1 ATLAS Upgrade WP4 Face to Face meeting at Glasgow, 13/6/2011 Irradiation activities Richard French, Paul Hodgson –Sheffield Paul Dervan (TL), Gianluigi.

Slides:



Advertisements
Similar presentations
Proton and neutron radiation facilities in the PS East hall at CERN Maurice Glaser, Michael Moll, Federico Ravotti CERN.
Advertisements

Investigation of Proton Irradiation-Induced Creep of Ultrafine Grain Graphite Anne A. Campbell & Gary S. Was University of Michigan Research Supported.
Combined Measurement Results of dedicated RD50 Charge Multiplication Sensors Christopher Betancourt 2, Tom Barber 2, Gianluigi Casse 1, Paul Dervan 1,
JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
RaDIATE 1 st Annual Collaboration Meeting May Cost-effective Irradiations Discussion Radiation Damage In Accelerator Target Environments.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
T2K – Canada Accelerator & Detector Status D. Karlen University of Victoria & TRIUMF ACOT meeting, May 12, 2007.
Irradiation Workshop - KarlsruheA. Dierlamm, IEKP 1 Irradiation with Protons - IQC Karlsruhe IEKP - Universität Karlsruhe (TH)
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
1 Irradiation Study of n-on-P Strip Sensors K. Hara, K. Inoue, A. Mochizuki (Univ. of Tsukuba) Y. Unno, S. Terada, T. Kohriki, Y. Ikegami (KEK) K. Yamamura,
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Tracker Week April 2002IEKP 1 Irradiation of one CMS ceramic hybrid from Dorazil in Karlsruhe Frank Hartmann IEKP - Universität Karlsruhe (TH)
Irradiation Scanning System suitable for silicon & passive materials (with cooling) H Marin-Reyes R French P Hodgson K Parker P Dervan J A Wilson D. Parker.
The Birmingham Irradiation Facility Scanning System suitable for silicon & passive materials (with cooling) H Marin-Reyes R French P Hodgson P Dervan J.
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
WP8.3.3 Status of Cold Boxes & Irradiation of Si sensors Maurice Glaser Frederico Ravotti Michael Moll Graham Beck, Jag Mistry Gianluigi Casse, Paul Dervan.
WP8.3.2 Common infrastructure for facilities Sensor cooling at the Birmingham Irradiation Facility Maurice Glaser Frederico Ravotti Michael Moll Gianluigi.
X-Ray Reflection Data Analysis Update Information can be extracted from XRR data: - Film thickness - Roughness.
Birmingham Irradiations and Charge Collection Measurements Anthony Affolder, Paul Dervan The University of Liverpool, UK ATLAS12 Sensor Testing Meeting.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
Neutron Dose Per Fluence and Weighting Factors for Use at High Energy Accelerators (Submitted to Health Physics) J. Donald Cossairt, Ph.D., C.H.P. Kamran.
Stopped Muon/Pion Measurements Jim Miller, BU May 2012 UW Test Beam Meeting.
V.Grishin, A.Koshelev, A.Larionov A.Pushkarev, V.Seleznev, M.Sleptsov A.Sytin.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
S.Hou, Academia Sinica Taiwan. 2Outline Optical links for ATLAS Laser-driver  fiber  PIN-driver LHC modules in service Rad-hard requirement for LHC/SLHC.
Tim Bolton, KSU Run 2B L0/L1 PRR Aug 7, Radiation Testing at KSU for the Run 2B Upgrade  L0/L1/L2 sensors from both HPK and ELMA tested with 7-14.
1 QMUL Face to Face Meeting 2/2/2012 Richard French, Paul Kemp-Russell, Hector Marin-Reyes (Sheffield) John Matheson, Martin Gibson, Ian Wilmut (RAL) Ian.
Beam diagnostics in the beamlines
1 Activities in Wuhan TopMetal sensor & ALICE ITS upgade Xiangming Sun CCNU ALICE ITS Upgrade and O2 Asian Workshop 2014.
Stopped Muon/Pion Measurements Jim Miller, BU May 2012 UW Test Beam Meeting.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Si-detector macroscopic damage parameters during irradiation from measurements of dark current evolution of with fluence Craig Buttar, University of Sheffield.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Gain stability and the LYSO beam radiation monitor measurements
Why Accelerator Mass spectrometry (AMS) The determination of the concentration of a given radionuclide in a sample can be done in 2 ways: a) measure the.
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Introduction to Irradiation Facilities 1. Challenges at LHC and Why we need Irradiation Facilities (Mar CAPEANS) 2. PH Department Proton and Neutron Facilities.
Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
Charge Collection, Power, and Annealing Behaviour of Planar Silicon Detectors after Reactor Neutron, Pion and Proton Doses up to 1.6×10 16 n eq cm -2 A.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
Summary of Liverpool CC(V) Measurements A. Affolder, P. Allport, H. Brown, G. Casse, V. Chmill, D. Forshaw, T. Huse, I. Tsurin, M. Wormold University of.
WP4 Face to Face #6, Oxford 14 th July 2011 Welding summary Richard French – The University of Sheffield.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
If you have a transaction processing system, John Meisenbacher
Neutron production and iodide transmutation studies using intensive beam of Dubna Phasotron Mitja Majerle Nuclear Physics Institute of CAS Řež, Czech republic.
Radiation Damage Experience: SiPM & QIE Cards Proton Cyclotron - Mass General Hospital (& MIT Research Reactor) Larry Sulak with Sergey Los*, Jim Freeman*,
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Irradiations / Birmingham Status Paul Dervan, Tony Affolder and Sven Wonsak The University of Liverpool, UK Paul Dervan, Paul Hodgson, Kerry Parker, Matthew.
Study of the Radiation Damage of Hamamatsu Silicon Photo Multipliers Wander Baldini Istituto Nazionale di Fisica Nucleare and Universita’ degli Studi di.
1 ATLAS Upgrade WP4 Face to Face meeting Sheffield 25 th August 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
Liverpool March 09 Irradiation Meeting. Graham Beck (QMUL) 1 Dissipated Power: Sensor (at -10C, 200V bias, after protons/cm 2 ) ~ 1W (×3 for.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
IEAP – CTU Prague Measurement of neutron flux during irradiation in NPI Řež T. Slavíček, V. Linhart, S. Pospíšil Institute of Experimental and Applied.
3/15/2011Nigel Watson / NA62 Meeting. History Radial Ridge Cyclotron – since 2004 Scanditronix MC40 variable energy cyclotron maximum energies 40 MeV.
Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 General.
Matters arising RADWG - 3 July 2009
Sep th Hiroshima Xi’an Test-beam evaluation of newly developed n+-in-p planar pixel sensors aiming for use in high radiation environment.
Update on Annealing Studies for Severely Irradiated Silicon Detectors
ITK Strip Module Meeting; 12st October 2015
Preparation of activation experiments for ITER material characterization and data validation in the Deuterium–Tritium JET campaign T. Vasilopoulou &
Siara Fabbri University of Manchester
Group meeting, 2nd Sept, 2013; JAW
Blown up beam analysis 2015 Data collected during Blown Up beam test phase in June 2015.
X-Ray Reflection Data Analysis Update
Presentation transcript:

1 ATLAS Upgrade WP4 Face to Face meeting at Glasgow, 13/6/2011 Irradiation activities Richard French, Paul Hodgson –Sheffield Paul Dervan (TL), Gianluigi Casse – Liverpool Maurice Glaser - CERN Graham Beck et al - QMUL John Wilson, David Parker – Birmingham University

CERN PS Irrad Update June Schedule through to end of /6/ h00 T7 beam Off (Maurice) Cooling down T7 area. (Maurice) 14/6/ h30 All East area beam OFF (Maurice) 14/6/ h00 Start T7 Access (RadP) Taking out IRRAD7 setup (Paul Dervan, R. French, Maurice) = Carbon sample removal Taking out IRRAD6 setup (Adriaan Heering, Mauricer) Taking out IRRAD3 setup (Alexandre Rozanov, Patrick Breugnon, Maurice) CMS-ECAL installation on IRRAD3 (Alexander Singovski, Maurice ) 14/6/ h30-12h00 End of the access 14/6/ h00 Start setting the 3 x 3 cm2 protons beam 2 Period Start StopComment P /14/2011 8:00:00 AM6/22/2011 8:00:00 AM7 Days Low fluence CMS-ECAL on IRRAD3 P /31/2011 8:00:00 AM 6/14/2011 8:00:00 AM10 Days Low fluence ~ 2E13p/cm2/h P /1/2011 8:00:00 AM 9/13/2011 8:00:00 AM35 Days Low fluence ~ 2E13p/cm2/h P /13/2011 8:00:00 AM 10/18/2011 8:00:00 AM35 Days Low fluence ~ 2E13p/cm2/h P /13/2011 8:00:00 AM 10/31/2011 8:00:00 AM 13 Days Low fluence ~ 2E13p/cm2/h Not sure!

