and Forecasts by Type, Anchorage, Application and Depth No of Pages: 150 Publishing Date: Apr.
© 2016 Global Market Insights. All Rights Reserved Mooring System Market Growth Trend & Forecast by Mooring System Market.
Jan 2016 Solar Lunar Data.
Gas Lift in Subsea Wells
INSTRUCTOR © 2017, John R. Fanchi
Things You Should Know About Cantilever Rack
Average Monthly Temperature and Rainfall
Alejandro F. Ameglio – Head Technical Services Tenaris Rods Division
Riser and Flowline Hose Systems Design to Installation
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
CMX scope and functionalities
Riser and Flowline Hose Systems Design to Installation
Welcome to the World of Trelleborg TRELLEBORG GROUP.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Characterization Behaviour of Novel Composite Deepwater Risers Amaechi Chiemela Victor 2nd Year PhD Student – Engineering Department Supervisor: Prof.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
A Numerical Modeling Approach of Composite Riser Hoses Amaechi Chiemela Victor 3rd Year PhD Student – Engineering Department Supervisor: Prof. Jianqiao.
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Petro Data Mgt III- Facilities
Presentation transcript:

Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC Floating Systems 31 March 2004

Innovative Technologies, Creative Solutions FPSOs are a Mature & Versatile FPS Technology Over 100 units in operation worldwide FPSO total > than all other FPS combined Water depth range 20 m to > 1,400 meters 1 to 100+ risers 10,000 bbl – 250,000 bbls/day Up to 2,000,000+ bbls storage Benign (West Africa) to Extreme Environments (North Atlantic) Various flavors: Turret-moored Spread-moored Yoke-moored Hawser-moored

Innovative Technologies, Creative Solutions Typical Permanent Internal Turret System Bearing (only upper in this case) Turret Shaft / Riser Guide Tubes Chain Table (Hawse Pipes/Chain Supports) 6 Anchor Legs + 34 Risers Barracuda FPSO: Campos Basin 834m, 34 Risers Swivel Stack (Product/Lift/Controls) Anchor Leg + Riser Pull-In Equipment Manifolds + Pig Launching/Receiving

Innovative Technologies, Creative Solutions Design Considerations Mooring System Anchor Legs Anchors Risers Thrusters & DP Control Environment Water Depth Waves Wind Current Vessel Particulars Storage / Tonnage Topsides Layout Vessel Motions Turret Design Configuration Size Location Loads Turret Mooring of Production Vessels Fluid-Transfer Requirements Well Heads Subsea Manifolding Risers Turret Manifolding Swivels Offloading Pigging

Innovative Technologies, Creative Solutions Some Current Turret Mooring Challenges More Complex Turret Systems –Large number of risers –Increased requirements for turret mounted equipment –High pressures Riser Systems for very Shallow or Deep Water Project Schedule –Short, fast-track schedules –Project Design Basis not well defined –Interfaces and Communication Installation in Deepwater –Installation engineering, equipment, costs

Innovative Technologies, Creative Solutions Example 1: Fast-Track FPSO for Shallow Water Su Tu Den FPSO, Vietnam MODEC, Inc + FMC SOFEC + ConocoPhillips Newbuild FPSO (80,000 bbl oil/day) Schedule: Contact to First Oil – 19 months –Turret Delivery Schedule – 12 months Shallow Water (48m water depth) Harsh Environment (100-yr wave of 8.1m Hs) Large Number of Risers (12)

Innovative Technologies, Creative Solutions Project Milestones 2002 Mar. Contract Award (LOI)(2002/03/21) 2002 Apr. Order Long Lead Items – bearing, forgings, process 2002 Jun. Mooring Design Complete 2002 Aug. Turret Fabrication Begins (MSE) 2002 Oct. Hull Fabrication Begins (Samsung) 2002 Nov. Preliminary Riser Design Complete 2002 Dec. Topside Fabrication Begins 2003 Mar. Drydock – Block Assembly Begins 2003 Apr. Start Topside Module and Turret Installation 2003 May Launching 2003 Jul. Start Shipyard Commissioning 2003 Sep. Tow Out 2003 Oct. Offshore Installation 2003 Oct. 1st Oil (2003/10/29)

Innovative Technologies, Creative Solutions STD Turret Mooring Design & Fabrication Use Standard Components & Design –SOFEC Large External Turret Design Bearing Capacity exceeds anticipated Design Loads –Allows order of main components before final loads derived Design Riser Configuration Flexibility in Chain Table Design/Fabrication Clearly Define all Structural and Fluid transfer Interfaces at Turret Support Structure Parallel Design and Fabrication Effort Easy / Quick Integration with Vessel

Innovative Technologies, Creative Solutions Riser & Mooring Design in Shallow Water

Innovative Technologies, Creative Solutions Mooring and Riser Design 2

Innovative Technologies, Creative Solutions Integration of Turret & Vessel

Innovative Technologies, Creative Solutions First Oil: November 2003

Innovative Technologies, Creative Solutions Application –FPSO weathervaning SPM –Large field (>100,000 bbld) –50 to 100+ risers –Deep to ultra deep water –Worldwide Weathervaning advantages –Mooring tensions –Tandem offloading Simplified turret structure –Allows for simple interface with vessel Robust bearing system Large Decks for Flowline Manifolding, and other Equipment Efficient Mooring & Riser Installation Equipment Example 2: Very Large Turret

Innovative Technologies, Creative Solutions Chain Table I-Tubes Support Columns Chain Supports Main Deck Torque Arm Vertical Bearing Radial Bearing Swivel Stack & Torque Tube Piping / Manifolding Riser Hang-Off Pull-In Deck Anchor LegsRisers & Bend Stiffeners VLT: Deep Water, Large Capacity Internal Turret

Innovative Technologies, Creative Solutions VLT Chain Table 3x3 mooring provides 3 riser corridors Riser quantity defines chain table (and turret) diameter –60 risers - 22 m dia –90 risers - 31 m dia –120 risers - 40 m dia 2 riser rows maximum No shadowing to allow inner row installation and replacement

Innovative Technologies, Creative Solutions VLT Main Deck Supports all loads, including: –Riser hang-off loads –Mooring loads through chain table and support columns –Turret self weight Depth-to-diameter ratio is a key design parameter –Flexibility to move with vessel –Strength to support risers, mooring and turret weight loads –2.5 m depth / 32 m diameter for a 90 riser VLT

Innovative Technologies, Creative Solutions Conclusions Turret Moored FPSOs are a Very Mature Technology –Design for Load Transfer is typically not an issue –Current challenges mostly associated with Fluid Transfer Large Number of Risers High Pressure Manifolding Subsea Intervention & Control Project Parameters also Impact Turret Mooring Design –Schedule Fast-track: 18 – 22 months Complex systems require more commissioning time –Communication & Interfaces – among various contractors / client –Knowledge of others scope of work, issues, etc.