3 CASE STUDIES - POTENTIALLY POLLUTING WRECKS SS JACOB LUCKENBACH SS PALO ALTO F/V MWAALIL SAAT.

Slides:



Advertisements
Similar presentations
2.3 Waste Management – Revised IBTS
Advertisements

Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
©2010 Global Diving & Salvage, Inc. S/S Princess Kathleen Fuel Removal Project February 12 to June 4, 2010 Point Lena Juneau, Alaska.
Nuclear Power Turkey Point Power Plant Process. Turkey Point Power Plant Built on 12, 700 acres in Homestead Opened in 1972 Cost to build both reactors.
Overview Many commercial operations generate high- strength wastewater. Fats, oil and grease (FOG) tend to clog leaching systems. Dairy products present.
CASE STUDY-III BOILER TUBE FAILURE. The Incident  Boiler Make: MIURA  Date: March 26, 2010  Place: At sea  Initial Indication: Frequent water being.
Cooling As working temperatures rise, the strength of metals used reduces. This in turn will force manufacturers to use superior metals/alloys, which can.
Futureview Solar Solutions Elysburg, Pa. Call
Reservoirs Covered in Ch. 5 of Vickers Text
Aquaponics Oregon Economical Aquaponics producing Natural Organic Vegetables, Herbs, Plants Without the use of commercial fertilizers. The 40 gallon system.
THRUSTMASTER HOUSTON, TX Largest Thruster Factory In the World
Office of Marine Safety Stability and Flooding Eric Stolzenberg.
1 Math Questions. 2 Length x Width x Water Depth = cubic feet.
Sabine Block 13: Oil Remediation. SS. W. BEAUMONT BACKGROUND – INTIAL INDICATION  OIL SHEEN OBSERVED BY HELICOPTER  PIPELINE WAS INITIAL PROBABLE CAUSE.
Given: Reser Stadium A fire hose Find: The time required to fill Reser Stadium with a fire hose (assuming no leaking or seeping during the process)
Calculating board Feet linear feet
Volume Quiz.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Updated: 2/12/2012.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Hydronic Mechanical Controls
Sea Water Scrubber. INTRODUCTION Crystallox has developed a new generation of horizontal and vertical scrubbers for marine and land based applications.
Wrecks of the World II Wreck Remediation and Pollution Recovery – Case Studies Zach Malinoski.
Dewatering Equipment.
Designing for a Sustainable WORLD Cost and Efficiency Trade-offs in Solar Water Heater Design.
NFPA 31 Standard for the installation of Oil- Burning Equipment
Investigator Casualty Guide Identifying & Assessing Damage “Looking Deeper” March 2013.
Drain systems PAB Drain Systems Drain systems are important to allow equipment to be drained, opened, inspected and repaired If else, process fluids.
Changing Dimensions: Surface Area and Volume. Recall that similar figures have proportional side lengths. The surface areas of similar three-dimensional.
Submerged PC Cooling By: Patrick Hague Geoffrey Clark Christopher Fitzgerald Group 11.
Barge MM53 Field Surveys & Report 29 January 2006 Steve Lehmann, SSC Renn Hanson, Situation Unit.
Current Issues Project For Quarter 1 By: Alexis Davis Period 4 and 5.
Setting up a Saltwater Aquarium Water weighs 10 pounds per gallon Place tank on a level surface that can support the weight Do not use soap to clean tank.
Mindo is 80 km northwest of Quito, Ecuador Altitude: 3,600 to 5,250 ft Subtropical cloud-forest Temperature between 60°F (16°C) and 79°F (26°C) 430 bird.
Equations with the Variable on Both Sides
Automotive Heating and Air Conditioning CHAPTER Automotive Heating and Air Conditioning, 7e James D. Halderman | Tom Birch SEVENTH EDITION Copyright ©
STABILITY AND TRIM CALCULATIONS Rolling Period.
DIESEL FUEL FILL 1.Secure Fireboat 2 to fueling dock, fueling vessel, or vessel to receive fuel (Fig ). 2.Develop communications as needed, including.
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
Energy Resources. Energy resources: coal, petroleum, and natural gas Considered fossil fuel because derived from remains of plants and/or animals Composed.
Volume and Surface Area Review. How much cardboard would you need to make a shipping carton with dimensions 10 inches by 8 inches by 20 inches?
Warm Up Turn your homework into the box BEFORE the 7:15 bell! We will start the quiz immediately.
Machinery Cooling Water System Locations and Operations.
Coolant Fill Coolant Check and Fill. Oil Fill & Dip Stick Main Engine Oil Fill Dip Stick Delo 400 – 40 wt. Engine Oil.
Engine Speed Amps Engine Temp. Engine Oil Pr. Trans. Fluid Pr. Battery overheat Engine overheat Exhaust hose overheatExhaust overheat Low oil pressure.
Estimating Concrete Construction and Material Cost
Shore Power Connection Check the connection on the boat Check the breaker on the dock ON OFF.
SATMathVideos.Net Water is pumped into an tank at 20 gallons per minute. The tank has a length of 10 feet and a width of 5 feet. If the tank starts empty,
Mike Deery Managing Director Bridge Biotechnology.
Calculating Storm Water Runoff Pervious vs. Impervious Materials.
The Cooling System (Reasons for)
AfterSalesTraining Welcome to AfterSalesTraining.
Sector San Francisco USCG Sector San Francisco State ACM – 18 January 2012.
Chapter 16 Landfill Liners and Geosynthetics
Smarter Balance Assessment Great Coffee Cup.
Temperature Test Allows monitoring of temperature changes.
Automotive Heating And Air Conditioning
Chapter 16 Thermal Energy and Heat
Eps: Campus rainworks challenge
Fluid Statics/Dynamics
Thermodynamics Units and Properties.
Electrical Gas Plumbing Heating & Cooling
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
ITEMS TO CHECK ON Running Pumps
Flow to Wells – 3 Unsteady Flow to a Well in a Confined Aquifer
Chapter 16. Temperature and Expansion
Setting up a Saltwater Tank
Get your calculators and your formula sheet!
NAVSEA 05L4 Damage Control USS COLE DDG67.
Presentation transcript:

