1 CMBG 2009 Nuclear Configuration Management Technology Solutions June 30, 2009 Kent Freeland Vanya Yordanova WorleyParsons Europe Energy Services RISK.

Slides:



Advertisements
Similar presentations
Software change management
Advertisements

Configuration management
Distributed Data Processing
Presentation by Priyanka Sawarkar
Copyright Hub Software Engineering Ltd 2010All rights reserved Hub Document Manager Product Overview.
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
SUMMER 2005 JUNE ERP Implementation Choices ERP Implementation Methodologies SAP Implementation Methodology (ASAP) Strategic Implementation Decisions.
Software Engineering Institute Carnegie Mellon University Pittsburgh, PA Sponsored by the U.S. Department of Defense © 1998 by Carnegie Mellon.
Managing the Information Technology Resource Jerry N. Luftman
SE 464: Industrial Information systems Systems Engineering Department Industrial Information System LAB 02: Introduction to SAP.
Integration of Applications MIS3502: Application Integration and Evaluation Paul Weinberg Adapted from material by Arnold Kurtz, David.
ERP (Enterprise Resource Planning) IS 553: Final Presentation Jae Chung.
Management Information Systems, 4 th Edition 1 Chapter 16 Alternative Avenues for Systems Acquisitions.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Supplement 02CASE Tools1 Supplement 02 - Case Tools And Franchise Colleges By MANSHA NAWAZ.
Introduction to SAP R/3.
1 Computer Systems & Architecture Lesson 1 1. The Architecture Business Cycle.
Lecture Nine Database Planning, Design, and Administration
Supply Chain Management
Introduction to Systems Analysis and Design
Bar|Scan ® Asset Inventory System The leader in asset and inventory management.
© 1998 Concept Five Technologies Enterprise Application Integration Capability Maturity Model.
Problems with reuse – Increased maintenance costs; lack of tool support; not-invented- here syndrome; creating, maintaining, and using a component library.
This chapter is extracted from Sommerville’s slides. Text book chapter
PHASE 3: SYSTEMS DESIGN Chapter 8 System Architecture.
Database Systems: Design, Implementation, and Management Ninth Edition
Chapter 1 Database Systems. Good decisions require good information derived from raw facts Data is managed most efficiently when stored in a database.
Configuration Management Publications at IAEA
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS LECTURER : NOUF ALMUJALLY 3 – 10 – 2011 College Of Computer Science and Information, Information Systems.
CIS 321—IS Analysis & Design Chapter 1: The World of the Modern Systems Analyst.
INFO425: Systems Design INFORMATION X Finalizing Scope (functions/level of automation)  Finalizing scope in terms of functions and level of.
Categories of Software
Chapter 2 The Origins of Software Modern Systems Analysis and Design.
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
1 Systems Analysis and Design in a Changing World, Fourth Edition.
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
M IGRATING O RACLE F ORMS TO THE W EB - M AKING THE B USINESS C ASE.
AL-MAAREFA COLLEGE FOR SCIENCE AND TECHNOLOGY INFO 232: DATABASE SYSTEMS CHAPTER 1 DATABASE SYSTEMS (Cont’d) Instructor Ms. Arwa Binsaleh.
1 Process Engineering A Systems Approach to Process Improvement Jeffrey L. Dutton Jacobs Sverdrup Advanced Systems Group Engineering Performance Improvement.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
Configuration Management (CM)
1 ITEC 3010 “Systems Analysis and Design, I” LECTURE 8-1: Evaluating Alternatives for Requirements, Environments, and Implementation Evaluating Alternatives.
1 Configuration Management Publications at IAEA Presented By: Kent Freeland WorleyParsons.
AL-MAAREFA COLLEGE FOR SCIENCE AND TECHNOLOGY INFO 232: DATABASE SYSTEMS CHAPTER 1 DATABASE SYSTEMS Instructor Ms. Arwa Binsaleh.
7-1 Computerized Accounting Systems Electronic Presentation by Douglas Cloud Pepperdine University Chapter F7.
Last Updated 1/17/02 1 Business Drivers Guiding Portal Evolution Portals Integrate web-based systems to increase productivity and reduce.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
Software Prototyping Rapid software development to validate requirements.
© 2013, published by Flat World Knowledge Chapter 10 Understanding Software: A Primer for Managers 10-1.
Metadata By N.Gopinath AP/CSE Metadata and it’s role in the lifecycle. The collection, maintenance, and deployment of metadata Metadata and tool integration.
IBM Software Group ® Managing Reusable Assets Using Rational Suite Shimon Nir.
Chapter7 TELECOMMUNICATIONS AND NETWORKS. Content e-Business Systems – Cross-Functional Enterprise Applications – Enterprise Application Integration –
SAM for SQL Workloads Presenter Name.
Making Friends with Your Public Works Department Using GIS Sherry Coatney Intergraph Corporation
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
©Ian Sommerville 2007COTS-based System Engineering Slide 1 COTS-based System Engineering.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Practical IT Research that Drives Measurable Results Vendor Landscape Plus: Enterprise Content Management Suite ECM: A vendor marketing concept, not an.
Chapter 1 Assuming the Role of the Systems Analyst.
Systems Analysis and Design in a Changing World, Fifth Edition
Chapter 8 Environments, Alternatives, and Decisions.
Building Information Systems
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Chapter 2 Information System.
SEWICKLEY, PA.
Enterprise Resource Planning Systems
Presentation transcript:

1 CMBG 2009 Nuclear Configuration Management Technology Solutions June 30, 2009 Kent Freeland Vanya Yordanova WorleyParsons Europe Energy Services RISK Engineering Ltd.

