INSY 3021 Auburn University Spring 2008 Performance Rating.

Slides:



Advertisements
Similar presentations
Square Peg and Round Hole… As parents and educators, the change in grading systems requires a fundamental switch in our thinking… 4=A 1=F 2=D 3=B.
Advertisements

ORGANIZATION Using Manipulatives. LEARNING TARGETS Students will understand that organization refers to effective leads and conclusions, logical pacing.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S10-1 Operations.
1 Virtual COMSATS Inferential Statistics Lecture-7 Ossam Chohan Assistant Professor CIIT Abbottabad.
Measurement Systems Analysis with R&R INNOVATOR Lite TM The House of Quality presents.
Ch. 29: Predetermined Time Systems
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Direct Time Study Sections: Direct Time Study Procedure
Time Study Procedure - Overview
1 ISE Ch. 26: Predetermined Time Systems Frank and Lillian Gilbreth broke work into therbligs (elements). The next step is to assign time values.
QUALITY ASSURANCE Work Load. Workload is the sum of the work achieved or to be achieved, obtained by multiplying the raw count of each individual procedure.
T T18-03 Exponential Smoothing Forecast Purpose Allows the analyst to create and analyze the "Exponential Smoothing Average" forecast. The MAD.
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
2000 by Prentice-Hall, Inc1 Chapter 17 - Human Resources in Strategic Planning  TQM recognizes importance of employees  Education & training viewed as.
System Design and Analysis
INSY 3021 Time Study Auburn University Spring 2005.
Maintenance Work Measurement
T T18-05 Trend Adjusted Exponential Smoothing Forecast Purpose Allows the analyst to create and analyze the "Trend Adjusted Exponential Smoothing"
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Direct Time Study Chapter 13 Sections: Direct Time Study Procedure
What are competencies – some definitions ……… Competencies are the characteristics of an employee that lead to the demonstration of skills & abilities,
How to Effectively Implement Set-up Reduction in Any Organization.
Business and Management Research
Math 116 Chapter 12.
1 Work Sampling Can provide information about men and machines in less time and lower cost. It has three main uses: 1.Activity and delay sampling To measure.
Work Design and Measurement Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 8 Supplement Roberta.
7 Design of Work Systems.
Operations and Supply Chain Management, 8th Edition
Classroom Assessment A Practical Guide for Educators by Craig A
4. Time Study The major objective of this chapter is to learn how to calculate a time standard based on stopwatch time study procedures.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Evaluation of Inter-rater Reliability for Movement and Posture Observations of workers in an Audio Compact Cassette Plant Dararat Techakamolsuk Pornchai.
1 Procedure for the determination of time required to perform a task involving either human or machine under certain standard conditions of measurement.
PS 225 Lecture 20 Linear Regression Equation and Prediction.
Chapter 10 Standard Costs and the Balanced Scorecard.
MIS Reports & Analysis MABS Mindanao Supervisors Forum August 25, 2004 Anthony P Petalcorin MABS National MIS Manager.
Time Series - A collection of measurements recorded at specific intervals of time. 1. Short term features Noise: Spike/Outlier: Minor variation about.
Copyright © by Houghton Miffin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
Introduction to System Analysis and Design MADE BY: SIR NASEEM AHMED KHAN DOW VOCATIONAL & TECHNICAL TRAINING CENTRE.
T T18-02 Weighted Moving Average Forecast Purpose Allows the analyst to create and analyze the "Weighted Moving Average" forecast for up to 5.
Predetermined Time Systems
IE 366 Chapter 24 Time/Job. IE 366 Work Measurement ● Goal: determine standard time for a task. ● Techniques – Direct Time Study – Predetermined Time.
7 Design of Work Systems.
MECH 373 Instrumentation and Measurement
7 Design of Work Systems.
Classroom Assessment A Practical Guide for Educators by Craig A
MSA / Gage Capability (GR&R)
Operations Management Work Measurement Supplement 10
Mary Corcoran January 9th, 2014
Mixed Costs Chapter 2: Managerial Accounting and Cost Concepts. In this chapter we explain how managers need to rely on different cost classifications.
1 2 3 INDIAN INSTITUTE OF TECHNOLOGY ROORKEE PROJECT REPORT 2016
Determining the Rating Factor
Predetermined Time Systems
JOB DESIGN Work Measurement.
Ch. 29: Predetermined Time Systems
ENM 301 Work Study ‐ Time Study ‐ ENM 301
Predetermined Motion Time Systems
Predetermined Motion Time Systems (PMTS) BY okolie jude…………
Business and Management Research
Predetermined Motion Time Systems (PMTS)
Principles of Accounting 2002e
Standard Costing and Variance Analysis
Introduction to Work Measurement
(Lecturer in Mech. Deptt.)
Software metrics.
T18-08 Calculate MAD, MSE Purpose Allows the analyst to create and analyze the MAD and MSE for a forecast. A graphical representation of history and.
Planning Training Programs
Production and Operations Management
Time and Motion Study Rebecca Johnston Operations Management
Presentation transcript:

INSY 3021 Auburn University Spring 2008 Performance Rating

Normal Performance Benchmarks 0.38 min for walking 100 ft, details should state terrain, load, clothing, etc.. The more clear-cut and specific the definition, the better.

Rating Characteristics Accuracy (paramount), should not deviate by more than 5% from other trials Consistency, Rating higher or lower every time is easier to correct than fluctuations Desirable systems are: Simple, concise, and easy to explain

Rating Types For short element time/cycle times (15-30 sec), it may be more practical to rate the entire study rather than individual elements (TP) For longer elements/cycles (over 30 sec), individual ratings maybe necessary (TP)

Rating Methods Westinghouse System Synthetic Rating Speed Rating Objective Rating

The Westinghouse System Evaluates performance with respects to: Skill, effort, conditions, and consistency

Skill “Proficiency at following a given method.” Proper coordination of mind and hands Six skill degrees/classes: Poor, fair, average, good, excellent, and super + 15 to – 22 range

Effort “Demonstration of the will to work effectively.” Stopwatch Six effort classes: Poor, fair, average, good, excellent, and excessive + 13 to – 17 range

Conditions Present conditions with respect to normal conditions Temperature, ventilation, light, noise, etc… Six condition classes: Poor, fair, average, good, excellent, and ideal + 06 to – 07 range

Consistency Elemental times that continually repeat would be consistent Six consistency classes: Poor, fair, average, good, excellent, and perfect + 04 to – 04 range

Overall Performance Algebraically sum the four individual factors Add this to one Courses available to train analysts, with approximately 25 hours spent watching videotapes to develop the needed skill

Synthetic Rating Determines a performance factor for elements of the cycle by comparing actual elemental observed times to those developed by analyzing fundamental motion data, such as MTM or MOST

Speed Rating Only considers the rate of accomplishment of the work per unit time First determine if the performance is above or below normal Quantify the difference between the actual output and that expected by a “NORMAL OPERATOR” Can be tied to benchmarks such as walking, dealing cards, VO 2

Objective Rating Establishes a single work assignment, against which the pace of all others are measured A second factor relates its relative difficulty Influences are: Amount of body used, foot pedals, bimanualness, eye-hand coordination, handling or sensory requirements, and load Multiply the two factors together

Rating Training & Maintenance Provide initial, refresher, and continuing training to all assigned analysts Record all ratings in analysts file, with the deviations from other analysts Periodically validate their skill level

Questions & Comments