PACS IBDR 27/28 02 02 BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
R I T Advisors: Dr. Wayne WalterMechanical Engineering Dept. Faculty Jeffrey WebbTeacher’s Assistant Team Members: Aman Verma EE - Electrical Craftsman.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
LSU 10/09/2007System Design1 Project Management Unit #2.
EUSO General Meeting – Huntsville May 2003 FEW WORDS ON AUGER-EUSO Presented by Osvaldo Catalano.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
PACS IBDR 27/28 February 2002 PACS Grating Assembly1 Grating Assembly E. Renotte Centre Spatial de Liège (B)
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
Groningen, 1-2 February 2001 FPU Preliminary Design Review1 First Stage Cryogenic IF Amplifier Centro Astronómico de Yebes Observatorio Astronómico Nacional.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Budgets and Interfaces.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
T1 Electronic status Conclusions Electronics Cards:
Peer Review Agenda (Suggested).
GLAST Large Area Telescope
Systems Engineering Bob Goeke.
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
Krzysztof Czuba ESS LLRF Quarterly Meeting
Command and Data Handling
Project Management Unit #2
Electronic : PH0 (former IH0)
Presentation transcript:

PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN - D. SCHMITT - T. TOURRETTE QA/PA: N. COLOMBEL - L. DUMAYE - F. LOUBERE - V. MAUGUEN AIV: C. BONNIN - … Test Equipments: F. DALY - P. DE ANTONI - M. DONATI - E. POINDRON

PACS IBDR 27/ BOLC/BOLA2 BOLC/BOLA Design (1) BOLC design –Electrical 4 board types: –BAB (Bolometer Analog Board) - 5 x 32 analog channels –BIAS (Bolometer Bias & Clock translator) - x 3 –DAQ_IF (Data Acquisition & transfer to DMC) - 1 M + 1 R –BOLC_BP (passive BackPlane) - x1 1 independent module: –PSU (Power Supply) –Mechanical Electronics boards are mounted on stiffeners Modules (electronics boards+stiffeners) - x10 - are plugged and locked into an enclosure which also supports the backplane PSU BOLC box bottom (mechanical & thermal IF specified)

PACS IBDR 27/ BOLC/BOLA3 BOLC/BOLA Design (2) Secondary power Connectors BOLC main box PSU Top cover Connectors to/from FPU (x18) Connectors to/from DMC (x4) Primary Power + bonding stub

PACS IBDR 27/ BOLC/BOLA4 BOLC/BOLA Design (3) BOLA design –Electrical 2 board types: –B_BOLA (Diff Amp.*+Filter for Blue Bolometer): x4 –R_BOLA (Diff Amp.*+Filter for Blue Bolometer): x2 * Diff Amp. Uses JFET pairs (x160) –Mechanical Electronics Boards are mounted on individual stiffeners Modules (Board+stiffeners) are stacked Top cover & base plate (with feet) on each side of the « stack »

PACS IBDR 27/ BOLC/BOLA5 BOLC/BOLA Design (3) “BLUE” Modules (x4) “RED” Modules (x2) Top cover Base plate with feet

PACS IBDR 27/ BOLC/BOLA6 BOLC/BOLA Status (1) Status: –H/W Readout: –8 channel prototype (BAB) functionally tested - Awaiting for performance tests on real bolometers –BIAS board designed (waiting for spec. Validation) –BIAS FPGA is ready –SimBOLC BIAS fabrication started (avail. 4/03) –BOLA modelling in progress –New grounding scheme under preparation * Control: –DAQ_IF FPGA VHDL ready - –SIMBOLC DAQ_IF under fabrication (avail. 04/03) –300mK temperature channel design is validated (jan. 02) –« >1K », Heater control design tests in progress (  end of march) Mechanical –Overall Design (Stiffener+box) are ready –Detailed Design is started (13/02) * (elec.+meca. grounds inside BOLC)

