Magnetic Material Specification and Procurement Strategy Dawn Munson 1.

Slides:



Advertisements
Similar presentations
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
Advertisements

RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
Final/Shipout Inspection Approved for Public Release.
Introduction to Integrated Library Systems
Global Supplier Quality Manual PPAP Requirements
PPAP Requirements Training
First Article Inspection Report
PURCHASING 101 HOW TO BEGIN. Is the purchase available from the District Warehouse?  Online catalogs are/will be available on the district web page for.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
DOL AME Grant RFPs Manufacturing Lab Equipment Pre-Award Webinar July 25, 2013.
Project Procurement Management Mohammad A. Rob
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Robert Ruland MMF Bench/CMM Procurement Plan October 14, 2004 MMF Review 1 MMF Bench / CMM Procurement Plan Robert Ruland Procurement.
Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.
High Lights of SAP Business One for Manufacturing.
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
Project Management Gaafar 2007 / 1 Procurement Management* Dr. L. K. Gaafar *This Presentation is Based on information from the PMBOK Guide 2000 and
SAP R/3 Materials Management Module
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
Very Small-Value Procurement Under World Bank/IDA Small Grants, Loans and Credits Zagreb Regional Procurement Training Feb. 27 – March 3, 2006.
Managing Project Procurement
1 ROLES, RESPONSIBILITIES, AND TIMELINES FOR CONTRACTING ADMINISTRATIVE GUIDELINE NUMBER 3 Harpers Ferry Center Office of Acquisition Management August.
P RO C OM For Your Business Communication Needs A Proposal Communication Company Slide 1 of 14 How Solicitations Are Typically Organized and Presented.
State of Oklahoma Information Services Division Contracts and Purchasing Unit 1.
ILearningCampus.com Understanding by doing and learning by talking.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
PPMT CE408T Engr. Faisal ur Rehman. Presentation Outline Project Porcurement Managment Project Closure.
From Research Prototype to Production
ALCOM Confidential 1 Supplier Controlled - Safe Launch Plan Sep 2013.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.
SJDAdvisory Committee Dec Production & Maintenance Steven J. Durand December, 2004.
Compressor status AWAKE Technical Board meeting 19 August 2015.
LCLS-II Magnetic Structure Design Review Steve Marks 7/6/11 1.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Dr. John MacCarthy UMBC CMSC 615 Fall, 2006
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
US Belle II Project Contracting Lead: W. Kevin Grubbs March 14, 2014.
Department of Property and Procurement Division of Procurement Property & Procurement Economic Development Seminar Friday & Saturday, May 6 & 7, 2016.
Design and Measurement Results for the Permanent Magnet Undulators for the Linac Coherent Light Source Facility II D. Arbelaez BeMa2014, 01/02/2014.
PURCHASING 101 SECTION 1 - How to Begin. Is the purchase available from your agency or from other state agencies? ⋆ State Surplus Property ⋆ State Fleet.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
The most common methods to use to obtain pricing. VERBAL QUOTES REQUEST FOR INFORMATION REQUEST FOR PROPOSAL REQUEST FOR QUOTATION INVITATION TO BID REVERSE.
ERP/QMS by PMI Aerospace ERP/QMS by PMI Aerospace
Project Management – PTM712S
Conduct Procurement-II
System Level Performance Spec System Level Performance Spec
How to develop a request for proposal document.
Harpers Ferry Center Office of Acquisition Management August 2010
Presentation Title Goes Here
Enterprise Content Management Owners Representative Contract Approval
First Article Test (FAT) / Production Lot Test (PLT)
PRODUCT EVALUATION & TESTING BRANCH SUPPLIER SUPPORT DIVISION II
First Article Inspection (Per AS9102)
Finance Summer Training
Rockies Purchasing Services
Lockheed Martin Canada’s SMB Mentoring Program
Procurement.
First Article Inspection
How do you prepare a request for proposal (RFP)?
First Article Inspection (Per AS9102)
Project Procurement Management
LCLS Undulator System Production Management
LCLS Vacuum System Plans (July 07)
East Hall under construction
Presentation transcript:

Magnetic Material Specification and Procurement Strategy Dawn Munson 1

Magnetic Material Specification Material properties requirements are detailed in LBNL Engineering Specification – Magnetic Properties Mechanical Properties Magnetic Testing Packaging and Shipment Acceptance Criteria This specification in conjunction with mechanical detail drawings and the contract will dictate the magnets for the LCLS-II undulators. 2 LCLS-II Magnetic Structure Review

Magnetic Material Specification The volume of magnetic material needed for both undulator type blocks will likely require more than one manufacturing lot To maintain continuity, it will be required that any one shipment contain material from a single manufacturing lot At a minimum, a shipment is the quantity of blocks required for a single HXU or SXU undulator 3 LCLS-II Magnetic Structure Review

Magnetic Material Specification Magnet block coating Requirement is for Aluminum mm to mm thick Based upon ALS experience Proprietary coatings are likely to be proposed by potential vendors. Acceptance of this coating will be dependent on radiation exposure testing* and is compatible with Loctite Hysol® EA9360™ epoxy adhesive Prototype blocks may use a coating other than aluminum with the provision that testing is to be completed before production begins on the full order 4 LCLS-II Magnetic Structure Review * Requirement applies to coatings with organic content, such as VACCOAT 10047

Procurement Strategy Goal: to qualify two vendors for future procurement of blocks for full scale prototypes and production Request for Proposal will solicit quotations for:  Prototype HXU blocks – four standard magnet modules and eight end modules  Prototype SXU blocks - four standard magnet modules and eight end modules  Will include tooling as separate items  Will include options for production quantities Initial procurement will be for HXU prototype blocks LBNL Buyer – Gina Goodman Slide 5LCLS-II Magnetic Structure Review

Procurement Strategy - Costs Based upon estimated cost of $8.2M/m 3* HXU: ~$150/block  34 periods per module, 2 blocks/period: $10.2K/module  106 periods per device, 4 blocks/period: $63.6K/device  32 devices: $2.04M total SXU: ~$650/block  19 periods per module, 2 blocks/period: $24.7K/module  61 periods per device, 4 blocks/period: $158.6K/device  18 devices: $2.86M total * Estimates are based on ALS historical material costs Slide 6LCLS-II Magnetic Structure Review

Procurement Strategy - Acceptance Acceptance Criteria  Documents detailing the representative magnetization of each material lot  The data file from the block measurements, in ASCII format  Documentation detailing any surface void or chips larger than 1 mm 3  Testing verification and documentation of any alternate coating for the magnet blocks  All tooling and materials as outlined in the purchase contract Slide 7LCLS-II Magnetic Structure Review

Procurement Strategy - Tracking Material test reports Block measurement files Production photographs LBNL and/or the selected assembly sub-contractor will visually inspect all magnet blocks Random blocks will be selected and tested to verify the data supplied by the manufacturer Slide 8LCLS-II Magnetic Structure Review

Procurement Strategy - Schedule Schedule:  Release RFP end of July  Award end of August  Take delivery of prototype magnets ~February, 2012  Full scale prototype block purchase ~July, 2012  Production procurement award ~July, 2013 Slide 9LCLS-II Magnetic Structure Review