LMP-G Policy Issues Discussion Demand Side Working Group July 9 th, 2015 1.

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
1 Shams Siddiqi, Ph.D. Representing LCRA and Rates and Resources Council (RRC) consisting of 31 NOIEs serving Central Texas TAC.
Loads in SCED v2 Subgroup
1 Wal-Mart’s View on Demand Response Program Design Anoush Farhangi Angela Beehler.
Comverge Comments on NPRR555 ©2012 Comverge – Confidential and Proprietary Colin Meehan
Discuss infrastructure to support bilateral contracting between CSPs and REPs in the Retail Market Loads in SCED Sub-group May 22,
Loads in SCED v2 Subgroup The LMP-G Journey 1. TAC Endorsement of LMP-G TAC voted to endorse “LMP-G” rather than “Full LMP” as the mechanism to enable.
Loads in SCED v2 Subgroup Update to DSWG 3/9/
Loads Acting as a Resource Relationships with QSEs and LSEs
Loads in SCED Version 2 Proxy G Proposal. This is a proposal from Carl Raish as an individual … it has not been vetted internally at ERCOT and should.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
The Alternative Energy Policy Landscape Surrounding AR.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
Electric Restructuring In Pennsylvania Sonny Popowsky Pennsylvania Consumer Advocate May 10, 2007 Institute for Regulatory Policy Studies Transforming.
1 Availability of Aggregated Customer Usage Information: An Overview of D California Public Utilities Commission Presentation before the California.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
POSTAL CONFERENCE 25 th – 27 th February 2015 Nairobi, Kenya By Yvonne UMUTONI Chairperson of EACO Working Group 9 (Quality of Service and Consumer Affairs)
FleetBoston Financial HIPAA Privacy Compliance Agnes Bundy Scanlan Managing Director and Chief Privacy Officer FleetBoston Financial.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Retha Britz Copyright 2013 All rights reserved for this presentation 1 Other important considerations for RECs Retha Britz.
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
ENSURING THE SUCCESS OF A VIBRANT EILS PROGRAM ERCOT STEEL COMPANIES MARK W. SMITH SMITH TROSTLE LLP AUSTIN, TEXAS.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
The Wholesale Market Subcommittee Update Prepared for the September 25th TAC meeting.
Load Participation in Real-Time Market: LMP Minus G.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
October 14, 2015 LRIS v2 / Self-scheduled Third party DR Provider Data Submission Proposal Carl L Raish.
LMP-G Policy Issues Matrix LRISv2 Subgroup July 23 rd,
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
This slide deck contains animations. Please open this deck in slide show mode (“View” menu, then click on “Slide Show”). To move through the animations,
ERCOT MARKET EDUCATION Retail 101. Legal Disclaimers and Admonitions PROTOCOL DISCLAIMER This presentation provides a general overview of the Texas Nodal.
ERS Update – DSWG Presentation September 21, 2012.
LMP-G Policy Issues Matrix LRISv2 Subgroup July 23 rd,
OPSI Annual Meeting October 13, Session 6 Reliability Pricing Model: Are Further Changes Necessary? Reluctantly…yes But States should also be.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Small Resettlements A Proposal to Reduce Impact on ERCOT and Market Participants.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
LMP-G Update to DSWG LRISv2 Subgroup Aug. 20,
Building Blocks for Premise Level Load Reduction Estimates ERCOT Loads in SCED v2 Subgroup July 21, 2014.
ERCOT MARKET EDUCATION Retail 101. Market Rules Overview Topics in this lesson...  Introduction to Market Rules Public Utility Regulatory Act PUCT Substantive.
LRISv2 Subgroup Proxy $G Discussion 10/27/
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
Third Party DR Self-Deployment Loads in SCEDv2 Subgroup Sept. 18, 2015.
Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.
1 Summary of TAC Procedures May 5, Revision of TAC Procedures Project began in October 2004 to incorporate the Commercial Operations Subcommittee.
1 Market Participant Default Joint Taskforce Update and Report on Recent Customer Transition Activity Report to WMS August 17, 2005.
Thoughts on DER Aggregations ERCOT Staff DREAM TF Sept. 28, DER Aggregations.
Draft NPRR Weather Sensitive ERS Loads December 2012.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
Community Choice Aggregation Update
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Alternative Approach for Loads in SCED v.2
Load Participation in Real-Time Market: Loads in SCED version 2
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Reflecting Losses in DR within ERCOT August 22, 2012
The New Texas Wholesale/Retail Market
CEO Report Thomas F. Schrader ERCOT Board of Directors May 17, 2005
Advancing Solar PV at Lower Cost: Performance Based Incentives, Price Certainty, and Equitable Rate Treatment Ronald Gerwatowski – Senior VP, National.
Presentation transcript:

LMP-G Policy Issues Discussion Demand Side Working Group July 9 th,

TAC Motion on LMP-G On Oct 6 th, 2011, TAC voted “to affirm the WMS recommendation for the further development of the LMP minus G option” What does this TAC action mean? – Is this a directive to implement LMP-G? – Is this a mandate to enable direct access for 3 rd party DR providers? – Do we need to seek clarity from TAC? 2