2 CMBG 2009 Overview Nuclear Power Renaissance: New Attention to Nuclear Safety, Engineering and Business Efficiency Information and Process Technology has significantly evolved since 1980’s, and more fully integrate CM with existing processes. New Industry Profile for Configuration Management and Asset Management. Enterprise-level IT Solutions that support Nuclear Business Model, MRO and Configuration Management requirements. Technology comparison: PLM vs. legacy Repository-based New factors in the “Buy/Build” Decision Tree Sample Development of PLM-based Nuclear Power Technology Solution Integration of Legacy Data Management and Outboard Applications

3 CMBG 2009 Types of NPP IT Solutions for CM Departmental Systems (VBNET, Archimed, etc.) Enterprise NPP Maintenance Resource Optimization (MRO) or “CM” system – Technical CM Control Enterprise Resource Planning (ERP) system (SAP, Oracle, Internal) – Financial CM Control

4 CMBG 2009 Nuclear Power Renaissance New Attention to Nuclear Safety, Engineering and Business Efficiency Better understanding of Configuration Management and the elements that create CM, including: o Design Basis Management o Nuclear Knowledge Management o Plant Lifecycle and MRO o Asset Management o Plant Life Extension o Nuclear Business Processes These functions are often regarded as nuclear business processes, with Configuration Management a collateral benefit. Actually, The converse is true: Configuration Management is the principal means to support and facilitate these functions.

5 CMBG 2009 Nuclear Business Functions

6 CMBG 2009 Technology Evolution Information and Process Technology has significantly evolved since 1980’s, and more fully integrates CM with existing processes. 1980’s – 1990’s Centralized computing on expensive, enterprise-based Mainframe or large Departmental computers and hardware. Expensive, resource-intensive operating systems and complex 2 nd /3 rd -generation programming languages. Large, complex and proprietary Relational-design databases with limited choice of design tools and fast obsolescence. Limited GUI Choices Processes and business rules are indelibly coded into the software, and are difficult to adapt to individual NPP work processes, procedures and culture. No Internet Nearly impossible to achieve true Nuclear Configuration Management with these technologies Commercial Nuclear CM and MRO applications during this era are resource-intensive, unpopular and astronomically priced. Internally-developed systems are maintenance-intensive and resist change or update.

7 CMBG 2009 Technology Evolution 2009 De-centralized computing, or low-priced IP networks based on server-router and LAN/WAN architecture. Massive increases in computing power with simultaneous drop in cost. Order-of-magnitude decrease in hardware and infrastructure costs. Availability of inexpensive, or even free, operating systems and simple, open- source 4 th /5 th -generation programming environments and process modeling environments (such as JAVA and IDE). Alternatives to monolithic Relational databases and query facilities in the form of SQL, XML and network-based database technologies. Popularization of HTML and IP-based interface environments (.NET,.ASP, etc.) New software designs that permit users to easily tailor the baseline system functionality to fit their job requirements and culture. Universal Internet access New Commercial Nuclear CM and MRO applications utilizing PLM and IDE Modeling technologies are under development. Internally-developed systems are far easier to develop and maintain, but the requirement for the utility or plant to understand Nuclear Business, MRO and Configuration Management is unchanged.

8 CMBG 2009 New Industry Profile for Configuration Management and Asset Management in 2009 Today, the Nuclear Power Industry understands the goals and requirements for effective CM better than ever. Configuration Management is now better recognized as a key element in overall NPP safety and viability. The lessons of neglecting Configuration Management are now well- known, including plant operating incidents, poor INPO performance, forced plant shutdowns and expensive Design Basis Reconstitution projects. The role of CM in collateral benefits of plant safety, financial performance, regulator confidence, personnel management and knowledge base, and general efficiency are better appreciated than in years past. Recognition of a strategic direction for plant operating management and lifecycle control is appearing in operating plants, and for planning and construction of new builds. Past NPP IT solutions have provided experience useful in evaluating new technology and solutions available today.

