EGEE is a project funded by the European Union under contract IST-2003-508833 The EGEE Project Fabrizio Gagliardi Project Director NA3 Induction Course,

Slides:



Advertisements
Similar presentations
Conference xxx - August 2003 Fabrizio Gagliardi EDG Project Leader and EGEE designated Project Director Position paper Delivery of industrial-strength.
Advertisements

INFSO-RI Enabling Grids for E-sciencE The EGEE project Fabrizio Gagliardi Project Director EGEE CERN, Switzerland Research Infrastructures.
An overview of the EGEE project Bob Jones EGEE Technical Director DTI International Technology Service-GlobalWatch Mission CERN – June 2004.
LCSC October The EGEE project: building a grid infrastructure for Europe Bob Jones EGEE Technical Director 4 th Annual Workshop on Linux.
EGEE is proposed as a project funded by the European Union under contract IST The EGEE International Grid Infrastructure and the Digital Divide.
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 15 th April 2009 Visit of Spanish Royal Academy.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
EGEE is a project funded by the European Union under contract INFSO-RI NA1 F. Gagliardi EGEE Project Director All Activity Meeting, 13 th September.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
EGEE (EU IST project) – Networking Activities 4: biomedical applications NA4 Biomedical Activities Johan Montagnat First EGEE Meeting Cork,
INFSO-RI Enabling Grids for E-sciencE Status of the Project Fabrizio Gagliardi, Project Director, CERN EGEE 1 st EU Review 9-11/02/2005.
EGI: A European Distributed Computing Infrastructure Steven Newhouse Interim EGI.eu Director.
GRACE Project IST EGAAP meeting – Den Haag, 25/11/2004 Giuseppe Sisto – Telecom Italia Lab.
AARC Overview Licia Florio, David Groep 21 Jan 2015 presented by David Groep, Nikhef.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
CHAIN Project Preliminary Name & Ideas (and Issues) Federico Ruggieri – INFN Meeting of 3 April CERN.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
EGEE is proposed as a project funded by the European Union under contract IST EU eInfrastructure project initiatives FP6-EGEE Fabrizio Gagliardi.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE – paving the way for a sustainable infrastructure.
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
Fabrizio Gagliardi EGEE designated project director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST Middleware Planning for LCG/EGEE Bob Jones EGEE Technical Director e-Science.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
INFSO-RI Enabling Grids for E-sciencE External Projects Integration Summary – Trigger for Open Discussion Fotis Karayannis, Joanne.
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
Induction: Adding new applications to EGEE infrastructure –April 26-28, Adding new applications to EGEE infrastructure Roberto Barbera EGEE is.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Presentation of templates and supporting documents Anna Cook EGEE-II / EGEE II Transition.
EGEE is a project funded by the European Union under contract IST NA1 & NA5 Fabrizio Gagliardi Project Director AA Meeting, CERN, 18th June.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE All Activity Meeting – 17 March NA2 Dissemination & Outreach EGEE is proposed as a project funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
INFSO-RI Enabling Grids for E-sciencE Status of the Project Fabrizio Gagliardi, Project Director, CERN EGEE 1 st EU Review 9-11/02/2005.
Status Organization Overview of Program of Work Education, Training It’s the People who make it happen & make it Work.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
EGEE is a project funded by the European Union under contract IST Generic Applications in EGEE-NA4 Roberto Barbera NA4 Generic Applications.
INFSO-RI Enabling Grids for E-sciencE Policy and International cooperation Fotis Karayannis, NA5 activity leader All Activity Meeting.
INFSO-RI Enabling Grids for E-sciencE Plans for the EGEE-2 EGEE 2 Task Force 3rd EGEE Conference, Athens, April 2005.
Guy Wormser IN2P3/CNRS, EGEE Applications Manager September 2003 EGEE is proposed as a project funded by the European Union under contract IST
CERN The GridSTART EU accompany measure Fabrizio Gagliardi CERN
INFSO-RI Enabling Grids for E-sciencE The EGEE Project Owen Appleton EGEE Dissemination Officer CERN, Switzerland Danish Grid Forum.
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
Fabrizio Gagliardi EGEE project director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract.
EGEE is a project funded by the European Union under contract IST ARDA Project Status Massimo Lamanna ARDA Project Leader NA4/HEP Cork, 19.
Conference xxx - August 2003 EGEE is proposed as a project funded by the European Union under contract IST Fabrizio Gagliardi EGEE designated.
18-May-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the LCG Security Group) Barcelona 18 May 2004 David Kelsey CCLRC/RAL, UK
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
INFSO-RI Enabling Grids for E-sciencE An introduction to EGEE Mike Mineter NeSC Edinburgh
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Technical Overview EGEE-II’s achievements.
Induction: What is EGEE? –April 26-28, EGEE organisation and procedures John Murison, EGEE Training Team EGEE is funded by the European Union.
EGEE-II INFSO-RI Enabling Grids for E-sciencE Training in EGEE-II Mike Mineter (Some slides from Brendan Hamill)
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
INFSO-RI Enabling Grids for E-sciencE EGEE general project update Fotis Karayannis EGEE South East Europe Project Management Board.
INFSO-RI Enabling Grids for E-sciencE Status of the Project Bob Jones, Project Director, CERN EGEE 2 nd EU review 6-7/12/2005.
INFSO-RI Enabling Grids for E-sciencE EGEE-II project proposal overview By Bob Jones EGEE Technical Director CERN.
Bob Jones EGEE Technical Director
EGEE Middleware Activities Overview
JRA3 Introduction Åke Edlund EGEE Security Head
SA1 Execution Plan Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
Long-term Grid Sustainability
EGEE support for HEP and other applications
Preparing for EGEE-III
Collaboration Board Meeting
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

