2012 Independent Advisory Committee (IAC) Guidance to the SDEB.

Slides:



Advertisements
Similar presentations
Tips and Resources IASC Cluster/Sector Leadership Training
Advertisements

The WMO Vision for Global Observing Systems in 2025 John Eyre, ET-EGOS Chair GCOS-WMO Workshop, Geneva, January 2011.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Barbara J. Ryan Director, WMO Space Programme.
2013 Independent Advisory Committee (IAC) Guidance to the SDEB.
© The Aerospace Corporation 2014 Observation Impact on WRF Model Forecast Accuracy over Southwest Asia Michael D. McAtee Environmental Satellite Systems.
Meteorological Service of Canada – Update Meteorological Service of Canada – Update NOAA Satellite Proving Ground/User-Readiness June 2, 2014 David Bradley.
Deirdre Kann National Weather Service WFO Albuquerque Deirdre Kann National Weather Service WFO Albuquerque 7 th GOES User’s Conference October 21, 2011.
Transitioning unique NASA data and research technologies to operations GOES-R Proving Ground Activities at the NASA Short-term Prediction Research and.
Update on GOES-R Proving Ground Activities at the Operations Proving Ground Chad Gravelle GOES-R/JPSS All-Hands Call – 7 July 2014.
The Utility of GOES-R and LEO Soundings for Hurricane Data Assimilation and Forecasting Jun Timothy J. Schmit #, Hui Liu &, Jinlong and Jing.
1 GOES Users’ Conference October 1, 2002 GOES Users’ Conference October 1, 2002 John (Jack) J. Kelly, Jr. National Weather Service Infusion of Satellite.
Transitioning research data to the operational weather community Use of VIIRS DNB Data to Monitor Power Outages and Restoration for Significant Weather.
UW-CIMSS/UAH MSG SEVIRI Convection Diagnostic and Nowcasting Products Wayne F. Feltz 1, Kristopher M. Bedka 1, and John R. Mecikalski 2 1 Cooperative Institute.
PHAB's Approach to Internal and External Evaluation Jessica Kronstadt | Director of Research and Evaluation | November 18, 2014 APHA 2014 Annual Meeting.
Surface Transport Service Delivery Dr Tang Xu Director, WDS WMO WMO; Name of Department (ND)
Science Mission Directorate National Aeronautics and Space Administration transitioning unique NASA data and research technologies The SPoRT Center – Infusing.
GOES Users’ Conference The Role of Geostationary Satellites in WMO’s Global Observing System Dr. Donald E. Hinsman Senior Scientific Officer WMO Satellite.
School’s Cool in Kindergarten for the Kindergarten Teacher School’s Cool Makes a Difference!
2015 NOAA Satellite Conference Greenbelt, MD April 27, 2015 NESDIS Center for Satellite Applications and Research (STAR) Dr. Al Powell, Director Dr. Michael.
EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group for Meteorological Satellites - CGMS EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
Polar Communications and Weather Mission Canadian Context and Benefits.
NOAA Satellite Proving Ground/User Readiness Meeting
1 CIMSS Participation in the Development of a GOES-R Proving Ground Timothy J. Schmit NOAA/NESDIS/Satellite Applications and Research Advanced Satellite.
Kim J. Runk June 4, 2014 Satellite Proving Ground User Readiness Meeting.
1 Requirements Gathering, Validation, and Concept Studies GOES Users’ Conference Boulder, CO October 1-3, 2002.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Precipitation and Flash Flood.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
Deirdre Kann Brian Guyer National Weather Service Albuquerque Deirdre Kann Brian Guyer National Weather Service Albuquerque GOES R Satellite Proving Ground.
Advanced Baseline Imager (ABI) will be flown on the next generation of NOAA Geostationary Operational Environmental Satellite (GOES)-R platform. The sensor.
US BENEFITS. It Addresses Priorities The US and Canada have common scientific, economic and strategic interests in arctic observing: marine and air transportation.
P1.85 DEVELOPMENT OF SIMULATED GOES PRODUCTS FOR GFS AND NAM Hui-Ya Chuang and Brad Ferrier Environmental Modeling Center, NCEP, Washington DC Introduction.
Satellite Activities in MSC Ontario and the Satellite Products Working Group (SPWG) Edwina Lopes, Manager Science, WEO Ontario Environment Canada SAAWSO.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Infrared Temperature and.
