1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.

Slides:



Advertisements
Similar presentations
Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Advertisements

RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
1 HBD Update Itzhak Tserruya DC Upgrades meeting HBD, BNL, July 13, 2005 Prototypes  Full scale HBD  Readout board  FEM Final detector  HBD Design.
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Preliminary Results from a Trial Beam Test of the Small HBD Prototype at LEGS Bob Azmoun BNL HBD Working Group Meeting May 10, 2005.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Sasha Milov HBD upgarde Feb 8, Assembly and testing facility. Sasha Milov Feb 8, 2005 Glove Box Other needs Testing.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
1 Update on SB The Stony Brook Crew. 2 QE Reproducible in Addn’l Test Excellent QE again (basically identical). Excellent QE again (basically identical).
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL, April 11, 2007.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
1 Sasha Milov DC meeting Nov 9, 2005 HBD upgrade status. Sasha Milov Nov 09, 2005.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Status Update Stony Brook Crew. Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
CLAS12 Drift Chamber Prototyping
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
GEM tests at BNL Zvi, Sasha, Ilia and others. Triple GEM detector tests Last Tuesday after HBD meeting we exchanged CF4 by Ar/CO2 but still there were.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Il Ring Imaging CHerenkov (RICH) detector a Jefferson Lab – Hall A.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
1 Update from the Tent Thomas K Hemmick for the Tent People.
6/29/2016I. Ravinovich1 HBD status in Run-10 I. Ravinovich WIS.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
CLAS12 Forward Tracking: Status and Challenges
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

2 Sasha Milov DC meeting Dec 7, 2005  Mechanical assembly  Photocathode production and measurement  Glove Box modification  GEMs testing  Electronics status  Beam testProgress:

3 Sasha Milov DC meeting Dec 7, 2005  Mechanical parts are being produced  Delay in the PCB due to changes in the pad design  Finalizing the HV panel design  Good progress in GEM assembly and test. Mechanical assembly.

4 Sasha Milov DC meeting Dec 7, 2005 Pad plane design.  Fixed number of electronics channels (192 per sector) needs to be matched with the number of pads. Best solution in the old version eliminates acceptance loss by wiring pads between HV sectors. That might create grounding problems. To avoid that we consider modification of the pad shape at the edges where pads are partially shadowed by GEM frames. That has several advantages:  best grounding  easy to match with N channels  no acceptance loss  somewhat smaller pad size (good) a=15.0 mm

5 Sasha Milov DC meeting Dec 7, 2005 Pad plane production  Pad plane production is foreseen at CERN ( as done for the full scale prototype).  Quotation is higher than originally estimated (small problem)  Delivery time is 19 weeks !!! (big problem). Negotiations are underway with CERN to speed up production a factor of two at least.

6 Sasha Milov DC meeting Dec 7, 2005 New HV panel.  Eliminates the HV divider boxes. Reduces the number of HV cables to the HBD and the number of SHV connectors on the HBD from 168 to 48.  HV dividers should be made smaller to reduce the material and mechanical stress on the detector boxes. Current version is below.  Prototype constructed and tested up to 6 KV without any problem (operating voltage is less than 4 KV).

7 Sasha Milov DC meeting Dec 7, 2005  INFN evaporator from JLab is at SUNYSB is up and working vacuum down to 8E-8 mbarr capable to produce 4 full size at a time Q.E. control works inside the vessel Residual Gas Analyzer works inside the vessel  Produced several 10x10 cm 2 photocathodes on GEMs (previously used and washed, but fully operational)Photocathodes.  Q.E. is controlled during production at SUNYSB and precisely measured at BNL.  Results are: a) reproducible b) as good as best WIS results !!!

8 Sasha Milov DC meeting Dec 7, 2005  GB bids came out x2.5-x5 higher than originally planned.  INFN GB is not a good investment opportunity.  Way out: reconsider procedure to lower cost of the required GB. Pipe-line gain test & installation rather than doing them in one shot First the gain test is done on all needed shots for CsI cathodes. Each successful cathode goes into high vacuum storage. Only when all needed cathodes are made installation of all cathodes into HBD vessel begins. Such new protocol makes glove box smaller AND takes better care of GEMS. New bid process for (budget)-lighter table was started yesterday. Use Laminar Table prior to deposition instead of GB, which provides STRICT control over dust and less that of H 2 O and O 2 but they are not yet an issue. Laminar table is better solution than using GB (better dexterity). A working table is in possession, needs fresh filters... on order.  These changes reduce the needed size of the glove box by 2X.  We can additionally reduce the cost by re-engineering the air-lock (flow-through not pumped). Glove Box design vs. cost.