3 CASE STUDIES - POTENTIALLY POLLUTING WRECKS SS JACOB LUCKENBACH SS PALO ALTO F/V MWAALIL SAAT

SS JACOB LUCKENBACH BUILT ’ x 69.6’ x 29.5’ SUNK IN 1953 in 175 FT OF WATER GULF OF THE FARALLONES NATIONAL MARINE SANCTUARY WATER TEMPERATURE 45-50° F vs POUR POINT 59° F OIL SPECIFIC GRAVITY – 1.023

GFNMS WRECKSITE

RESULT OF THE ASSEMENT PHASE COMPUTER GENERATED MODEL OF THE SS JACOB LUCKENBACH ON THE SEA BED

OIL IN AFT TANKS AND HOLD 5 SHAFT ALLEY

OIL IN 5A DEEP TANKS

SUMMARY OF CALCULATIONS OF RESIDUAL OIL Wedge Tank/Space Length Volume Estimate Tank/SpaceArea (Sq-Ft)(Frames)(Feet)Cu-FtGalsNote UPPER TWEEN DK – PORT HOLD 5 – PORT DEEP TANK 5 – PORT DEEP TANK 5A – PORT HECSALV ,471 DB TANK 6 – PORT DB TANK 6 – STBD DEEP TANK 5 – STBD DEEP TANK 5A - STBD HECSALV ,833

LEAKING VENTS DETERIORATION IN BULKHEAD MIGRATION OF OIL FROM LEAKING TANK VENTS ON PORT SIDE NO 4 HOLD NO. 5 HOLD NO 4 LOWER TWEEN NO 5 UPPER TWEEN DP TK 5 P DP TK 5A P OIL

Open Vent – ROV ObservationDischarge from Pump to 5A Pump Location Oil “Wedges” Trapped Between Frames Pump Hose Frame 155 Window - Complete 8/5/02 Frame 161 Window - Cleared Frame 171 Window - Cleared Proposed Access for Tween Deck Overhead Oil DT 5A (P) HOLD 4 UPPER TWEEN FRAME 149 FRAME 171 DT 5 (P) LOOSE OIL COLLECTION

HOT TAP & PUMP ARRANGEMENT

THE OIL’S VIEW OF STEAM INJECTION LANCE

STEAM CONVECTION HEATER FITS THROUGH 6 INCH HOT TAP OPENING

SS JACOB LUCKENBACH 85,000 GALLONS RECOVERED 10 MONTHS $19M

SS PALO ALTO BUILT 1919 OF REINFORCED CONCRETE 434’ x 54’ x 36’ AMUSEMENT ATTRACTION 505 GALLONS WASTE OIL RECOVERED $1.8M

Mwaalil Saat 93’ LONG LINER 2004 SANK DURING TYPHOON TINGTING 2005 DE-FUELED, CUT-UP & REMOVED 200 GALLONS WASTE OIL REMOVED $3.5M