9 CMBG 2009 IT Solutions that support Nuclear Business Models Nuclear Operations, Engineering and Maintenance require IT solutions that perform the following: Track and manage the business processes to operate the NPP, such as Maintenance, Engineering, Parts and Warehouse, Operations and Purchasing/Procurement. Manage the processes for design basis and basic NPP configuration, such as Master Equipment List, Document Review and Control, and Engineering Design Changes and Procurement Engineering. Provide for Requirements Management, to support Licensing, Engineering, Maintenance and Action Tracking requirements. Provide and support an infrastructure to coordinate, collaborate and communicate plant events and changes instantly to all concerned organizations. Support “3-D” Computer Aided Design (CAD) for utilization in engineering, plant modeling, component identification, and to support paperless design. Provide a means to support long-term analysis of plant and component asset condition and performance over life, providing both Repair/Replace/RTF maintenance support and plant life extension. Furnish the means to identify, collect and provide access to critical plant implicit and explicit knowledge to be captured as staff and vendors turn over.

10 CMBG 2009 Technology Comparison: PLM vs. legacy Repository-based Traditional “Repository”-based System Architecture Primarily COLLECTS Data for later Retrieval, Analysis, Reporting or Archive. “Plant Lifecycle Management (PLM)”-based System Architecture Primarily MOVES Data and Events for immediate application to CM-, Knowledge- or Asset-based tasks You must know what you need to retrieve information You must know that you need to retrieve it NOW. Appropriate information is delivered to you when you need it.

11 CMBG 2009 New factors in the “Buy/Build” Decision Tree Approaches Develop and program the NPP Nuclear IT solution 100% in-house, to be deployed on the selected target architecture. Purchase and deploy a turnkey IT MRO solution, which may include an integrated ERP host architecture migration (such as SAP or Oracle-based products). Design and deploy a hybrid solution of in-house and commercial IT elements.

12 CMBG 2009 Sample Development of PLM-based Nuclear Power Technology Solution Preparation Goal is: development of a Nuclear Power Generation enterprise technology solution for NPP configuration management, asset management, and possibly design and construction systems. Establish a comprehensive nuclear power generation Configuration Management, Asset Management and functionality model to support system review/development. Use PLM for a type of “Instant Messaging” Configuration Management – notifies all affected system users of change in process or plant configuration the instant it occurs. With 3-D Modeling technology, the solution should support the creation of a closed, integrated CAD-to-Control Room system for end-to-end design control, as well as 3-D plant model to facilitate design changes and identify components. The NPP should explore all alternatives, including new technologies and solutions as legacy nuclear business technology solutions currently on the market, combined with CM-based processes and configuration control features needed to implement a Nuclear Configuration Management solution. Selected solution should match NPP IT Target Architecture to avoid undue burden on infrastructure and existing systems.

13 CMBG 2009 Sample Development of PLM-based Nuclear Power Technology Solution Architecture and Design Features Reduce complexity, interface and ergonomic issues traditionally associated with cumbersome legacy, manual or rogue IT systems at NPP’s by following the legacy and data development model (later in presentation). Look for advanced, 4 th /5 th generation software architecture and technology, preferably utilizing a discrete process modeling environment (IDE), to capture business rules and transaction processing with little or no software programming. Then, nuclear business functionality stays persistent through systems software updates, versions and changes. System should accommodate an integrated ERP hub interface; this may be for SAP, Oracle or custom utility-based system (which most are). A self-documenting design platform is preferred; there should be little or no need for SDK’s and screen forms generators. Today’s IT organizations want to rely far less, if at all, on outside software development and consulting. Users will be attracted to an interface that utilizes XML/HTML and offers a “web page” look-and-feel. The product should be as modular as possible, along NPP functional lines, to facilitate deployment timeliness or phased implementation.

14 CMBG 2009 Sample Development of PLM-based Nuclear Power Technology Solution PLM replaces often ambiguous MRO system links and interfaces with a single point of contact for Configuration Management and Design Control.

15 CMBG 2009 Integration of Legacy Data Management and Outboard Applications Data is created, reviewed and approved over a prescribed content review lifecycle that ensures the Configuration Management Integrity of the content. The process may be divided into three “tiers” or levels, from the creation of the data or document, through the review and approval of content and subsequent delivery to the enterprise CM/MRO system.

16 CMBG 2009 Integration of Legacy Data Management and Outboard Applications Systems Integration Data should be integrated and managed based on a CAD-to-Field architecture. Legacy data, such as engineering databases, CAD data, preliminary design and EPC data (for new builds or design changes) should follow a path similar to that shown below. This creates a lifecycle from creation to quality records where the development of the document/data is traceable and has value as a CM tool. Systems integration not only addresses core plant business functions (vertical integration), but those NPP business areas that supply data, documents and other objects to the CM system (horizontal or flat integration). The design engineering area demonstrates a particularly strong impact from CADD sources, raw design data repositories, data and specification sheets, and niche data sources from industry and trade groups, which produce basic NPP documents and quality records. The data repository and post-CAD data are of particular interest to design and construction organizations, which follow a cohesive data- and document-creation and distribution taxonomy that cannot be effectively followed without a PLM-type facility.

17 CMBG 2009 Questions?