9.403.70 7 May 2003 Long-term Mine Reconnaissance System (LMRS) Update Presented to:Mine Warfare Association Presented by:CAPT John D. Lambert, USN Program.

Slides:



Advertisements
Similar presentations
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Advertisements

SIM Program Status FFY Q1, SIM Program FFY 14 Q1 Status SIM Program Overall Status and Description: Overall Status Key delays and issues in evaluation.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
People First System Upgrade Overview March 22, 2010.
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
Naval Division 08 Thales Naval UK. 2 Naval Division – 08 NAVAL INDUSTRIAL FOOTPRINT France UK Netherlands Germany Australia JV Samsung Thales (STC) South.
1 Material Identification Reflectivity Kernel (MIRK) for MCM/Mining Single Pass Detect-to- Engage (DTE) Operations Radm John Pearson, USN (Ret) 9 MAY 2012.
1 MANO: An AUV for Engineering and Science Research Alison Proctor.
TEAM Training: Program Management Last Update: May 2011.
Bastien DURAND Karen GODARY-DEJEAN – Lionel LAPIERRE Robin PASSAMA – Didier CRESTANI 27 Janvier 2011 ConecsSdf Architecture de contrôle adaptative : une.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
1 6/11/2015 8:34:35 PM Approved for public release; distribution is unlimited. Case GOVT , 02 October 2006 Future Combat Systems SOS Characteristics.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Undersea Warfare.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Partnership in Unmanned Marine Systems GATE Electronics TR Technologies TURKEY.
Server Virtualization: Navy Network Operations Centers
March 2004 New Technologies For Improved Operational Testing Of Unmanned Underwater Vehicles Naval Sea Systems Command Naval Undersea Warfare Center
CBM + Program Implementation
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Doug Bellomo April 6, NFDA Retreat & Conference “Risk MAP--Foundation, Transition, Integration” Risk MAP: An Update to NFDA.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Mine Warfare Association Deputy PEO (Littoral and Mine Warfare)
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
1 IMPAC II SW Development Life Cycle Requirements Analysis Preliminary Design Detailed Design PrototypeBuild - Test Documentation Conversion & Pilot Production.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
Product Manager Clothing Individual Equipment Personnel Airdrop Systems Team PROGRAM STATUS UPDATE TO PIA February 2008 The Soldier: America’s Most Deployed.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Program Management The Financial Sector Presented by Bob Walker 3 shaping the future of program management
WESMAR Defense Products Company WEB System Presentation By: Aziz Sonny Hakimi International Sales Manager WESMAR.
Terra Remote Sensing. Terra Remote Sensing Inc. is an internationally based Canadian remote sensing company with a background of 40.
FHWA Office of Operations Research and Development Executing the Vehicle-to-Infrastructure Research Program: Enabling Technology September 25, 2013 Deborah.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
2003 USSOCOM SOF CBRN CONFERENCE DECONTAMINATION UPDATE
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES CRITICAL DESIGN REVIEW.
The use of scenarios to develop Concepts of Operation for unmanned vehicles 19 ISMOR 30th August Michael Tulip.
23 July 2003 PM-ITTS TSMOTSMO Information Assessment Test Tool (IATT) for IO/IW Briefing by: Darrell L Quarles Program Director U.S. Army Threat Systems.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
1Autonomous Ops Above Core Br f v1 - 1 Feb 00 UUV PROGRAM Proposed Capability: Undersea Autonomous Operations: ISR, Battlespace Preparation, Target Cueing.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
CNA Mainstreaming mine warfare: Fleet initiatives 26 July 2001 MINWARA conference CNA Sabrina R. Edlow CNA.
Oracle Services Procurement
Mine Warfare - A Total Force Approach for the Future
Autonomous Mission Management of Unmanned Vehicles using Soar Scott Hanford Penn State Applied Research Lab Distribution A Approved for Public Release;
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
1 Containerized Towing / Handling Equipment System with ISO base can be anchored to deck with bolts or ISO corner fittings to provide ability to reconfigure.
Approved for public release; distribution is unlimited. 10/7/09 Autonomous Systems Sensors – The Front End of ISR Mr. Patrick M. Sullivan SPAWAR ISR/IO.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
COMMAND STAFFING Presented by Adrienne Somerville AIR 2.0 Technical Lead 26 July 2007 Enabling the Right Skills At the Right Time To Accomplish the Right.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Naval Weapons Systems NSC 201
Multi-year Trends and Event Response
9th Annual Expeditionary Warfare Conference Protection of the SEA BASE
Hybrid ROV (HROV) Fiber Optic Cable Design
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Joint Protection of the Sea Base
Lockheed Martin Canada’s SMB Mentoring Program
AOFR: Assessment of Operational Field Readiness
Joint Warfare Training Center (JWTC)
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Conventional Facilities
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

May 2003 Long-term Mine Reconnaissance System (LMRS) Update Presented to:Mine Warfare Association Presented by:CAPT John D. Lambert, USN Program Manager Unmanned Undersea Vehicles, PMS403 (202) Presented to:Mine Warfare Association Presented by:CAPT John D. Lambert, USN Program Manager Unmanned Undersea Vehicles, PMS403 (202)

Page 2 Outline  Long-term Mine Reconnaissance System (LMRS) Update  Pre-Planned Product Improvements (P 3 I) Update

