Drawdown Drawdown Sub Committee Mario Andella Melvin Bertram Paula Bertram.

Slides:



Advertisements
Similar presentations
Protecting Michigans Water Resources James Clift, Michigan Environmental Council October 23, 2008.
Advertisements

Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Ecological Systems Maintaining and Enhancing Natural Features and Minimizing Adverse Impacts of Infrastructure Projects Course Review.
Hayward Water System Public Health Goal Report Alex Ameri, Deputy Director of Public Works Utilities Division Department of Public Works.
Management Plan: An Overview
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
7:00 pmWelcome and introductions 7:05pmHLWD planning overview Plan update process 7:25 pmStakeholder involvement Watershed problems 7:40 pmPublic comment.
Wetland Functions and Values Fundamentals for Conservation Commissioners Training Program - Unit 5 Fundamentals for Conservation Commissioners Training.
Sections 10 and 404: NMFS’ Oversight, Concerns and Actions
Nelly Smith EPA Region 6. - Develop or revise bacteria reduction program for consistency with new TMDL requirements and allocations - Develop or revise.
Sovereign Waters Lake Management Plan Outcomes and Recommendations 9 May 2013.
SOUTH FLORIDA WATER MANAGEMENT DISTRICT Loxahatchee River Management Coordinating Council – January 30, 2012 Patti Gorman Science Supervisor, Applied Sciences.
Hydroelectric Relicensing in Vermont Brian Fitzgerald Vermont Agency of Natural Resources.
The Benefits of Investing In Conservation… …and the Costs of Not Investing Developed by Daniel Mountjoy USDA - Natural Resources Conservation Service Laura.
Indicator Species. What is an indicator species? A species whose presence, absence or abundance reflects a specific environmental condition, habitat or.
1 Massachusetts Wetlands Regulations and the MCP Rachel Freed Mass. Department of Environmental Protection Wetlands and Waterways Program Northeast Regional.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
April 22, 2005Chester Creek Watershed TMDL Total Maximum Daily Load Chester Creek University Lake & Westchester Lagoon Alaska Department of Environmental.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Maintaining Watersheds. Next Generation Science/Common Core Standards addressed! HS‐ESS2‐5. Plan and conduct an investigation of the properties of water.
Presentation to the Workshop Climate Change and Great Lakes Water Levels March 30, 2001 Chicago, Illinois Gerald E. Galloway, Jr., P.E., Ph.D. International.
ADMINISTRATION OF LAKE RESTORATION AND WATER RESOURCES IN FINLAND 1.Lakepromo seminar Kuopio Division Manager Markku Maunula The Finnish.
The hydrograph How would you expect deforestation to influence this response? ---Consider the terms of the hydrological balance equation Short-term response.
City of New Braunfels Edwards Aquifer and the Habitat Conservation Plan HCP Implementing Committee May 29,
9 Closing the Project Teaching Strategies
Grand Haven Pond Study: An Investigation to Reduce Nutrient Loads and Evaluate Alternative Management Practices in Stormwater Ponds Mark Clark Wetlands.
Georgia Adopt-A-Stream Introduction Georgia Adopt-A-Stream 2 Martin Luther King Jr. Dr. SW Suite 1462 East Atlanta, Georgia
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Lake Apopka Restoration Proposed projects for Legislative Appropriation.
Implementation Procedures (IPs) Brittany Lee Standards Implementation Team
St. Johns River Water Management District Special Publication SJ97-SP8 Water Management Alternatives: Effects on Lake Levels and Wetlands in the Orange.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Hickory Hills Lake – Lake Management Committee Debris Management Sub-Committee Paul LawnMario Andella Dave MacDonaldDana Dudley March 18 th, 2009.
Chemical Treatment. Herbicides & Algaecides Chemical treatment is one of the oldest methods used to manage nuisance aquatic weeds, and is still the most.
MIG 2 - Water Quality and Quantity Study Plan Review April 2, 2008.
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
HYDROELECTRIC POWER AND FERC. HYDRO 101A ”Water Runs Down Hill”
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
Fairy Lake Annual General Meeting Dave Macpherson Water Management Technical Specialist Parry Sound District Ministry of Natural Resources.
Lesson 1.5 Pg
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
Proposition 1 Workshop: the Grant Application Process July 2015.
Copyright © Kenneth Adelman, California Coastal Records Project. Malibu Lagoon Slide 1.
Department of Public Works Submittal of Comments to the County of Los Angeles on the Draft Environmental Impact Report and Proposed Alternatives for the.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Department of Environmental Quality Coastal Habitat Protection Plan (CHPP) 2 Department of Environmental Quality Environmental Management Commission.
Environmental Flow Instream Flow “Environmental flow” is the term for the amount of water needed in a watercourse to maintain healthy, natural ecosystems.
57th Annual Meeting of the GLFC Buffalo, NY June 6-7, 2012 Water Level Regulation in the LO/SLR System Environmental Considerations and Plan BV7.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
River Management can significantly alter the seasonal hydrograph Before Ottawa R dams After Ottawa R dams.
permitting.
Sanitary Engineering Lecture 8. Water Reuse Water reuse describes the process whereby wastewater (it's include storm water which is a term used to describe.
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Nunavut Water Board Public Hearing
Phase 2 Hope Bay Belt Project
Phase 2 Hope Bay Belt Project
Our Mission We work with landowners, communities, and organizations to protect lakes and rivers through developing effective, transferable, long-term solutions.
Hudson Wetlands Protection Bylaw
Drww general membership meeting
Public Meeting February 19, 2009
Aquatic Invasive Species (AIS) & Wild Rice/ Manoomin
Watershed Literacy & Engagement
Pond Dipping You can determine the Water Quality Index by observing and counting the different species of benthic macro-invertebrates. Benthic: the ecological.
DG Environment, Nature Protection Unit (D3)
The normal balance of ingredients
LIFE and the implementation of the Water Framework Directive
WHALE TAIL PIT Expansion Project
Agricultural Order 4.0 Discussion
Presentation transcript:

Drawdown Drawdown Sub Committee Mario Andella Melvin Bertram Paula Bertram

What is Drawdown? Drawdown is the lowering of water over the Autumn period to allow oxidation, desiccation and compaction of sediments. Plant growth is affected by freezing the roots, roots then rise and plants are unable to establish themselves. Drawdown is the lowering of water over the Autumn period to allow oxidation, desiccation and compaction of sediments. Plant growth is affected by freezing the roots, roots then rise and plants are unable to establish themselves.

Advantages May reduce available nutrients or nutrient rations, affecting algal biomass and composition May reduce available nutrients or nutrient rations, affecting algal biomass and composition Opportunity for shoreline clean-up/structure repair Opportunity for shoreline clean-up/structure repair Flood control utility Flood control utility May provide rooted plant control May provide rooted plant control

Disadvantages Possible impacts on non-target resources Possible impacts on non-target resources Possible impairment of water supply Possible impairment of water supply Alteration of downstream flows and winter water level Alteration of downstream flows and winter water level May result in greater nutrient availability if flushing inadequate May result in greater nutrient availability if flushing inadequate

Studies Recommended/Required According to Dominic Meringolo of Aquatic Control Technologies several reports/investigations would be needed to minimize impact to flora and fauna and to ensure that sufficient lake levels are maintained to promote healthy flora/fauna environment and to allow recreational uses. According to Dominic Meringolo of Aquatic Control Technologies several reports/investigations would be needed to minimize impact to flora and fauna and to ensure that sufficient lake levels are maintained to promote healthy flora/fauna environment and to allow recreational uses.

Map showing water depths across the entire lake – This could be done by a professional, or by the Lake Association – using a gps sonar device depths are captured around the lake. Map showing water depths across the entire lake – This could be done by a professional, or by the Lake Association – using a gps sonar device depths are captured around the lake. Using the depth map professional would evaluate the hydrology of the lake to determine safe level of draw down and environmental impacts associated with drawdown. Things that will be taken into consideration: Using the depth map professional would evaluate the hydrology of the lake to determine safe level of draw down and environmental impacts associated with drawdown. Things that will be taken into consideration: Sufficient depths must be maintained to allow fish to overwater. Sufficient depths must be maintained to allow fish to overwater. Impacts to wetland growth must be considered. Impacts to wetland growth must be considered. Impact to shallow wells and water supply would have to be evaluated (including public well at Woodlands). Impact to shallow wells and water supply would have to be evaluated (including public well at Woodlands). Important to understand hydrology budget for the water body to be certain that the water body will refill in a timely fashion. Important to understand hydrology budget for the water body to be certain that the water body will refill in a timely fashion. Depending on local conservation commission, a complete hydrology study may be required. Depending on local conservation commission, a complete hydrology study may be required.