GOES-R Recommendations from past GOES Users’ Conference: Jim Gurka Tim Schmit Tom Renkevens NOAA/ NESDIS Tony Mostek NOAA/ NWS Dick Reynolds Short and.
NWS Operations Proving Ground Update Chad Gravelle OCONUS Meeting 20 June 2013.
High impact weather studies with advanced IR sounder data Jun Li Cooperative Institute for Meteorological Satellite Studies (CIMSS),
Transitioning research data to the operational weather community Overview of GOES-R Proving Ground Activities at the Short-term Prediction Research and.
Summary of GOES-R Activities at CIMSS/ASPB and Recommendations for the Future Steven Ackerman, Tom Achtor GOES-R Algorithm Working Group GOES-R Algorithm.
2010 Technical Advisory Committee (TAC) Guidance to the AWG June 10, 2010 Technical Advisory Committee Members David ByersKevin Schrab Mike JohnsonTom.
Studies of Advanced Baseline Sounder (ABS) for Future GOES Jun Li + Timothy J. Allen Huang+ W. +CIMSS, UW-Madison.
OSSEs and NOAA’s Quantitative Observing Systems Assessment Program (QOSAP) Bob Atlas, Craig MacLean, Lidia Cucurull (NOAA, USA) Sharan Majumdar, Tom Hamill.
User Readiness Issues for GOES-R Jim Gurka Tim Schmit (NOAA/ NESDIS) Tony Mostek (NOAA/NWS) Dick Reynolds (Short and Associates) 4 th GOES Users’ Conference.
Transitioning unique NASA data and research technologies to the NWS 1 In-House Utilization of AIRS Data and Products for Numerical Weather Prediction Will.
1 Numerical Weather Prediction Subcommittee Chairs: Ralph Petersen/Mark DeMaria MEMBERS NESDIS/ORA: Bob Aune, Paul Menzel, Tim Schmit, Dan Tarpley NESDIS/OSD:
Satellite Precipitation Estimation and Nowcasting Plans for the GOES-R Era Robert J. Kuligowski NOAA/NESDIS Center for Satellite Applications and Research.
1 Recommendations from the 2 nd GOES-R Users’ Conference: Jim Gurka Tim Schmit NOAA/ NESDIS Dick Reynolds Short and Associates.
Early Results from AIRS and Risk Reduction Benefits for other Advanced Infrared Sounders Mitchell D. Goldberg NOAA/NESDIS Center for Satellite Applications.
DIRECT READOUT APPLICATIONS USING ATOVS ANTHONY L. REALE NOAA/NESDIS OFFICE OF RESEARCH AND APPLICATIONS.
 Federal Aviation Administration’s Notice of Proposed Rulemaking on certification of aircraft for operation in supercooled large drop (SLD) icing conditions.
What does it cover? This session addresses “Why?”, “When?”, and “What Sensors?” will be on GOES- R, and presents examples of what to expect. If is a look.
Overview of Climate Observational Requirements for GOES-R Herbert Jacobowitz Short & Associates, Inc.
High impact weather nowcasting and short-range forecasting using advanced IR soundings Jun Li Cooperative Institute for Meteorological.
User Readiness Issues for GOES-R Jim Gurka Tim Schmit (NOAA/ NESDIS) Dick Reynolds (Short and Associates) 4 th GOES Users’ Conference May 2, 2006 Broomfield.
NOAA, May 2015 Coordination Group for Meteorological Satellites - CGMS Add CGMS agency logo here (in the slide master) Coordination Group for Meteorological.
Operational Use of Lightning Mapping Array Data Fifth Meeting of the Science Advisory Committee November, 2009 Geoffrey Stano, Dennis Buechler, and.
GOES Users’ Conference IV May 1-3, 2006 Broomfield, CO Prepared by Integrated Work Strategies, LLC 1 GOES USERS’ CONFERENCE IV: Discussion Highlights Numerical.
5th GOES Users’ Conference, New Orleans, January 2008 Geostationary satellites in a WMO perspective Jérôme Lafeuille WMO Space Programme World Meteorological.
NOAA, May 2014 Coordination Group for Meteorological Satellites - CGMS NOAA Activities toward Transitioning Mature R&D Missions to an Operational Status.
Band 14 (11um) Winds Low-Level >700 mb Mid-Level mb High-Level mb   NPP VIIRS Polar Winds Products The GOES-R AWG Derived Motion Winds.
WMO Satellite Data Dissemination Strategy CGMS-43-WMO-WP-09 Jérôme Lafeuille, Stephan Bojinski and Mikael Rattenborg World Meteorological Organization.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 STAR Enterprise Synthesis.
2011 Technical Advisory Committee (TAC) Guidance to the AWG.
JMA Report on Satellite-based Space Weather Activities in Japan
NESDIS-JMA AHI Collaboration
ET-SBO Report to ICT-IOS-9
User Preparation for new Satellite generations
Geostationary Sounders
WMO NWP Wokshop: Blending Breakout
Causes of improvements to NWP (1979 – 2009)
Presentation transcript:

2012 Independent Advisory Committee (IAC) Guidance to the SDEB

2012 Independent Advisory Committee (IAC) Guidance to the SDEB June 16, 2011 Independent Advisory Committee Members David Byers Brant Foote Jim Gleason John LeMarshall Paul Menzel Rolf Stuhlmann Alexander Trichtchenko Tom Vonder Haar John Zapotocnyc William Campbell

Introduction 3 GOES-R lightning mapper work has made very significant advances since the last meeting and real time application of lightning data is underway. Successful delivery of Baseline Products to the GOES-R Office and the delivery of the Option 2 (Future Capability) Products has been the result of outstanding scientific, technical and managerial work. All involved deserve commendation. Amongst the Option 2 Products for example the Low Cloud and Fog and SO2 detection products are needed for aviation safety and a Convective initiation product would be of clear assistance in severe weather prediction. It is important the benefits to be accrued from the Option 2 Products are not lost to the community. The recognition of the synergistic processing of Leo and Geo-data is an important step and the use of common software and an Enterprise approach is to be commended. Together with the use of models and data assimilation, the Polar and Geo-satellite applications and products are entering a new era.

General Findings (1) Scientists must remain close to their algorithms during operational implementation - their role in product production efficiency, validation, and evolution must be enabled by close communication / collaboration with the vendor of the ground system. However science developers should not be the principal evaluators of their own products. 4 Recommendation

General Findings (2) Preparations must be made for rapid software updates with scientist engagement as experience with real data reveals issues (data striping, rectification issues, geo diffraction effects, missing or saturated data …) as there will be situations when the algorithm change process is going from "broken to working " rather than from " adequate to better ". Update strategies to be used before Day 1 and after Day 1 need to be drafted. A pre- planned product improvement strategy must be developed for the program. Recommendation: Scientists need early access to the operational GOES-R C++ code and a process needs to be established for rapid day 1 and after changes. 5 Recommendation

General Findings (3) The Himawari 8 satellite will carry an Imager very similar to that on GOES-R. Recommendation: Scientist access to Himawari data and documentation of differences from GOES-R should be arranged by MOA so that experience with real ABI data can mitigate some issues before GOES-R launch. (4) Optimal GOES-R scanning and pre-processing scenarios still needs exploration (e.g. scan south to north for more timely NH data, de-striping before rectification). Recommendation: Undertake a study to demonstrate the difference in GOES Perfect Projection of data when destriped then rectified (information about image construction from scanning detector array needs to be made available). 6 Recommendation

General Findings (5) Effective CAL/VAL is essential to ensure high quality of input data for product generation and must be effectively performed in a timely manner. A special briefing from the CAL/VAL Team is being arranged. Field campaigns for validation of GOES-R sensor measurements and derived products must also be planned as soon as possible. The detailed Basis of Estimate should take into account other planned validation campaigns and assets as much as possible. Coordination with other programs requires early commitment. (6) Preparations for routine production of Option2 (Future Capability) Products (prior to operational production) appear to be underway as part of the Enterprise processing system. Recommendation: These should be sustained as much as possible so that affiliated scientists get an opportunity for evaluation with ABI data and the user community gets familiar with the product. 7 Recommendation