EGEE is a project funded by the European Union under contract IST The EGEE Project Fabrizio Gagliardi Project Director NA3 Induction Course, 17 th May

NA3 Induction Course, 17 th May Contents Why EGEE? The EGEE challenges CERN’s role in the Grid LCG: LHC Computing Grid EGEE partners EGEE applications Pilot applications Related Projects EGEE project structure EGEE Management Structure The Project Office Timesheets: what and why Project Office issues

NA3 Induction Course, 17 th May Why EGEE? A lot of investment from previous projects both at national and international level For once Europe is not lagging behind (yet) more advanced IT regions (US and Japan)  NYT article on 11/11/03 gives EU a lead to Europe on Grid deployment Important to keep momentum and preserve the human asset and resource investment so far O(100 MEuros) in FP5 100 M Euros already invested in first FP6 phase, another 160 M foreseen in second phase More investment possible in FP7 (if success in FP6 continues) Project Director and senior partners already working on this

NA3 Induction Course, 17 th May The EGEE challenges (I) A large investment in a short time (32 M Euros/ 24 months):  The rationale is to mobilize the wider Grid community in Europe and elsewhere and be all inclusive  Demonstrate production quality sustained Grid services for a few relevant scientific communities (at least HEP and Bio-Medical)  Demonstrate a viable general process to bring other scientific communities on board  Propose a second phase in mid 2005 to take over EGEE in early 2006 Move from R&D Middleware and testbeds to industrial quality software and sustained production Grid infrastructure performance Implement a highly distributed software engineering process while maintaining efficiency and a fast release cycle (development clusters) Harmonize EGEE activities with national and international activities Cope with new FP6 rules and different and often conflicting EU Grid plans and activities

NA3 Induction Course, 17 th May The EGEE challenges (II) On a more technical ground:  How to keep the present GT2 based production middleware running on the production infrastructure, while developing a “simple” prototype from different and disparate building blocks?  Are the above two processes going to converge in the short time of the project life?  Where is the overall architecture developed? Is everybody convinced we need one (a part from his/her own?)  Do we have a process in place to integrate new VOs in SA1?  How to support effectively new VOs other than HEP in NA4?

NA3 Induction Course, 17 th May CERN’s role in the EGEE LHC poses unprecedented computing challenges LCG project and Grid technologies are CERN responses Also for this reason CERN is the lead partner for the EGEE project which will provide a grid infrastructure for several application domains

NA3 Induction Course, 17 th May LHC Computing Grid Project (LCG) EGEE builds on the work of LCG to establish a grid operations service LCG: a worldwide collaboration of  The LHC experiments  The Regional Computing Centres  Physics institutes Mission:  Prepare and deploy the computing environment that will be used by the experiments to analyse the LHC data Strategy:  Integrate with EGEE in SA1 (Grid services) and JRA1 (Middleware)  Coordinated management structure Status:  LCG service up and running with LCG-2 mware – successfully being used for LHC data challenges

NA3 Induction Course, 17 th May EGEE Partners 70 leading institutions in 28 countries, federated in regional Grids Leverage national resources in a more effective way for broader European benefit

NA3 Induction Course, 17 th May From the EGEE proposal: Applications EGEE Scope : ALL-Inclusive for academic applications (open to industrial and socio-economic world as well) The major success criterion of EGEE: how many satisfied users from how many different domains ? 5000 users (3000 after year 2) from at least 5 disciplines Two pilot applications selected to guide the implementation and certify the performance and functionality of the evolving infrastructure: Physics & Bioinformatics

NA3 Induction Course, 17 th May The pilot applications  High Energy Physics with LHC Computing Grid ( relies on a Grid infrastructure to store and analyse Petabytes (10 15 bytes) of real and simulated data. LCG is a major source of resources, requirements and hard deadlines with no conventional solution available  In Biomedics several communities are facing equally daunting challenges to cope with the flood of bioinformatics and healthcare data. Need to access large and distributed non-homogeneous data and important on-demand computing requirements

NA3 Induction Course, 17 th May From the EGEE mandate, be open and play an infrastructure role:  SEE-GRID, South Eastern European Grid-enabled eInfrastructure development: extends EGEE to South East Europe  DEISA, Distributed European Infrastructure for Supercomputing Applications: Supercomputing grid  Diligent: A Testbed Digital Library Infrastructure on Grid Enabled Technology: (in advanced negotiation) starts in September or October 2004  GRID-CC (in advanced negotiation): Real-time Grid applications  US projects (Trillium, GRID3, OSG etc.)  BioMedical and other EU projects from the current round of EU negotiation (will be known by June)  Other countries have expressed strong interest in the project: Korea, Taiwan, Egypt, Pakistan, India, Cuba, Chile, Iran… EGEE Related projects