Page 3 SYSCOMs Identify Alterations CLF/CPF Hold BRB & Promulgate Approved Baseline D-30 D-29 D-28 D-25 D-24 D-13 D-10 D-7 D-6 D-5 D-2 D-0 D+2 CLF/CPF Promulgate BF Composition & TCD NAVSEA 06 Hold IBR & Promulgate Initial Baseline NAVSEA 06 Start BFI eCCB Process NSWC/NUWC Complete Platform Certification BF Provide Feedback to FLTCINC CLF/CPF Hold Pre-BRB CLF/CPF Hold Pre-TCD Conference NAVSEA 06 Complete BFIT Using the DEP TCD NAVSEA 06 Final CAPs&LIMs BF FLTEX & JTFEX Planning Execution Validation BGSIT Assess & Fix D-2D-4 FLTEX D-5 Platform Certification Assess & Fix Assess & Fix D- 18 D-13D-12D-7 D-6 BFIT Baseline Definition Baseline Modification & Install Baseline Deployment BF/CLF/CPF COMPTUEX & BGSIT Notional D-30 Process

Page 4 AN/BLQ-11 (LMRS) Torpedo Tube Launch and Recovery 2 Autonomous UUVs Single Sortie Reach nm Total Area Coverage nm 2 Area Coverage Rate nm 2 /day Multiple Sorties Single Sortie Reach nm Total Area Coverage nm 2 Area Coverage Rate nm 2 /day Multiple Sorties RF and Acoustic Communications RF and Acoustic Communications Forward Looking Search Sonar Forward Looking Search Sonar Side-Look Classification Sonar Side-Look Classification Sonar Status  EDM Contract to Boeing 11/99  Critical Design Review Completed 11/00  UUV #1 Completion: October 2002  Developmental Testing: 2nd Quarter FY04  Operational Testing: 4th Quarter FY04  IOC December

Page 5 FY00FY01FY02FY03FY04FY05FY06FY07 CDR 1st2nd3rd4th1st2nd3rd4th1st2nd3rd4th1st2nd3rd4th1st2nd3rd4th1st2nd3rd4th1st2nd3rd4th1st2nd3rd4th Milestones Development Test & Evaluation Production STR IOC CVBG POM CVBG Deploys with LMRS DT IIA DT IIB 222 LMRS Program Schedule MS III Contract Award Delivery of UUV #1 Delivery of UUV #2 DVT DT IIC (OPEVAL) DT IIC (TECHEVAL) Contract Award

Page 6 LMRS Hardware

Page 7 Recovery Arm C&C Battery Monitor System Power Conversion and Spares Stow Turnaround Equipment Stow BMS MPAC MOC UUV BMS = Battery Monitoring System MOC = Mission Operator Console MPAC = Mission Planning and Analysis Battery Shipboard Deployed Equipment (SDE) Layout in Host Submarine Torpedo Room Recovery Arm with Hoop Spider/Winch

Page 8 M-241 Vehicle Recovery Risk Reduction  Hydrodynamic Analysis and Design Determined Form Factor of Two Tube Launch and Recovery Facility (TTLRF)  SSN688 and TTLRF Commonality Near Starboard Shutterway Region –TTLRF is a Geometric Match to a SSN688 in this Area –Exterior Shutter Region a Hydro “Flow” Match to SSN688 –Internal Flow of Shutter Way Designed to Match as well 688 Shutter Way Region Two Tube Recovery Facility Mounted Below Fox Island’s Test Barge Range Test and Evaluation Fox Island Laboratory

Page 9 LMRS P 3 I Upgrades  Second LMRS EDM System Under Contract  Synthetic Aperture Sonar (SAS) –Increases MCM Search Effectiveness (1000 yd vs. 150 yd Swath) –Provides Higher Resolution Images (1” x 1”, Near Identification vs. 3” x 3”) –At Sea Data Collection Complete 4/29/02 –LMRS SAS Design in Progress  Precision Underwater Mapping (L-PUMA) –Provides Precision Bottom Bathymetry Capability –Improves Forward Looking Sonar (FLS) Capabilities in High Clutter Environment –Enables Change Detection Techniques to Significantly Improve Search Rate –Integrates UUV Data into SSN Combat System Displays  Improved Acoustic Communications (ACOMMS) –Downloads Mission Data. Updates Mission Tasking. –“In-Stride” Search, Localization, Classification and Avoidance MCM Capability Set Not Available in Any Other System

Page 10 2 Units DT IIB TECHEVAL OPEVAL MSIII IOC Detailed Design UUV EDM #2 Fabrication Range Test/FOTE Prototype Development & Lake Test 21” UUV Integration & Test Preliminary Design Detailed Design EDM Integration EDM Sonar Avail Component Fabrication Range Testing FOTE FY02FY03FY04FY05FY06FY07FY08FY09FY10 SAS/ACOMMS LPUMA SAS/ACOMMS & L-PUMA Integration Design/Demo Prototype Design UUV Evolution Plan P 3 I Technology Insertion Points LMRS

Page 11 Summary  LMRS Hardware Completed –Recovery System Tested Underway  LMRS On Track for Dec 2004 IOC  LMRS P 3 I Will Significantly Enhance MCM Capabilities  Additional Details in “UUV Test Results and Future Plans” Presentation Tomorrow Morning

7 May 2003 Long-term Mine Reconnaissance System (LMRS) Update Presented to:Mine Warfare Association Presented by:CAPT John D. Lambert, USN Program Manager Unmanned Undersea Vehicles, PMS403 (202) Presented to:Mine Warfare Association Presented by:CAPT John D. Lambert, USN Program Manager Unmanned Undersea Vehicles, PMS403 (202)