General Findings (7) Opportunity for LEO supplement / complement to GEO measurements for product generation has been enhanced greatly by the established of the Enterprise processing system. More efforts should be encouraged for combined products where LEO benchmarks are temporally continued with GEO measurements. An example could be LEO day-night band observations of fog can be extended into early morning with GEO visible composites. Caveats are that LEO and GEO must provide coherent depictions hence physics issues need attention (e.g. viewing angle differences, diffraction issues from GEO but not LEO...). For example, LEO vs GEO Vis/NIR algorithms must account for viewing angle and solar illumination differences characterizing the two systems. 8 Recommendation

General Findings (8) Better utilization of temporal continuity for product generation and QC is progressing. Some algorithms are now making good use of the temporal advantages offered by geostationary measurements; all algorithm developers should re-consider ways to make better use for consistency checks and / or QC. (9) Product validation needs better articulation / planning. Post- launch validation must include considerations for field experiments; leveraging and contributing to existing plans for NASA/DOE/NOAA field experiments must be undertaken. Recommendation: Post launch plans should be presented at next conference. 9 Recommendation

General Findings (10) Data assimilation of hourly radiances / products (eg. AMVs) in NWP models requires more attention (eg use of 4DVAR) - JCSDA engagement in this direction need to be strengthened. Moreover, use of satellite data over land (surface viewing as well as upper tropospheric / lower stratospheric sensitive measurements) in NWP needs to be enhanced. We need to be prepared for the generation and continuous assimilation of radiances hourly winds. Surface emissivity also needs to be updated in the CRTM. In general NWP readiness for GOES-R should continue to be a high priority activity. 10 Recommendation

General Findings (11) ABI does not offer a sounding product; ABI offers layer adjustments to a NWP model initial vertical profile estimate. This must be made clear in the product designation. Use of the word “sounding” is totally inappropriate and misleading. Utilization of the LEO high spectral resolution data rendering of moisture vertical and horizontal distributions needs to be encouraged. Recommendation: Regional forecasts and nowcasts necessary for a Weather Ready Nation will have to make better use of the information content from AIRS, CrIS, and IASI data; GPS data should also be included. Between LEO sounding coverage, GOES-R data should be used to monitor temporal profile (atmospheric stability, etc) changes. Recommendation: To pursue the missing continuous viewing essential for capturing the rapidly changing conditions that go with severe weather, the move to a GEO high spectral resolution IR sounder should receive higher priority within NOAA. A Transition Plan and Transition Survey should be completed as soon as possible. 11 Recommendation

General Findings (12) The Satellite Programs and the JCSDA should respond to arising needs for a) Data Assimilation Impact metrics tailored to Forecaster understanding including regional, high impact DA tests and b) all DA and other Impact studies and results should be respected ; but not widely communicated until they are reproduced by at least one independent study or method. (13) In relation to supporting operational forecasting, the value of VIIRS in AWIPS will be dependent on the timeliness of the data. Currently the plan is to use the IDPS at NESDIS as the source, however this will result in upwards of 2 hour latency from observation time. Recommendation: Use should be made of a network of DB sites from CONUS and OCONUS to reduce latency to within 30 minutes. 12 Recommendation

General Findings (14) In relation to AWIPS2 and product development, we often need different players with satellite experts, to bring radar and NWP knowledge and skills to the product development teams in order to achieve the vision of fused-integrated observations with NWP. Satellite developers don’t usually have understanding of radar and vice versa and we need to avoid new stovepipes replacing the old ones. In particular we need for this to come together for the Proving Ground. (15) Because of the importance of training, to the success of the GOES-R program, it is recommended that the application production team subject matter experts be involved in training. This may be done in a number of ways such as provision of material and in training the trainers. (A suggested contact may be Tony Mostek) 13 Recommendation

General Findings (16) In relation to space weather, NGDC needs to complete the plan for operationalising their products. As a first step Cal/Val will need to be addressed. For software development, NGDC should take advantage of software already developed a space weather applications (four example by the US Air Force) 14 Recommendation

Respiciens Est Aspiciens TC LAURENCE - Dec. 2009

Looking Down Is Looking Up TC LAURENCE - Dec. 2009