Session 11 Multi-Level Bill of Material Explosion pom

Slides:



Advertisements
Similar presentations
CS1102 Lec04 Hardware – Inside the Box Computer Science Department City University of Hong Kong.
Advertisements

Material Requirements Planning
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Inventory and MRP 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Material Requirements Planning
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
6. Material Requirements Planning (MRP)
MRP and Related Concepts
Principles of Operations Management
Material Requirements Planning (MRP)
Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
Materials Requirement Planning (MRP)
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Class 24: Chapter 15: Materials Requirements Planning Class 24 Agenda –Review Deliverables Due Dates –Review Final Exam 90% of the 30 questions will come.
Material Requirements Planning Dr. Everette S. Gardner, Jr.
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP, MRP II, and ERP.
Material Requirements Planning
Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level Product Structure Tree.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
2017/4/22 Chapter 7 ~ HOMEWORK ~ By: Prof. Y. Peter Chiu.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
Material Requirements Planning (MRP)
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
MRP Systems MRP – Material Requirements Planning Commonly used method in industry to coordinate the production scheduling of end items and their associated.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
Material Requirements Planning
Assembling and Disassembling a PC
Chapter 15 MRP and ERP.
Lecture 9 Materials Requirements Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
4/4: Material Requirements Planning Dependent inventory model For in-house inventory planning.
Parts of the computer.
Chapter 15 Resource Requirements Planning: MRP and CRP.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Introduction to Materials Management Chapter 4 – Material Requirements Planning.
Resource Planning Chapter 15.
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
BUAD306 MRP.
Material Requirements Planning Chapter 2. MRP in MPC.
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
Chapter 12: Learning Objectives Instructor Slides You should be able to: 1.Describe the conditions under which MRP is most appropriate 2.Describe the inputs,
CHAPTER-14 MRP AND ERP MD. TAZIDUL ISLAM. 2  Material Requirement Planning (MRP) is the concept of designing and developing information system to aid.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
Material Requirements Planning
MIS Topic # 5 1 Bill of Materials. MIS Topic # 5 2 Bill of Materials Definition It is an engineering document that specifies the ingredients.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
IDENTIFY COMPUTERS PARTS PLACE YOUR NAME AND PERIOD HERE.
LESSON 5 Introduction to Materials Requirements Planning (MRP)
Computers are your Future
Materials Requirements Planning
Lecture 34 MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16 Materials Requirements Planning
Material Requirements Planning and Enterprise Resource Planning
MRP and ERP.
Introduction to Materials Management
Motherboard and its component What is Motherboard? Location Function.
MATERIAL Requirements planning MRP
MRP and ERP.
Material Requirement Planning (MRP)
Embedded System Development Lecture 13 4/11/2007
Major Inputs to MRP Process: 1. Bill of Material
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Session 11 Multi-Level Bill of Material Explosion http://www. pom Session 11 Multi-Level Bill of Material Explosion http://www.pom.edu/mpc/lectures_in_manufacturing_planning.htm lecture session 11 Product Structure Diagrams Multi-Level Bill of Material Explosion: Linking MRP Records Front and Back Loaded Schedules Lead Time Offsetting Technical Issues

Product Structure Example: P301 Computer Memory board (M) Assemble 4 RAM chips and 1 switch (S) onto a board type (X). Arithmetic board (A) Assemble 1 integrated microprocessor (Z) with 2 ROM chips and 1 switch (S) onto a board type (Y). M A

Product Structure Example: P301 Computer (Continued) Processor unit (P) Working from back to front of the box casing (B), assemble one switch (S) to the inside of each of the 4 plug connections at the back of the box. Then fit 4 memory boards (M) into the 4 identical rows of connectors. Finally, fit the arithmetic board (A) into the front connector row.

Product Structure Example: P301 Computer (Continued) Final Assembly The video unit (V) and the keyboard unit (K) have been preassembled (with connecting cables). Simply connect the sockets on the end of their cables to the corresponding plugs at the rear of the processor unit (P). The computer is now ready to use. V K P

Product Structure Example: P301 Computer (Continued) Draw the product structure tree according to the assembly directions. Determine low-level codes for each product. Assume no inventory of any item. How many of each part should be available to assemble one completed unit?

Product Structure Diagram P301 Computer

Product Structure Diagram P301 Computer (Continued) b., c. Item Low-Level Code Quantity Required for One Unit* A – Arithmetic Board 2 1 B – Box Casing C – Ram Chip 3 16 K – Keyboard Unit M – Memory Board 4 P – Processor Unit R – ROM Chip S – Switch 9 V – Video Unit X – Board Type X Y – Board Type Y Z - Microprocessor *Assuming no inventory for any item

Product Structure Diagram P301 Computer

Linking MRP Records: Examples The Big B Bike and Trike Shop produces two basic bikes called A and B. Each period, Paul, the owner. plans to assemble 10 A bikes and 5 B bikes. Given this information and the following product structure diagrams for A and B, fill out the MRP records for component parts G and Y for the next seven periods.

Linking MRP Records: Examples (Continued)

Linking MRP Records: Examples (Continued) MPS Bike B: 5 u/period Bike A: 10 u/period

Linking MRP Records: Problem 8 Part a

Linking MRP Records: Problem 8 Part b Suppose 10 units of safety stock are required for part Y. What changes would result in the records? Would the MRP system produce any exception messages? Exception message: period 2 below safety stock. There will be an increase in the order in period 1 from 18 to 28 units.

Front and Back Scheduling Example Peter’s Power Tools (PPT) has just received an order for 50 PPT band saws, to be shipped at the beginning of period 9. Information concerning the saw assembly is given in this table. Draw the product structure diagram PPT band saw Item Lead time (periods) Components Saw 2 A(2*), B, C(3) A 1 E(3), D B D(2), F(3) C E(2), D(2) D E F 3 *Number of parts required to make one parent.

PPT Product Structure Diagram Draw the product structure diagram Saw A (2 required) B C (3 required) E D F

PPT Front Loaded Schedule Construct a Gantt chart for the new order using front scheduling logic. E D F A C B SAW 1 2 3 4 5 6 7 8 9 Period Number

PPT Back Loaded Schedule Construct a Gantt chart for the new order using back scheduling logic. F D E B C A SAW 1 2 3 4 5 6 7 8 9 Period Number

Scheduling Explanation The front scheduling logic causes all the work to be done ahead of schedule which creates additional inventory and occupies resources that could be used on other orders. MRP applies back scheduling logic so that parts and components are completed when they are needed to fill customer orders.

Lead Time Offsetting Precedent Relationship Components of Lead Time Set-up Time Run Time Material Handling Time Queue Time Staging Time Cumulative Lead Time Advantage of Back Loaded Schedules

Technical Issues Low Level Coding Indented Bill of Materials Pegging Cumulative Lead Time Planning Horizon Processing Frequency Regeneration Net Change