NA3 Induction Course, 17 th May EGEE Project Structure JRA1: Middleware Engineering and Integration JRA2: Quality Assurance JRA3: Security JRA4: Network Services Development SA1: Grid Operations, Support and Management SA2: Network Resource Provision NA1: Management NA2: Dissemination and Outreach NA3: User Training and Education NA4: Application Identification and Support NA5: Policy and International Cooperation 24% Joint Research28% Networking 48% Services Emphasis in EGEE is on operating a production grid and supporting the end- users 32 Million Euros EU funding over 2 years starting 1 st April 2004

NA3 Induction Course, 17 th May Management structure assists advises reports to CBCollaboration Board EACExternal Advisory Committee EUEuropean Union PDProject Director PEBProject Executive Board PMBProject management Board POProject Office AFM Administrative Federation Meeting PMB PD PEB EU PO EAC CB recommends to interacts with Activities (NA1-5, SA1-2, JRA1-4) report to AFM assists

NA3 Induction Course, 17 th May The EGEE Project Office The PO provides support to the Project Director and coordinates information with all 70 partners Project Director: Fabrizio Gagliardi Project Technical Director: Bob Jones

NA3 Induction Course, 17 th May Project Requirements The Project Director (Fab) is the pivotal figure interacting with the partners on the one hand, and with the EU on the other The Technical Director (Bob), coordinates all technical activities and is deputy to the Project Director The project follows the FP6 rules set by the EU and therefore a set of specific deliverables and requirements are imposed The PO is there to communicate and request the various administrative matters from partners to ensure that the EU’s requirements are met Let’s meet the team…

NA3 Induction Course, 17 th May The Project Office - 1 Project Administrators: Kristina Gunne Karin Burghauser Pierrette Colaci Karin (60%), Kristina and Pierrette (50%, she leaves on June 30, 2004) assist the Project Director in his numerous managerial and administrative tasks, and provide support for all administrative issues. They are multi-tasking experts!

NA3 Induction Course, 17 th May The Project Office - 2 Project Secretary: Anna Cook Anna deals with general project administration (contracts, reporting, meetings, etc.) and she manages the Project Office staff Financial Officer: Severine Bergerot Severine is the main contact for all financial matters, cost claims, timesheets, etc.

NA3 Induction Course, 17 th May The Project Office - 3  Project Office PR and link to dissemination and outreach activities (NA2): Leticia Martignon Marc-Elian Begin Support the Project Director in relations to dissemination activity, press and media, serve as a link between the project office and the outside world Liaise with Terena (NA2) for production and distribution of information material for various EGEE, Grid and specific public relations events Co-ordinate demonstrations of EGEE at various events Identify news about the project and disseminate it to the wider community Maintain the internal project web site (with temporary support by Marie Laure) Rosy Mondardini (60%)

NA3 Induction Course, 17 th May The Project Office - 4  EGEE related project section (RP). Part of NA5 activity. Relations to Grace, Diligent, SEE-GRID and exploratory role in other potential partner projects. Roberta Faggian, SL, Juergen Hofer, technical student (Grace), leaving soon, a new TS, Jan Fiete Grosse- Oetringshaus, is being hired; 2 FTEs for Diligent, and 1 FTE for SEE-GRID and eIRG support.

NA3 Induction Course, 17 th May The Project Office - 5  Web Assistant: Marie-Laure Bourgeois-Schutz Marie Laure assists Leticia in the internal web site maintenance and, with Karin, is responsible for registering external EGEE partners at CERN Her contract ends on September 30, 2004

NA3 Induction Course, 17 th May And finally, timesheets What and why Among the various requirements for the project to unfold seamlessly, timesheets have become the “hot topic” of the moment Each person participating in the project must provide a timesheet on a monthly basis. The timesheet must report the number of hours worked in which task of which activity This timesheet must be approved by the local management, and passed on to the designated “collector” in their institute, who will then submit them all to the project office for validation by the PEB The timesheets must satisfy the partner internal accounting and auditing rules and procedures A template has been provided and made available on the project website: An electronic tool is being developed at CERN to help the reporting process. Further information will be provided once it is in place

NA3 Induction Course, 17 th May Project Office issues  EGEE Project office does not scale from the previous EDG project office experience (except maybe on the dissemination and PR part)  Technical co-ordination under resourced (2 FTEs in EDG, only 1 in EGEE). Very critical issue.  Still in a start-up phase, with the exception of Bob, Karin and Rosy, everybody in the PO is new on board and without prior experience of EU, CERN and similar projects.  Open to suggestions, criticisms and ready to improve in any possible ways.  Counting on your patience and support while getting up to speed.

NA3 Induction Course, 17 th May The Project Office - Contacts The project office can be reached on the following address: And for all timesheet matters : For further information on the project: