Norco Tank T/A Meeting  Review current contracting strategy & options for improved strategy  Review details of 2008 & projections for 2009 forward.

Slides:



Advertisements
Similar presentations
ODOT BULK FUEL MAINTENANCE PLAN WHAT TO EXPECT THE DAY THE VENDOR TAKES A SAMPLE.
Advertisements

Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Lesson 31 Main Engine Repair (II).  1. Crankpin bearing overhaul  2. Fuel pump removal & re-installation  3. Cylinder head removal/replacement  4.
Big Pond Tank Mobile, Reusable Construction/Frac-Water Storage.
Above Ground Storage Tanks &
I E Industrial Equipment Servicing the North State Environmental Cleaning Systems Site Design Comparisons Site Design Comparisons (System Pretreatment)
Step #1 Wash hands using proper hand washing technique Note: please see “Hand Washing” Power Point for more details Cafeteria: Canned Fruit Prep.
Job Performance Requirement 7-13 Servicing an SCBA Cylinder Using a Cascade System.
Ross By-Pass Tunnel Cleanup Pre-Bid Project Overview May 2014
ClearWater Tech LLC EcoTex - Advanced Laundry Oxidation Systems Ozone Laundry Methodology.
What should be checked?  When driving long distance?  During a regular vehicle inspection?  How often should oil changes be done?
1 Oil Fuel Line De-aerators What they are, what they do and how to install.
BEST PRACTICES 2014 BEST PRACTICES About P2S Established in 1985 as SERV-TECH a specialty contractor. Purchased by Phillip Service Corporation.
A world leader of innovative bathroom products Maximize style. Maximize Savings. Save the Environment Installing the Replacement Seal on the Sydney Tank.
Complete Cryogenic Services, Inc.
"AIR COOLER" Heat Exchanger
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
ROBOTICS IS THE WAVE OF THE FUTURE……. ARES Robotics has a perfect safety record with zero injuries and recordable incidents. Ares is the leader in ROV.
ZF-100 The Paraffin & Asphaltene Solution. ZF-100 The Paraffin & Asphaltene Solution 72% Biodegradable, environmentally friendly ZF-100 is an aggressive.
Diesel Generator Reliability: Lessons Learned from Storms
Tank Consultants, Inc West 21st Street Tulsa, Oklahoma Telephone Fax
AIR COMPRESSORS & STEAM CLEANERS. Pressurized air is produced by an air compressor. Air compressors are used daily in automotive shops. They are used.
Mechanical for Oil Heat
WATER PIPING DESIGN FOR A RESIDENCE In the packet is a floor plan of a residence with water supply piping shown. Follow the process as a step by step.
1 Before and After The Appearance Program; enhances your company image contributes to your fleet vehicle safety communicates a professional advantage.
HCR Tank Cleaner Non-entry Recovery “Turning liabilities into profits”
DST H.O.M.E. Home Ownership Maintenance and Education Property Maintenance: Protect Your Property Value.
Griner Drilling Service
Floating Head Heat Exchanger
Bethesda Triangle Brian Groark Construction Management Faculty Consultant: Dr. Messner.
Receiving Inspection This is the inspection of the engine as it is removed from the aircraft and received at the overhaul site The purpose of the.
Burle Leak Check 3/19/2012 Jeff Williams Jun Xie.
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
“Fix Tube Sheet” Heat Exchanger
© 2012 MISTRAS GROUP, INC. ALL RIGHTS RESERVED. DISSEMINATION, UNAUTHORIZED USE AND/OR DUPLICATION NOT PERMITTED. TankReporter 2.0 A Step by Step Example.
Spill and Overfill Prevention Alaska Spring 2004.
1 7. R EPETITIVE C ONSTRUCTION Objective: To understand how production and production rates are affected by repetition of tasks, and to learn how to plan.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Safe Operation of Storage Tanks: Decommissioning and Repair
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
TRENTON Casing Filler Presentation
Significant Potential Incident Unauthorized Weld on Pressurized Water Line Timmins, Ontario, Canada October 17, 2011.
Safety Talk 3 / 1 Safety Talk 3 Safe Operation of Storage Tanks: Temperature and Pressure.
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
Monday – VSP Room weekly checks Visually Check: Hvac system for leaks & valve settings Fresh water system for leaks & valve settings VSP linkage Autopilot.
NEW TANK REPAIR PRODUCTS INSPECTION COATING Global AST Solutions Provider Since Personal Safety Awareness Initiative.
2006 BAYTOWN TURNAROUND Unit could not sustain full rates after Hurricane Rita Planned Turnaround for 3Q06, moved forward to 1Q06.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
Hot Work Permit Osan AB Fire Emergency Services.
MAINTENANCE INTERVAL SCHEDULE D6R TRACK TYPE TRACTOR 7AR EVERY 10 SERVICE HOURS OR DAILY.
Symbols and Room Finishes
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
A roof is an essential component of any building. It is the roof that protects the building from extreme climates such as rain, snowfall and wind. It.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
1 Second Layer of Poly At this point all poly EXCEPT critical barriers can be removed. Some specs require leaving the last layer of poly up until final.
Edward S. Kubinsky Jr. CROMPCO, LLC
West Melbourne Lease Requirements
14 Refrigerant Recovery, Recycling, and Recharging.
Hall A Target Status 9/27/16 Dave Meekins.
An-Najah National University
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Troubleshooting 11/14/2018 Water King Service Seminar.
Floating Head Heat Exchanger
TRENTON Casing Filler Presentation
NEW COMPLIANCE REGULATIONS
High Level Operations Transition Timeline
Change Order Request Contract S02013C01 SSWRF RAS System Improvements Restore ED’s Original Delegated Authority Approve Changes in TPC Commission.
Commission Agenda Item #2
Presentation transcript:

Norco Tank T/A Meeting  Review current contracting strategy & options for improved strategy  Review details of 2008 & projections for 2009 forward.

A-416 The tank was taken out of service in November The tank was stripped, blinded, and opened manways takes approximately 1 The tank was turned over to AbClean. The tank took approximately 3 ½ months to clean. Cleaned from manways for approximately 3 weeks and entered the tank on The cleaning was completed week.. The floor blast was scheduled to start , but was delayed due to cracks discover in weld seams in floor. This pushed the start date by to Once ICC entered the tank it was discovered the original millage of the floor liner was not accurate. The original millage shown 15mln and the actual millage was 45mln. This change the process of blasting the floor and added 3 weeks duration to the overall schedule. The blasting was completed The tank was turned over to HMT on (availability of manpower). The inspection was completed due to the availabiltiy of manpower supporting for both A-416, F-502, and chasing pinhole leaks in floor of A- 416.The current path forward is to helium testing pontoons and PEI is working on repair plan. Once the repair plan is completed, we will send it out for bid focusing on schedule.

A-414 The product in the tank is crude oil. The tank will have approx 7'' ( 3,176bbls ) of oil and sludge remaining after stripping. Tank has external floating roof and is believe to have a cone up floor. Roof leg will be set at 6ft. Tank is being clean due to floor having a leak in it. Motiva / Maintance will blind all necessary valves and flanges. Lock/out,Tag/out proecdure will be done by Motiva and inspected by an Abclean supervisor. The tank will then be turn over to Abclean for cleaning. First phase of the job will be to set up equipment. A 4x4 sludge pump will be use to suck oil and sludge out of tank doing cleaning. The sludge will be pumped to a 500bbl frac tanks on site and haul to the NORF for disposal. A second frac tank will be placed on site. This frac tank will be fill with LCO and use to wash non-pumpable sludge.This process will continue until all product is remove from tank. After the product is remove, two 5000psi heated pressure washer will be use to fine clean tank. Crew will pressure wash walls up to seal area, bottom side of roof, internal piping, and floor.Once tank is clean, Motiva inspector will inspect tank. After tank has passed inspection, all equipment will be decon on site and rig down. Site will be clean of all trash and disposed of. Time on site. 4-days mob/demob, 18- days remove product, 8-days to pressure wash. Straight Time: (4-10) Duration Jun-2 to Jul-22 – 50 days for $137, Overtime: (7-10) Duration Jun-2 to Jul-1 – 30days for $144,327.59