LMP-G Policy Issues/Questions The principle of LMP-G asserts that customers should not receive financial benefit more than once for providing their demand response (i.e. double payments). Do PUCT rules need to be established to ensure that customers are receiving the appropriate incentives? Or does providing the wholesale market incentives to REPs/DR QSEs fulfill the principle of LMP-G? – Does LMP-Proxy $G ensure that customers never receive double payments? – Does LMP-volumetric G ensure that customers never receive double payments? Do concerns with the complexity and accuracy of LMP-G outweigh the policy concerns with Full LMP? Should TAC reconsider Full LMP as the solution to provide 3 rd Party DR Provider access? 3

LMP-G Policy Issues/Questions Some LMP-G issues may be outside of the authority of the ERCOT stakeholder process to decide – Can ERCOT bill an LSE/REP QSE for energy not consumed? – If so, the LSE/REP must have ability to pass those assessed charges through to the customer No provision in current PUC Rules to permit this pass- through. – Can an LSE/REP bill a customer for energy not consumed under PURA or PUCT rule? Could the billing take the form of a “DR Participation Charge” rather than bill for unused energy? 4

LMP-G Policy Issues/Questions Other LMP-G issues that may be outside of the authority of the ERCOT stakeholder process to decide – Tracking customer switches and notifying both REP of Record and DR QSE – Customers’ right of rescission and process for rectifying inadvertent switches – REP’s ability to charge an early termination fee, and/or change a customer’s rate plan when customer joins a 3 rd party aggregation, if the current rate plan includes an incentive tied to real-time prices 5

LMP-G Policy Issues/Questions LSEs/REPs and DR QSEs should operate with comparable, equitable and reasonable rules, requirements & regulations for customer recruitment, consumer protection, switch tracking, and information disclosure. – PUC Rule may be required to detail mechanics of switch administration. 3 rd Party DR Providers must be subject to comparable: – Regulations governing customer engagement and recruitment – Consumer protection, including right of rescission and privacy of proprietary customer information – Mechanisms to track, validate, and contest (if erroneous) customer switching (e.g. from a REP DR program to a 3 rd Party) – Requirements and Information Disclosures to Residential and Small Commercial Customers 6

LMP-G Policy Issues/Questions Loads should contribute to wholesale price formation Market uplift should be minimized Existing ORDC and Loads in SCED bid to buy structures should be maintained Cost of implementation should be weighed against potential participation and market benefits – Economics of DR expansion are challenging in the current era of tepid wholesale prices and low volatility – Third-party access to DR customers will not materially change this value proposition 7

LMP-G Policy Issues/Questions If LMP-G is required, should it be LMP-VG or LMP-Proxy $G? Or both? – Most if not all of existing LR-RRS fleet can be accurately baselined at customer level for LMP- VG; should LMP-VG be a priority? For both LMP-$G and LMP-VG, eligibility checks would be required to assure LSE/REPs and DR QSEs are not participating with the same customers 8

LMP-G Policy Issues/Questions Should certain retail rates disqualify a customer from Proxy $G treatment? What retail rates should disallow Proxy $G treatment? What mechanism should be used to enforce a retail rate disqualification? Does a REP have right to move customer to a rate that is consistent with Proxy $G? Or is the choice of DR programs and rates the customer’s? 9

LMP-G Policy Issues/Questions How should the value of Proxy $G be established? – Minimum POLR rate is not always indicative of actual hedging costs. Should there be a mechanism for notifying an LSE/REP that its customer has enrolled with a DR QSE? Should it be TX SET? Given the lack of participation in Loads in SCED v1, should the initial roll-out of LMP-G require TX SET changes? – Should a TX SET solution be contingent on a MW participation trigger? What should the appropriate MW level be? 10

LMP-G Policy Issues/Questions Should DR Provider become a new type of ERCOT Market Participant? Should customers have a DR Provider of Record, similar to REP of Record? – Can rules be adopted to prevent DR-blocker strategies by REPs? – Can rules be adopted to prevent REP offer blocker strategies by DR QSEs? – How should competing claims for DRPOR be resolved? How to manage REPs/LSEs that also have a DR QSE entity? – Can a REP be a DRPOR for another REPs customers? 11

LMP-G Policy Issues/Questions Under Loads in SCED v1, QSE must be the LSE/REP for all sites in ALR; should this concept be retained? – DR QSE ALR->LSE/REP allocation; Should all customers in a DR QSE ALR be required to have a single LSE/REP? Should an LSE/REP DRPOR (serves 100% of its ALR Load) have the option of participating with an Offer to Sell rather than Bid to Buy? – Should this be disallowed? Should DR Providers be afforded any protection against stranded cost issues for DR devices, other than customer contract terms? 12

LMP-G Policy Issues/Questions Snapback effect needs more attention – Potential for DR QSEs to shift costs onto LSEs/REPs; or could have large effect on DR QSEs, either in paying for it or designing strategies to minimize it. DR QSEs must obtain permission from a NOIE to solicit customers for Loads in SCED participation in NOIE territories – DR QSE ALRs can combine customers from NOIE and competitive territories so long as minimum portfolio threshold is met 13