9 Sasha Milov DC meeting Dec 7, 2005  Vacuum storage needed for new procedure is the ultimate quality storage for GEM+CsI. A suitable Stainless steel vessel was found (free) Missing end-flanges were made ($1800) Turbo Pump (borrowed) will be removed from NSL beam line 2 weeks from now (free).  Re-assessed overall budget and it seems with the new glove box design we are on track.  Design of full sized GEM holder for evaporator done and in shop.  Ancillary designs (pizza boxes, railroads, flip tables,...) underway (finished conceptually). Other parts needed.

10 Sasha Milov DC meeting Dec 7, 2005 GEM testing.  GEM triplet assembled at WIS has ~50% gain variation across the area  Production of other GEMs was suspended to investigate the reasons.  Assembly procedure was found not to be an issue, it is well reproducible.

11 Sasha Milov DC meeting Dec 7, 2005 GEM testing. Ratio of single GEM gain product over triplet is flat. That proves that the large gain variations in the triple GEM detector are not due to assembly. The non-uniformities in single GEMs add to a larger effect in the triple GEM module. Strategy: A possible solution to minimize the gain variations in the triple GEM detector is to make all possible combinations of GEMs and to choose the combinations with minimum spread. For that the gain maps of each GEM (corrected for P/T variations) will be stored in a database. CERN production is restored

12 Sasha Milov DC meeting Dec 7, 2005 Electronics status (FEE).  Motherboard with preamps is installed on the prototype at BNL.  Signals and noise are under investigation.  Shielding helps a lot!

13 Sasha Milov DC meeting Dec 7, 2005 Outside channelInside channel 20 pe Test pulse 100,000 e’s HV connected (V=0), all 68 preamps plugged in 1.4 mV  ~ 0.6 pe1.1 mV  ~ 0.4 pe Electronics status (FEE).

14 Sasha Milov DC meeting Dec 7, 2005 Propose going to single test cell to save $ Use valves to switch gas test cell Gas transmission monitor

15 Sasha Milov DC meeting Dec 7, 2005 Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse (7 blank boards, 4 crates+ 1 spare+ 2 test stands) (4 blank boards, 1 needed + 1 spare+ 2 test stands) (25 blank boards. We have most of the parts for 5 boards) Optical out – Design is done -- checking New DCM daughter card design is done -- checking For Clockmaster, clock fanout, ADC and backplane, the prototype boards are assembled Electronics status (FEM).

16 Sasha Milov DC meeting Dec 7, 2005 LEGS beam test.  Everything was in place and ready to go, besides LEGS magnet.  Got water leak from the repaired coil on the day of operation. This problem cannot be fixed and would require a major repair.  Optimistic forecast brings us to the end of spring.  Other options are very welcomed, like getting beam at AGS.

17 Sasha Milov DC meeting Dec 7, 2005  Mechanical assembly is on its way. Some modifications are made to the pad plane and HV feed-ins.  CsI Q.E. curve is good and reproducible  Glove Box is reconsidered to match existing budget. Requires slightly different game plan on assembly, but well doable without quality compromise.  GEM testing is important. GEMs will be separately tested at WIS and assembled in triplets to get best uniformity  Electronics has in work. Motherboard is under test with the prototype.  Test beam is needed. LEGS option is still considered, but nothing will happen soon.Summary:

18 Sasha Milov DC meeting Dec 7, 2005 BACKUPS

19 Sasha Milov DC meeting Dec 7, 2005 Clock Master Board GTM Input Clock Circuits Ethernet interface Serial data In/out

20 Sasha Milov DC meeting Dec 7, 2005 Signals from Preamp Receiver/ shaping ADC FPGA HBD ADC board

21 Sasha Milov DC meeting Dec 7, 2005 HBD ADC crate Clock Fanout Clock and serial data cables from ClockMaster Clock cables We have just enough connectors for populating 3 slots 2 weeks ago.

22 Sasha Milov DC meeting Dec 7, 2005 Status Get the ADC board and backplane middle/late of last week Finish assemble the system Monday morning. Testing is in progress

23 Sasha Milov DC meeting Dec 7, 2005 HV on, Ar/CO 2 (70/30) Positive signals ? 55 Fe signal