RB2000 Users Conference. The Vision Bank Experience Antonio Jimenez, Jr.

Slides:



Advertisements
Similar presentations
Altiris for Desktop Management and More! Presented by: ITS (Scott Arnst and Kathleen Conover) January 16, 2004.
Advertisements

PRISMA SYSTEMS SAVCO 3.5 & 4.x. What is SAVCO? SAVCO® is a complete integrated software that has all essential components to manage and run a savings.
Company Equipment Upgrade Proposal. The Current Situation  It has been five years since Alt-F4 Inc. has upgraded any of it’s equipment.  200 Computers.
Capital Banking Solutions A Fresh Start in Banking Systems By Vantage Business Systems.
OVERVIEW TEAM5 SOFTWARE The TEAM5 software manages personnel and test data for personal ESD grounding devices. Test and personnel data may be viewed/reported.
Electronic Working Papers CCH ProSystem fx Engagement NSAA Information Technology Workshop and Conference Grand Rapids, MI October 3, 2014 Bruce C. Vaughan,
PrimeSoft Solutions (K) Ltd
Crew Management, Operations Control & Commercial Planning System
Operating System Customization
Rural Banker 2000 (RB2000) Banking Software Magandang Japon!
GrandMaster Suite Canada’s Premiere Payroll Processing tool! Electronic Funds Transfer (EFT) Module.
GrandMaster Suite Canada’s Premiere Payroll Processing tool! Schedule Module.
Module 2: Planning to Install SQL Server. Overview Hardware Installation Considerations SQL Server 2000 Editions Software Installation Considerations.
ILLiad Migration & Server Upgrade: From Your Library's' IT Point of View Juan Denzer Library System Specialist August 1, 2013.
AMG Attendance System Product Description Copyright © 2009 AMG Employee Management, Inc.AMG Employee Management, Inc.
Presented By: Shashank Bhadauriya Varun Singh Shakti Suman.
Request For Proposal Barbara Antuna Ronald Healy Chad Hodge Andrew James Mel Ocampo.
THE QUE GROUP WOULD LIKE TO THANK THE 2013 SPONSORS.
Computerized Networking of HIV Providers Networking Fundamentals Presented by: Tom Lang – LCG Technologies Corp. May 8, 2003.
November 2009 Network Disaster Recovery October 2014.
P RESENTATION ON M ANAGEMENT I NFORMATION S YSTEM By Prithnee Moneea Bsc(Hons)Business Informatics (Top-Up)
CELTS Collection Exchange & Loan Tracking System Efficiency Tools, Inc. P.O. Box Carrollton, Texas Phone Let Efficiency.
6/1/2001 Supplementing Aleph Reports Using The Crystal Reports Web Component Server Presented by Bob Gerrity Head.
Introduction to HP LoadRunner Getting Familiar with LoadRunner >>>>>>>>>>>>>>>>>>>>>>
PayDox Corporate Document Management System Rotech AB Interface Ltd Business Software Integration.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
RB2000RB Features of RB2000. RB2000RB FEATURES Windows-Based Client Server Technology LAN & WAN Capable Wizard-Type “Menu Driven” Setup &
Chapter 7 Microsoft Windows XP. Windows XP Versions XP Home XP Home XP Professional XP Professional XP Professional 64-Bit XP Professional 64-Bit XP Media.
9/10/20151 Hyperion Enterprise 6.5 New Features & Functionality Robert Cybulski, CPA Finit Solutions.
New Features Line Item Accounting Customizable windows Family Walkout Date Based Reporting.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Purpose Intended Audience and Presenter Contents Proposed Presentation Length Intended audience is all distributor partners and VARs Content may be customized.
ISG We build general capability Introduction to Olympus Shawn T. Brown, PhD ISG MISSION 2.0 Lead Director of Public Health Applications Pittsburgh Supercomputing.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
AMSI Hosting Options User Panel Discussion Presented by Brian Torney Session 107 Advantages of Self Hosting.
Common Servers in a Workplace Environment Brandon Reynolds Computer Electronic Networking Dept. of Technology, Eastern Kentucky University.
OBJECT ORIENTED SYSTEM ANALYSIS AND DESIGN. COURSE OUTLINE The world of the Information Systems Analyst Approaches to System Development The Analyst as.
Unit 8b Troubleshooting; Maintenance and Upgrades; Interaction with Vendors, Developers, and Users Component 8 Installation and Maintenance of Health IT.
California State University, Northridge Certification Process Team B Carlos Guzman John Kramer Stacey LaMotte University of Phoenix.
Computer Emergency Notification System (CENS)
CSI-MAXIMUS, Inc CSI Comprehensive Service & Support Implementing the CSI Way.
GrandMaster Suite Canada’s Premiere Payroll Processing tool!
MIS Gap Analysis “Make technology work for you”. Assumptions All training participants are from banks that have a memorandum of agreement for microfinance.
RB 2000 RB2000RB MABS Management Meeting UPDATES on RB2000 January 28, 2003 Unit 511, PDCP Landco Center Davao City.
TrainingRegister® Training Management Software Maintain Permanent Training Records for Each Individual Monitor and Track Required Training Know Who Needs.
LG DATABASE AND REPORTING SYSTEM (LGDRS) 8-9 September 2015
Chapter 9  2000 by Prentice Hall. 9-1 Client/Server Computing.
ISG We build general capability Introduction to Olympus Shawn T. Brown, PhD ISG MISSION 2.0 Lead Director of Public Health Applications Pittsburgh Supercomputing.
BANGKO PINOY RURAL BANK
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
MICROENTERPRISE ACCESS TO BANKING SERVICES (MABS) AN OVERVIEW.
Breakout Session Solutions to the Pending Concerns Raised After the 2 nd RB2000 Users’ Conference.
Introduction to System Administration. System Administration  System Administration  Duties of System Administrator  Types of Administrators/Users.
SemiCorp Inc. Presented by Danu Hunskunatai GGU ID #
An Introduction to Local Area Networks An Overview of Peer-to-Peer and Server-Based Models.
User Adoption CRMUG Dallas Chapter Meeting 5/14/2014.
Technical Specifications
Electronic Working Papers
Windows Server 2008 and SQL 2008 Windows Server 2008.
CORPORATE PROFILE MUSTARD SEED SYSTEMS CORPORATION
Introduction of Week 3 Assignment Discussion
Chapter 2 Objectives Identify Windows 7 Hardware Requirements.
Ch > 28.4.
GrandMaster Suite Canada’s Premiere Payroll Processing tool!
Relate to Clients on a business level
Networks Software.
Experience with an IT Asset Management System
Web Server Administration
Purge-it! USP's, pre-sales process & helping the customer to decide
Have you seen this screen?
Presentation transcript:

RB2000 Users Conference

The Vision Bank Experience Antonio Jimenez, Jr.

Background VisionBank, Inc. The VisionBank, Incorporated is the rural financial institution established by ARDCI to house its saving and lending activity. It opened its doors wide to the public for the first time in October 2002 with main office at Bato, Catanduanes. ARDCI owns 87% of its capital stock and 99% of its voting stock. ARDCI plans to register the other five NGO branches to VisionBank this year. The branch offices will be located in Baras, Virac, Viga, Caramoran and San Andres.

Company Profile Name:Vision Bank Address:Poblacion Libon, Bato, Catanduanes Type:Microfinance Oriented Bank Branches:One (1) Date Incorporated:March 2002 # Employees:26

Accounts Profile # Savings Accts:4000 # Loan Accounts4000 Loan Products:REM, Chattel, Salary Loans & Microfinance (Individual & Group) Ave. Transactions / Day: Regular Savings Micro-Loans Average Loan SizeP18,000 to P25,000

Proximity to Manila By plane – 1 hour and 15 minutes By land via Tabaco, Albay – 12 hours bus ride and 3 – 4 hours ferry

RB2000 Setup Hardware –File Server – IBM xSeries 325, dual processor, Pentium 4 – Xeon, 1-GB RAM, Three (3) 36GB Raid 5 Hard disks –Local Area Network (LAN) Teller(s), Bookkeepers, and other users Software –Windows 2000 Small Business Server (SBS) –Workstations: Windows Me, Windows XP

RB2000 Setup Installed Modules: –Deposit Management Module (DMM) –Loan Management Module (LMM) –General Ledger Module (GLM) –Server-based installation but not integrated (non-GLI) Technical Support –By Phone –Bug fixes and patches are sent through –On-call remedial visits

Issues & Concerns No proper Gap and Requirement Analysis done Hands-on training was conducted for only 2- days Bank’s existing procedures cannot be accommodated by the previous installed version e.g. entry of payments was designed initially for individual micro-loans Report formats are not compliant to internal and external reportorial requirements

Issues & Concerns Very slow End-of-Day Process (2 to 3 hours) Slow transaction processing time – due to initial hardware setup Users’ Manual was not provided in hardcopy and ISSEC did not inform the bank that electronic copies are available at the File Server Backup and Restore procedure was done through the SQL Enterprise Manager which is risky and requires high-level technical expertise Independent scripts and programs were executed during the early implementation of RB2000

Issues & Concerns Installing RB2000 needs full time ISSEC personnel ISSEC personnel visits the bank almost every month during the first year of implementation “EFFECT: The users were throwing negative feedback to the RB2000 System and the bank’s Board almost decided to replace the RB2000 System”

Status (Now) Re-training of RB2000 staff for one-week in 2003 by ISSEC with MABS presence –Users now are comfortable in using the system –Minimal downtime experience ISSEC provided full-time technical support to address the following: –Programming bugs –Non-compliant reports –Enhance functionality to address procedural gaps

Status (Now) To address slow processing time: –Developed batch entry routine for group lending –Separated the batch entry for required savings from loan amortization payment routine –Purging of database files –Created a separate database solely for loan processing –The data entry screen also provides selection for clients with loan borrowings from deposit-only clients –The bank has also upgraded the hardware component New file server Acquired better Ethernet Switch

Status (Now) “EFFECT: The users are now very satisfied with the performance of the RB2000 System: Start-of-Day Processing time is less than 10 minutes (from 3 hours) Interactive processing time is now twice as fast as before Reports are now compliant to the required format ISSEC personnel has only visited once this year and is due for another visit in October 2005 The Board has decided to install the RB2000 System to future branches to be opened

Advice to Fellow Users Top management should be involved in the decision process to acquire and use any banking system Require your rollout companies to conduct a thorough gap analysis before installing the system Require an extensive and comprehensive training before implementing or using the RB2000 system The bank should, in turn, follow the recommended computer hardware requirements

Advice to Fellow Users The bank should employ an internal IT staff or systems administrator to minimize the cost The bank should always document the concerns and problems encountered and the corresponding resolutions It is not advisable to use the General Ledger Interface if both LMM and DMM have not been stable yet. Vision Bank has not implemented the GLI yet.