Potential Reviewing Agencies Lunenburg Conservation Commission Lunenburg Conservation Commission Shirley Conservation Commission Shirley Conservation Commission Division of Fisheries and Wildlife Division of Fisheries and Wildlife DEP DEP Nashua River Watershed Association Nashua River Watershed Association

Permitting According to Lee Lyman of Lycott, the State usually will permit a drawdown of 2’ without difficulty, however anything more than 2’ is an involved permit process. Currently the level of Hickory Hills lake is lowered in accordance with the recommendations of Dam Safety (approx. 16” – 18”). According to Lee Lyman of Lycott, the State usually will permit a drawdown of 2’ without difficulty, however anything more than 2’ is an involved permit process. Currently the level of Hickory Hills lake is lowered in accordance with the recommendations of Dam Safety (approx. 16” – 18”). Lyman commented that the State would want documentation as to why substantial drawdown is required, he recommends a drawdown level of 6-7’to be effective. According to the Mass Lake Management handbook even an additional 12” of drawdown can be effective. Lyman commented that the State would want documentation as to why substantial drawdown is required, he recommends a drawdown level of 6-7’to be effective. According to the Mass Lake Management handbook even an additional 12” of drawdown can be effective. Dominic Meringolo of Aquatic indicated that in his experience typically a permit from the local Conservation only is required. Dominic Meringolo of Aquatic indicated that in his experience typically a permit from the local Conservation only is required. Lake Shirley’s drawdown Program is permitted by the Lunenburg and Shirley Conservation Commissions in accordance with the Wetlands Protection Act. Lake Shirley’s drawdown Program is permitted by the Lunenburg and Shirley Conservation Commissions in accordance with the Wetlands Protection Act.

Permit Submittal Requirements in Accordance with Wetland Protection Act Public and/or Private Water Supplies Determine any wells or water supply intakes which could dry up during a drawdown. Describe mitigation to be provide if water supply impacts are unavoidable. Rare Species Demonstrate the absence of rare wildlife habitat or that drawdown will not adversely effect the habitat if present. Fisheries Estimate area and depth zones to be dewatered. Verify the presence of a deep-water pool or other refuge areas with sufficient dissolved oxygen levels to prevent fish kills. Provide drawdown/refill dates, estimate of refill time, and estimated downstream flow rates during refill. Alternative Analysis The Applicant should consider all reasonable alternatives for controlling target plants and explain why drawdown (or drawdown used with other methods) was chosen. Control of Target Species Provide a map showing the distribution/density of target and non- target plants; a list of target species to be reduced; verification that target species would be reduced; and, verification that target species would be dewatered. Dam/Outlet Control Structures Document maximum drawdown depth and evaluate the dam’s structural integrity to verify that it can withstand drawdown. Document the rate and duration of drawdown, and a contingency plan if the structure is stuck in an open position.

Water Quality Discuss potential project impacts to productivity, nutrient cycling, sediment inputs, and potential algal blooms. Address, sediment/erosion controls, removal of accumulated sediments prior to drawdown, and other measures to minimize potential for flushing nutrients and sediments downstream. Fisheries Discuss the potential positive and negative impacts to fish habitat, including downstream impacts to fisheries habitat resulting from low flows during refill. Provide estimated downstream flow rates during drawdown and refilling. Discuss the potential adverse impacts to freshwater shellfish species, including clams and crayfish. Wildlife Habitat Discuss potential impacts on small mammals, waterfowl, invertebrates, amphibians, and reptiles. These impacts may be related to the timing of the drawdown versus the start of hibernation or brumation periods and reductions in vegetation preferred by wildlife. Flood Control and Storm Damage Prevention Discuss the potential for downstream flooding during the drawdown and prevention of damage to public interests by flood waters or storms. Prevention of Pollution Discuss (1) the anticipated impact of drawdown on the productivity, nutrient cycling, sediment inputs and potential for algal blooms and (2) the potential for flushing nutrients, sediments and other pollutants to downstream lakes and ponds. A 401 Water Quality Certificate should also be obtained from the DEP-Division of Water Pollution Control. Bordering Vegetated Wetlands (BVW) Drawdowns commenced after November 1 with refill completed by April 1 will contribute to the protection of BVW. Variability of this date is permissible on a case-by-case basis. However, drawdowns should be completed by December 1 whenever possible to minimize wildlife impacts

Drawdown Schedule The drawdown schedule will be determined by the evaluation of surrounding flora/fauna and the hydrology of the water body. In general Lee Lyman of Lycott recommends a September/October drawdown (State recommends November 1st), and then starting the refilling process after the 1st hard freeze. Dominic Meringolo of Aquatic stressed that starting the re-fill process at the appropriate time is critical, additionally minimum flow has to be maintained to support flora/fauna. The drawdown schedule will be determined by the evaluation of surrounding flora/fauna and the hydrology of the water body. In general Lee Lyman of Lycott recommends a September/October drawdown (State recommends November 1st), and then starting the refilling process after the 1st hard freeze. Dominic Meringolo of Aquatic stressed that starting the re-fill process at the appropriate time is critical, additionally minimum flow has to be maintained to support flora/fauna.

Lake Shirley Drawdown Program Lake Shirley has been using drawdown as a lake management technique for many years to control macophytes. Lake Shirley has been using drawdown as a lake management technique for many years to control macophytes NOI sought a 6 foot drawdown, drawdown request in sought 9’ drawdown 2002 NOI sought a 6 foot drawdown, drawdown request in sought 9’ drawdown 2006 NOI requests commencement of drawdown on October 8 th at rate of 2” per day – drawdown depth anticipated to be reached on November 25 th 2006 NOI requests commencement of drawdown on October 8 th at rate of 2” per day – drawdown depth anticipated to be reached on November 25 th

Lake Shirley Drawdown Annual Reporting Annually the LSIC submits an Annual Drawdown Report to the Shirley Conservation Commission following drawdown in accordance with Shirley Order of Conditions Annually the LSIC submits an Annual Drawdown Report to the Shirley Conservation Commission following drawdown in accordance with Shirley Order of Conditions Report is extensive contains information such as; Report is extensive contains information such as; Summary of Process Summary of Process Graph of drawdown levels Graph of drawdown levels Monthly precipitation data Monthly precipitation data Outflow Measurements Outflow Measurements Other Impacts Other Impacts Conclusions & Recommendations Conclusions & Recommendations

Lake Shirley Costs (2006 Filing) Consultant Support & Filing Fees - $2,000 Consultant Support & Filing Fees - $2,000 Data Gathering & Hearing Appearances - $0 (completed by LSIC Director) Important to note that Shirley has utilized drawdown for a number of years and had a great deal of studies and data available for NOI filings. Data Gathering & Hearing Appearances - $0 (completed by LSIC Director) Important to note that Shirley has utilized drawdown for a number of years and had a great deal of studies and data available for NOI filings. Annual Vegetation Surveys - $3,000 each Annual Vegetation Surveys - $3,000 each Outflow Measuring Program - $0 if setup by River Ways Program; participation requires regular data gathering Outflow Measuring Program - $0 if setup by River Ways Program; participation requires regular data gathering

Expected Costs Drawdown is a relatively inexpensive lake management technique, if the means to conduct a drawdown are present. Where an outlet structure facilitates drawdown, the cost may be as little as what is required to obtain permits, open and close the discharge structure, and monitor. If pumps are required to lower the water level, the drawdown will be more expensive. It is unusual to alter a dam for less than $100,000, but if the structure already supports water level control, costs of $3,000 to $10,000 per year would be a reasonable expectation for permitting and monitoring. Where protected species are present, permitting may be difficult and monitoring and mitigation costs can escalate. (2004 Practical Guide)

Areas for Further Investigation Integrity of sluice gate to be utilized for drawdown Integrity of sluice gate to be utilized for drawdown Details of existing limited drawdown program Details of existing limited drawdown program Compilation of existing reports and data Compilation of existing reports and data

Sources 2004 Practical Guide to Lake Management in Massachusetts, Executive Office of Environmental Affairs 2004 Practical Guide to Lake Management in Massachusetts, Executive Office of Environmental Affairs Aquatic Control Technologies s.html Aquatic Control Technologies s.html s.html s.html Geosyntec Consulting heets/Lake%20Level%20Drawdown.pdf Geosyntec Consulting heets/Lake%20Level%20Drawdown.pdf heets/Lake%20Level%20Drawdown.pdf heets/Lake%20Level%20Drawdown.pdf Lycott Environmental Lycott Environmental Carl Luck, Former LSIC Board of Director Carl Luck, Former LSIC Board of Director