Hardware update Old K4 chiller system pump burnt out earlier in year. Unknown cause (age is likely). RF to arrange replacement as still needed. New super monster cooling system purchased and installed, currently will only provide-15c at the cold box so this is a problem. Will investigate on 14/6 as to cause. Factors that have altered significantly to consider are; Cooling fluid has been altered from our old spec to one provided by the chiller manufacturer; This is untested with radiation so could be a problem. Unknown pumping speed. Restrictions in the oil cooler used to radiate heat could slow the fluid – not enough heat taken out With chiller at 0C and no (hybrid) power, hybrid temps were 0C (+1). So this is a measure of the previous cooling system (including the 36W fan load) (GAB) Paul’s new software sends text for “no beam” alarm. Allows MG & PS to monitor beam more effectivley as ideally need someone FT to monitor Irrad work. PS spills, data (RH/Temp etc) are now plotted directly to excel file making overall dose much easier to calculate and tracing of data possible. PS control PC suffered from multiple crashes, now fixed (memory) so data not lost. 3 Check with Paul Dervan for up to date PS Irradiation information

Birmingham Cyclotron Update 4 Dry run at end April/May very smooth. Mechanical and system control hardware was severely delayed by SSC. Final part arrived on =2 months late. RF now adding liner encoder to Y axis to allow Quadrature signal output for control. PH now finishing programming of control software: Hardware is integrated PC/FPGA chassis with Digital and Analogue IO modules, using single network cable to send/receive data. Farraday cup is used to measure charge from beam (last in line) Ge Spectrometer used to measure foils for callibration. Beam tests on 31 st May brought additional difficulties. Hardware installed May 11 Control system working for our beam line Farraday cup Ge spectrometer

Beam profile testing. 5 At 26 MeV protons, the fluence we ideally want to run at is1 microA of protons. This is much higher than B’ham have used for damage studies in the past. 1 microA is 6x10 12 protons per second, and this will be over an area of 1 sq cm. Multiplying by exposure time, that becomes 2x10 16 per hour or 1.6x10 17 per sq cm after 8 hours. This is far higher than the current shielding can handle. 350mm 280mm 110mm 1cm² lost 1cm² just maintained 1cm² perfect profile BEAM DIRECTION Tests on Birmingham Cyclotron on 31 st May, David Parker, Mike Smith, Richard French and John Wilson. Grafchromic film exposure to beam JW- Foil activation was tried successfully – not the standard irradiation of Ni foils (a la CERN and Karlsruhe) but, following earlier investigations of Francesca Fiorini, a Bham Med Phys postgrad, using a Ti foil. The subsequent decay spectrum of was very clear: just two distinct, well separated peaks from annihilation (511keV) and the 1.157MeV scandium decay. This simple calibration looked very encouraging: increasing the activation of Ti foil by a factor two (produced roughly by doubling the exposure time in the beam) resulted in approximately twice the rate of s measured in the hyper- pure Ge detector.

Future requirements Not an exhaustive list Will need to seriously beef up shielding to control room and access corridor as running with 0.5uA is giving unacceptable personal radiation levels in these areas. Ideally we want 1uA beam current. Main source of radiation is Neutrons. This can only be done by adding new shielding. Polycarb granules stacked in 15kg bags works as good low cost shielding, depth and quantity is now being calculated v cost of concrete. Activation foils required for testing, currently tested with Ti but could do with performing on a spectrum of materials to enable calibration with work at CERN and adding to RADMON work. Dosimetry will need careful setting up and recording only once we are happy that we have accurate foil calibration. Sensor mountings etc still not fabricated as unsure of spec and users – need definative user list. Tasks to compete urgently. Quantitative measurement of the Grafchromic profiles at the three locations will allow calculation of beam divergence and scanning pathway. Although the activation of Ti foil worked very conveniently, this technique will not match our irradiation. Since the decays with a half-life of about 4.0hrs, the activation will be tend to saturate over a typical irradiation run of half a day (say 12 hrs). Activation of Ni foils (where the half-like of is 35.6hrs), the activation will not tend to plateau over our 12hr irradiation. = Irradiation with Ni foil which may be more matched to our work. Checked Al foil activation at CERN and no use for Cyclotron energy. Check that our observed rates agreed quantitatively with the beam current measured with the Faraday cup. PH to finish programming of control system when beam profile over cold box z defined. RF to finish linear encoder mounting to Y axis and then relay outputs to IO module for speed control. RF to bring RADMON’s back from CERN along with BPM and Pin Doides for dosimetery. 6