ATM and Branch Delivery Equipment Services/Maintenance Review Typical Project Overview February 2015.

Slides:



Advertisements
Similar presentations
Getting the most out of your contracts Gary Traynor 11 th July 2013 Performance Monitoring Contractor.
Advertisements

Budgeting Financial Resources Management. Resources vs. Expenditures Needs to be a continuous process Planning Prioritizing Documenting Constant evaluation.
Creating the Ultimate Online Customer-Service Experience Stefan Beeli, Vice President ESP Computer Services Choosing the proper level of Technology A look.
Top 10 Ways Of Reducing Your Data Center Infrastructure Operating Costs.
Y OUR PARTNER IN WASTE EXPENSE REDUCTION AND RECYCLING MANAGEMENT SERVICES Good for the environment and your bottom line!
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
An Intro to Professionalizing Procurement & Strategic Sourcing
The Engine Driving Business Management in Project Centric Environments MAGSOFT INTERNATIONAL LLC.
MyFloridaMarketPlace: Project Overview MyFloridaMarketPlace.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
1. Funding model for telecom services  FTE funding model  Blue Ribbon Committee on IT Excellence Horizontal wiring upgrades 2.
Office of Small and Disadvantaged Business Utilization (OSDBU) Linda Alexander-Giles Laura J. Stanton Mark Day May 21, 2015 HHS Acquisition: Ready. Resourceful.
NOT FOR PUBLIC DISTRIBUTION State of Minnesota Technology Summary February 24, 2011.
Viewpoint Consulting – Committed to your success.
Date: 03/05/2007 Vendor Management and Metrics. 2 A.T. Kearney X/mm.yyyy/00000 AT Kearney’s IT/Telecom Vendor Facts IT/Telecom service, software and equipment.
Chapter 3 Teaching with Instructional Software M. D. Roblyer Integrating Educational Technology into Teaching, 4/E Copyright © 2006 by Pearson Education,
Measuring the effectiveness of government IT systems Current ANAO initiatives to enhance IT Audit integration and support in delivering Audit outcomes.
Core Performance Measures FY 2015
Copyright © 2014 Lender Performance Group, LLC. All rights reserved. Managing risks associated with third-party relationships, in other words Vendor Management.
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
Hospitality Services Group COOPERATIVE PURCHASING SINCE 1989.
Value Management Group International, LLC : Product Control File ReviewVM G I.
1 Ex Ante Review of the SBD Program Energy Division Staff and Contractors Energy Efficiency Industrial/Agricultural Programs and Portfolio Forecasting.
On Target Group Coaching
Incentive Services Presented by D.E. Baetsen & Associates, LLC.
The Engine Driving Purchasing Management in Complex Environments MAGSOFT INTERNATIONAL LLC.
Expense Reduction: the timing has never been better! Lycia Rettig, Director Expense Reduction Analysts
1 Copyright © 2007 Accenture All Rights Reserved. About CIS Co-op Insurance Services (CIS)—a subdivision of the Co-Op Group—provides a full range of life,
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
1 Managing Vendors In A Rapid Change Environment Ken Horner Senior Vice President Strategic Sourcing and Contracts Administration June 14, 2001.
C&N / Legal / Pricing / Procure- ment / Client Opportunity Owner / Design Team Develop Proposal Plan / Validate Budget Develop Proposal SMAs provide advice.
Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi
Procurement Cost Reduction Client Cost Assessment
Client Accounting Service
Value Management Group International, LLC : Vendor Reviews, RFP Management and Contract Negotiations August 6, 2002VM G I.
Gerald DeHondt II Dr. Marvin Troutt Department of Management and Information Systems Kent State University.
Products and Services Overview. Rev Core Competencies.
IT 499 Bachelor Capstone Week 4. Adgenda Administrative Review UNIT Four UNIT Five Project UNIT Six Preview Project Status Summary.
Small Business Opportunities with the State of North Carolina Small Business Opportunities with the State of North Carolina Opportunities 2006 Asheville,
Value Management Group International, LLC : Dispute Resolution and Chargeback Performance Improvement OpportunitiesVM G I.
Federal Acquisition Service U.S. General Services Administration GSA Assisted Acquisition Services Peter Han General Services Administration March 16,
ARE YOUR APPLICATIONS HOLDING YOUR BUSINESS BACK?
Financial Service Providers SELECT YOUR OWN FINANCIAL SERVICE PROVIDER 1 ©2014 National Endowment for Financial Education | Lesson 5-4: Financial Service.
SABRE VIRTUAL PAYMENTS Karen Frayer Sabre Virtual Payments Manager.
Hollings Manufacturing Extension Partnership MEP Overview 2015.
TAXCO BUSINESS SERVICES INC. Division of Des-Dawn Corporation BOOKKEEPING | PAYROLL | TAX FILING | TAX PLANNING | CONSULTING INTRODUCING TAXCO BILL PAY.
Cisco Confidential © 2010 Cisco and/or its affiliates. All rights reserved. 1 Jeff McEachern Business Development Manager Smart Services Smart Care.
Overcoming Challenges with B2B Sales Name Position, Company Website Steve Sienkiewicz Accelerate Consulting | Sales Xceleration
Supply Chain Professionals Driving Complex Change ®
Administrative Cost Savings through Invoice Verification.
Strategic alignment.
Strategic Sourcing Best Practices. Formalizes the way information is gathered Strategic sourcing is a price based approach Leverages purchasing power.
Plan for Application Consolidation. Successful application consolidation relies on assessment of the application portfolio to determine the best candidates.
© CGI GROUP INC. All rights reserved ERP Success: An extraordinary opportunity Gordon Bruce, City and County of Honolulu, HI.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Overview of the CORE Project C OMMITMENT TO O PERATIONAL R EFORM & E FFECTIVENESS David Miller Vice President for Administration.
Cowlitz County, WA Accounting Function Review
Insider Connectivity Review & Savings Analysis
Ethernet Switch Replacement
Parts Management Agreements
Jitasa Overview.
BANKING INFORMATION SYSTEMS
Performance Playbook for GPO Value
Managed Content Services
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
Presenter's Name Service overview Gartner for Finance Leaders.
KEY INITIATIVE Shared Services Function Management
KEY INITIATIVE Shared Services Optimization
Gartner for Sales Leaders
Presentation transcript:

ATM and Branch Delivery Equipment Services/Maintenance Review Typical Project Overview February 2015

Equipment and Networks ● Expanding and Increasingly Complex/Diverse: -Number of units/locations and equipment relocations -Equipment types, models and functionality ● Changing Network/Delivery Expectations -Remote/automated network management -Network security/compliance requirements ● Rapidly Evolving Costs and Purchase Protocol -Increasing support services and costs -Negotiated versus traditional/historical equipment purchasing methodology -Prioritized versus general/proposed upgrades and/or replacements -Multiple providers versus sole source for equipment and support services -Increased administration, frustration and management costs Typical Client Conditions ATM and Branch Equipment Services/Maintenance – Project Overview 2

Typical Client Conditions FI’s continue to expand and relocate critical ATM and branch delivery equipment/systems – with limited vendor or internal review or update of equipment listings and service Resource limitations perpetuate ongoing confusion and frustration with contract documentation, services and costs Due diligence is difficult to justify relative to perceived risk/lack of options and time required to identify/validate modifications Clients rely on service vendors/provider(s) exclusively for regular services and contract review, updates and recommendations Situation : Updates and corrections to equipment listings are inconsistent – real time service requirements and documentation rarely matches current equipment in use Standard annual price increases are applied to all equipment reflected on listings at the time of each renewal Existing services/maintenance contracts are allowed to automatically renew versus being revised and/or renegotiated Clients are over reliant on service provider(s) for information, services and associated cost management Result: ATM and Branch Equipment Services/Maintenance – Project Overview Vendor Management 3

Where Key 2 Advisors Expertise Can Help They are spending significant sums of money on service contracts, central network management and billed work Existing contracts, invoicing and billed work documentation is exceptionally difficult to decipher Achieving clarification/understanding is very challenging; tiny bits of additional information/clarity are attained only after significant effort and tenacity Customers Recognize: What current contracts, service plans and centralized management really cover. Or not cover? What they should/could be paying for current service. Or are there other options available that may represent better value to the Institution? The ability to be appropriately informed may not be part of the current providers plan But May Not: ATM and Branch Equipment Services/Maintenance – Project Overview 4

Key 2 Services – What to Expect Enhanced Understanding /Clarity of Current Conditions -Equipment/locations now under/not under service coverage -Current service coverage; remote services, service plans, hours and contract terms -Current costs and contract terms/conditions Insight for Potential Change -Eliminating low value and/or un-needed service -Critical, strategic (cannot fail) equipment and delivery systems requiring service -Available/optional services, service plans and coverage -What you could/should be paying for needed services relative to peer institutions -Key vendor and contract negotiation strategies Benefits -Identify and secure services that best meets your current needs and value expectations -Proven tools and process to successfully identify and negotiate needed changes -Achieve significant, sustainable and on going service cost reduction ATM and Branch Equipment Services/Maintenance – Project Overview 5

Current Service Preliminary Assessment Total All Current Baseline (Annual) Costs: $ TBD (per client provided service documentation) ATM and Branch Equipment Services/Maintenance – Project Overview 6

Current Services Preliminary Assessment Service Elements, Issues and Opportunity Review Element General Assessment: Identified Issues Current ServicesPoor MarginalAppropriate (Y/N) Service Plan Coverage Response Time/SLA Other Equipment Coverage Non-Critical Systems Under Service Critical Systems /Lacking Service Low Value/cost benefit service Other Pricing Consistency General/Relative Pricing Other Contract Contract Terms and Conditions Other ATM and Branch Equipment Services/Maintenance – Project Overview 7

Current Service Preliminary Assessment Projected Minimum 3 Year Net Savings : $ TBD (Net of Project Fee) ATM and Branch Equipment Services/Maintenance – Project Overview 8

Program Fees Project Calculations (Based on Minimum Projected Savings) Current Annual Service/Maintenance Contract (Baseline) Costs: $ TBD Projected Percentage Service Cost Reduction (Minimum) TBD% Projected Revised Annual Service Costs$ TBD Projected Minimum Annual Savings $ TBD Projected Available One-time Credits/Other $ TBD Total Projected Available Annual Savings and Credits – Year 1$ TBD Our Program Fees are based on a % of the Total Identified Available Savings and Credits - Year 1 only Total Program Fee $ TBD Net 3 Year Service Savings (Net of Program Fee) $ TBD Branch and ATM Service/Maintenance – Project Review Project fees are performance based – and calculated on identified available savings, cost reduction and credits available in the first year period only.

Client Testimonials Washington Federal - Seattle, WA “Key 2 Advisors recently helped us to understand our expanding ATM equipment, service coverage, costs and what others were paying for similar products and services. They made the process simple, and the insight they provided allowed us to identify significant cost reduction opportunities. Tim strikes the right balance between presenting actionable opportunities and not being too pushy.” Brent Beardall, EVP/CFO Gesa Credit Union – Richland, WA " As a CIO/COO, one of my many responsibilities is to manage total costs of delivering strategic member services. Working with Tim and Key2 Advisors was a very positive experience; they took the time to help us to understand our current branch equipment service costs, options and to negotiate revised service contracts. Tim’s knowledge helped us complete our project on time – and to secure reduced service costs that were very competitive. Raj Bandaru, CIO/COO Spokane Teachers Institution – Spokane, WA “Key 2 was able to help us in areas where other consulting firms simply could not deliver; remote network updates, hardware service/maintenance revisions and renegotiating current contracts with long term ATM service and equipment providers. Russell Palmer, Card Services Manager

Executive Summary Service and Maintenance Project Review Current Conditions Financial Institutions have expanded their strategic branch and self service delivery networks in response to changing technology, compliance mandates and growing expectations for new/expanded services. These requirements continue to drive rapidly expanding service needs, complexity and challenges associated with managing equipment service, maintenance and related network support costs. Opportunity: A preliminary service assessment of both of the institution's current equipment service coverage, network support and costs will identify available opportunities for service improvement and cost reduction. This assessment will provide projected net 3 year minimum available savings in addition to options for service coverage modification and improvement. Recommendations Services provided by Key 2 Advisors are proven to substantially improve our customer’s ability to efficiently manage and execute service enhancement projects. Based on typical conditions and peer assessments we are confident that the institution would materially and significantly benefit from a service review project, and recommend that a preliminary assessment to confirm this potential be completed. ATM and Branch Equipment Services/Maintenance – Project Overview

Next Steps Step 1 Contact provided peer Key 2 Advisor referrals/clients with completed/similar projects and confirm results. Step 2 Initiate preliminary service assessment. Step 3 Review and approve Key 2 Advisor project proposal and contract documents. Step 4 Initiate project as proposed. ATM and Branch Equipment Services/Maintenance – Project Overview

Phone - (760) 537 – Visit us on line at