1 Implementing ISO and iRING at Bechtel The Power of Collaboration Digital Plant 2010 Houston March 1-3, 2010 Robin Benjamins
Our Information Landscape Owner Operator Suppliers JV Partners Corporate Systems Project Commercial Systems Engineering & Construction Systems Cost Data Quantity Data Legend Schema Configuration Static Requirements (Institutionalized) Dynamic Requirements (Customer Driven)
Information Model (ISO 15926) Application Mapping Always Changing Always Extending Always Compatible Public Proprietary Systems & Infrastructure Technology COTS Proprietary Open Source Automation Investment
ISO “Lingua Franca” XMpLantAEXEDI Bechtel Internet CIS/2 / IFCISO ConstructionContractsProject ControlsStartup Bank Steel Fabricator Equipment Manufacture Heater Manufacture JV EPC ProcurementEngineering Standards Strategy
Information Ambiguity Ambiguity Scale Least Ambiguity Greatest Ambiguity Greatest Least ISO Comma Delimited File iRING 2.0 Implementation XMpLant Schema Implementation Compliance Data exchanges operate most successfully when ambiguity is eliminated Ambiguity between exchanging partners can require significant effort (labor) to remove The higher the ambiguity, the higher the cost to implement effective and efficient data exchanges Ambiguity = Cost iRING 1.0 Implementation Knowledge Information Data
Robin Benjamins Bechtel FIATECH Technology Conference and Showcase Las Vegas, April 6-8, 2009
Camelot Project To build and deploy an ISO 15926, open source infrastructure on the internet and to show the following capabilities: The use of ISO in modeling business information The setup, configuration, and use of publicly available tools to map legacy systems to ISO The demonstration of several data exchange scenarios between several companies using ISO over the internet
Camelot Participants Camelot was an industry collaboration project ( POSC Caesar/FIATECH, IDS-ADI) Companies that participated in Camelot: Bechtel Bentley Chevron Consolidated Contractors Company (CCC) DNV Dow DuPont Emerson Process Management Fluor Hatch Intergraph NRX Global Tata Consultancy Services (TCS) Zachry
Demonstration Landscape ISO Information Model RDS/WIP Hatch Bechtel Intergraph Emerson Dow DuPontCCC PlantSpace P&ID OpenPlant PowerPID C3D Excel SmartPlant Foundation SmartPlant P&ID OpenPlant PowerPID P&ID Valve, Line, In- line Instrument, and Vessel iRING Web Service iRING Web Service Internet Brisbane Frederick Athens Pune Huntsville Houston Wilmington Oslo TCS RDS/WIP Editor NRXBentley RDS/WIP System OpenPlant Class Editor
Ad-hoc Update Reques t Reporting Architecture Interoperability Service (ISO 15926) Reportin g Database PSN Portal JV Partner Bechtel PSN Portal Web Service SSRS SSAS SS.. Secured Access Control BizTalk or other ISO Adapter Application (typ) RDS/WIP Secured Access Control Ad-hoc Update Reques t
Implementing ISO at Emerson Collaboration is Essential Duane Toavs Digital Plant 2010 Houston, March 1-3,
[File Name or Event] Emerson Confidential 27-Jun-01, Slide 12 Standard Dilemma
[File Name or Event] Emerson Confidential 27-Jun-01, Slide 13 Interoperability is the Objective End User Project Deliverables EPC Sub Contractor EPC Main Contractor Device Manager Fisher RMTPSS Emerson Robin was right!
[File Name or Event] Emerson Confidential 27-Jun-01, Slide 14 Adapter – Excel Rosemount Adapter – Excel Fisher ASE DeltaV Adapter – XML AMS Interface Implementing ISO is the Solution InternalExternal Client App Legacy Database Interface Service Adapter Service InBox iRING - Adapter iRing Reference Browser Emerson Database Emerson Project Gateway Interface Service Adapter Service InBox iRING - Adapter ISO RDF Vocabulary – RDF Data Dictionary – ISO Part2,4,7 Data Model Interface Service iRING - Adapter Reference Database Adapter
Interoperability Strategy 15