PACS IBDR 27/ BOLC/BOLA7 BOLC/BOLA Status (2) Status …: –Test Equipments LTU –Preliminary specification available –Full specification in progress –Software specification is started FPU simulator –Specification available –Electronics Boards in fabrication –Software implementation in progress BOLG (BOLA test cryostat) –“Pulse tube” cooler available –Cryostat specified –Documentation BOLC/BOLA Specifications - SAp-PACS-CCa BOLC/BOLA ICD - SAp-PACS-CCa BOLC/DMC E ICD - SAp-PACS-CCa FPU simulation Specifications -SIG-PACS-PDA Instrument Description Document contribution: BOLC/BOLA units description

PACS IBDR 27/ BOLC/BOLA8 Budgets BOLC –Outer envelope: 382,5 x 289 x 333,5 (L x D x H - mm) –Mass kg (previous) kg (updated) Allocation *: 14.5 kg –Power consumption Max. Average: W Allocation: 35 W * Refer to IID-B 2.0 BOLA –Outer envelope 162 x 119 x 121 (L x D x H - mm) –Mass 1.7 kg Allocation: 2.6 kg –Power dissipation Average: 0.2 W Allocation: 0.2 W

PACS IBDR 27/ BOLC/BOLA9 Models Definition From “Development Plan” document: –BreadBoards: to validate electronics designs (in particular: detector readout & drive electronics) * –STMs: to validate (vibration & thermal) BOLC, BOLA, PSU mechanical structure * –Simulator: to validate IF with DMC - BOLC only * –EMs: to perform electrical compatibility tests PSU-BOLC - PSU only * –QMs: QM1: to validate design & electrical IF with PhFPU QM2: full qualification model * –FM: full model … –FS: spare boards only * : not for delivery

PACS IBDR 27/ BOLC/BOLA10 Models Summary SystemsS/S L1 S/S L2 S/S L3 STMEMQM1QM2FMFS BOLCReadoutBAB-R BAB-B BIAS ControlDAQ_IF BOLC_BP Box BOLADIFFAMP BIAS_Filter Box PSU11 Power bench STM EM 1 HarnessBOLC/DMC---22 PSU/BOLC---22

PACS IBDR 27/ BOLC/BOLA11 PA / QA Plan & Activities Documentation available: –Standard Product Assurance Plan: SAp-GERES-FLo issue 1.0 of 09/11/2000 –BOLC/BOLA DCL: SAp-PACS-VM issue 10 of 01/2002 –BOLC/BOLA DML: SAp-PACS-NC issue 0 of 01/2002 –BOLC/BOLA DPL: SAp-PACS-NC issue 0 of 01/2002 Documentation in preparation: – BOLC/BOLA FMECA Draft available Final document in correction/amendment phase: –Available by end of February (ref: SAp-FLo )

PACS IBDR 27/ BOLC/BOLA12 AIV Plan & Activities AIV activities diagram is available for –QM1 –QM2 –FM Test configurations document is available in draft form Test equipments required are identified & defined –Factory Support Equipment (FSE) for post-fabrication testing (1 per electronics board) –Local Test Unit (LTU) for DMC interface simulation –FPU simulator for PhFPU simulation

PACS IBDR 27/ BOLC/BOLA13 Problem Areas (1) BOLA thermal interface with S/C –Problem: minimum operating temperature (120K) not accepted by ESA. –Solution(s): Evaluate performance (mainly noise) of JFET at lower temperature (≥ 50 K) Built up of BOLA thermal model (JFET self heating evaluation) BOLC mechanical interface with S/C –Problem: Need for formal agreement to proceed with mechanical manufacturing –Solution(s): depends on boxes configuration on panel H/W is frozen: mechanical design update is difficult Connector back-shell update

PACS IBDR 27/ BOLC/BOLA14 Problem Areas (2) BOLC specification confirmation: –Problem: still waiting for detector test results –Solution(s): start designing boards not dependent of bolometer characteristics (DAQ_IF & BackPlane) Component cost –Problem: current estimation exceed initial estimation –Solution(s): …

PACS IBDR 27/ BOLC/BOLA15 Schedule / Milestones