Future Internet Standardization: SC6

Slides:



Advertisements
Similar presentations
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Advertisements

Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. *See PowerPoint Lecture Outline for a complete, ready-made.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 29.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 112.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
1 Mata Architecture for the Future Network APAN2008 January Myung-Ki SHIN, ETRI
ETRI Electronics and Telecommunication Research Institute One-to-Many Video Delivery using Relayed Multicast Scheme Shin-Gak Kang, Juyoung Park Electronics.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Doc.: IEEE /0012r0 Submission January 2011 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmb Nov 2010 Agenda Date: Authors:
Doc.: IEEE /0953r0 Submission Sept 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Sept 2009 Date: Authors:
Doc.: IEEE /0953r1 Submission November 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Nov 2009 Date: Authors:
Doc.: _SEC_Motions_Jul06 Submission July Motion to SEC Motion by: LynchSeconded by: Agenda: 9.02 Date: 07/21/2006 Time: 3:20.
IEEE / January Interim Joint Opening Session #6 Jerry Upton- Chair Gang Wu – Procedural Vice Chair Eshwar Pittampalli.
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Disaster Risk Management - Status Review & Proposed Plan
Welcome! HL7 Child Health Work Group Meeting September 16, 2008 Dial In: (866) code:
GSC: Standardization Advancing Global Communications ITU-T Status Report on standardization of Networked RFID P.A. Probst/Chairman of ITU-T SG16 SOURCE:ITU-T.
GSC: Standardization Advancing Global Communications 9 Months and a meeting SOURCE:User Working Group Chairman TITLE:9 Months and a meeting AGENDA ITEM:3.
GSMP Local Community Network Global Agenda 28 Feb (Melanie Kudela.
INTERNATIONAL TELECOMMUNICATION UNION Document 27 – E TELECOMMUNICATION STANDARDIZATION SECTOR TSB Directors Consultation Meeting on IPTV standardization.
International Telecommunication Union Committed to connecting the world Tashkent, Uzbekistan, 3 April 2012 WTSA-12 Regional Preparatory Meeting Future.
Geneva, Switzerland, 17 October 2011 ITU Workshop on Service Delivery Platforms (SDP) for Telecommunication Ecosystems: from todays realities to requirements.
Geneva, Switzerland, 11 June 2012 Future Network: Mobility Tae-Wan You ETRI, Joint ITU-T SG 13 and ISO/JTC1/SC 6 Workshop on Future Networks.
Geneva, 15 May 2009 Status of NGN architecture related studies in ITU-T SG13 Olivier Le Grand WP 3/13 chairman France Telecom JOINT ITU-T SG13 - IEEE NGSON.
Geneva, Switzerland, 11 June 2012 Future Network: Naming and Addressing Hyun K. Kahng, ISO/IEC JTC1 SC6 Korea University, Joint ITU-T.
HUAWEI TECHNOLOGIES CO., LTD. HUAWEI TECHNOLOGIES Co., Ltd. Page 1 Business visions behind NGSON Li Li (Thomas Lee) Vice Director, Industry.
Fostering worldwide interoperabilityGeneva, July 2009 Lawful Interception and Data Retention Presenter: Mike Sharpe, VP ETSI ESP Source: Peter van.
Workshop on Multimedia Convergence (Geneva, March 2002) Presented by Fabio Bigi (Workshop Coordinator) 1.
Fostering worldwide interoperabilityGeneva, July 2009 Networked Vehicle in NGN Chaesub LEE, Yushi NAITO* ITU-T SG13 and SG16* Chairman Global Standards.
International Telecommunication Union TSAG Newbie Session, July 2004 TSAG Newbie Session TSAG Chairman
Network Virtualization and Service Awareness Properties of FNs
Session 10 Optical Switching and Equipment Session Coordinator: G. Bonaventura, Vice-Chairman, ITU-T SG 15 Associate Session Coordinator: M. Betts, Rapporteur,
Geneva, Switzerland, 11 June 2012 Standardization activities on Future Network in JTC 1/SC 6 Shin-Gak Kang Convenor, SC 6/WG 7 Joint.
0 - 0.
What Time Is It? Lesson by Mrs. Moody, FLE. M1M2 Students will develop an understanding of the measurement of time. a Tell time to the nearest hour and.
Break Time Remaining 10:00.
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
15. Oktober Oktober Oktober 2012.
Jeju, 13 – 16 May 2013Standards for Shared ICT Standard harmonization toward FN including NGN Chae Sub LEE, TTA Document No: GSC17-GTSC10-05 Source: TTA.
We are learning how to read the 24 hour clock
DOCUMENT #:GSC15-CL-06 FOR:Presentation SOURCE:Admin WG Chair AGENDA ITEM:Closing; 2.5 CONTACT(S):Jim MacFie
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GRSC-9 Summary Report Cindy Cook, GRSC-9 Chair, ISACC Document No: GSC16-CL-03 Source: GRSC-9 Contact:
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GTSC-9 Summary Glenn Parsons, GTSC-9 Chair, ISACC Document No: GSC16-CL-04 Source: GTSC-9 Contact:
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC-16 Closing Plenary Summary Report Jim MacFie, Chair Ed Juskevicius, Rapporteur Document No: GSC16-CL-39r1.
Submission doc.: IEEE 802-EC-13/0033r0 July 2013 Jon Rosdahl, CSRSlide 1 ExSec Agenda Items July 2013 Plenary Date: Authors:
Jeju, 13 – 16 May 2013Standards for Shared ICT Developments of future networks CHAESUB LEE, Chairman of ITU-T SG13 Document No: GSC17-GTSC10-06 Source:
Jeju, 13 – 16 May 2013Standards for Shared ICT GSC-17 Closing Plenary Summary Report KyuJin Wee, Chair Cloe HeeSung Lim, Rapporteur Document No: GSC17-CL-37.
Jeju, 13 – 16 May 2013Standards for Shared ICT GTSC-10 Summary Kishik Park, Ph.D. GTSC-10 Chair, TTA Document No: GSC17-CL-04r1 Source: GTSC-10 Contact:
Clock will move after 1 minute
NI Executive Budget 2010 Pre-Consultation. Outline Background and Context UK Fiscal Position Implications for NI Budget Way Forward Key Questions.
Summary of Results Study Period ITU-T Study Group 11 Signalling requirements, protocols and Test specifications Wei Feng.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
Future Network Standardization Activities in ISO/IEC JTC1/SC6
Future Network Proposal for Future Network Standardization in ITU-T SG13 14th CJK NGN WG December HyoungJun KIM, ETRI
Global Collaboration on Future Network Standardization
Global Collaboration on Future Network Standardization
Global Collaboration on Future Network Standardization
Presentation transcript:

Future Internet Standardization: SC6

Chungnam University 2 JTC1/SC6 Ad Hoc Mtg Agenda for the Ad Hoc Meeting on Future Networks Date: (Wed.) ~ (Thur.) Venue: AFNOR, Paris The meeting was chaired by Mr. Kang, Convenor of JTC1/SC6/WG7 9 documents were presented All meeting documents can be accessed from the relevant SC6 web page, 17 participants were present to the meeting

Chungnam University 3 Presentations 09:15~09:30 Opening: Shin-Gak Kang (SC6/WG7 Convenor) SC6-FN-Paris-10: Ad Hoc Meeting on Future Networks – Background and Objective 09:30~10:30 Session A: Future Network Research Activities (I) SC6-FN-Paris-09: Future Internet standardization (Dae Young Kim/SC6 Chair) SC6-FN-Paris-02: Auto-adaptive functions of network (Christian JACQUENET/France Telecom) SC6-FN-Paris-03: Emerging Wireless Sensor Technologies and the Future Network (Myung-Ki Shin/ETRI)

Chungnam University 4 Presentations (cont'd) 14:00~15:30 Session B: Future Network Research Activities (II) SC6-FN-Paris-06: Running Federation on the Internet (Hongbo Sun/Tsinghua University) SC6-FN-Paris-07: IPv9 - The common ideal for human being (Jianping Xie/ Shanghai Decimal System Network Information Technology) SC6-FN-Paris-04: A new standardization initiative on Future Network and Ubiquitous Sensor Network (Eunsook Kim/ETRI) SC6-FN-Paris-08: Future Networks - Connecting Objects and People to the Services of the Global Village (Reinhard Meindl/ECMA)

Chungnam University 5 Presentations (cont'd) 16:00~17:00 Session C: Future Network Research Activities (IV) SC6-FN-Paris-05: Current Status and Future of ITU-T SG13 (Chae Sub Lee/Vice-Chairman of ITU-T SG13) SC6-FN-Paris-12: Future Internet in Korea (Younghee Lee/ICU) 06 Sept (Thur.) 09:30~12:00 Session D: Standardization Direction of Future Network (Shin-Gak Kang) Standardization Issues of Future Network Collaboration among the Standard Bodies Future Directions within JTC1/SC6

Chungnam University 6 Meeting Outcome Clarification of Terminology Clarification of Terminology Future Network Future Network is the Network of the Future No specific network technologies are pre-assumed Long-term Revolutionary Approach NGN of ITU-T Packet based Technologies but assuming IP-based Network Architecture Evolution from the current IP-based Network Short/Mid-term Evolutionary Approach Work on Future Network is an anticipation work. This work is distinct from NGN and will not compromise nor endanger currently operated networks

Chungnam University 7 Meeting Outcome (cont'd) Related work discussed: Self Organizing Network, Overlay Network, Configurable Network, Active Network, Context-Aware Network, etc. Some of the important directions of Future Network Architecture Highly Dynamic, Configurable Network Architecture based on Application Context Highly Distributed Network Architecture Revolutionary approach must be considered for the Future Network Need not dependent on the current emerging technologies and solutions Backward compatibility may not required

Chungnam University 8 Documents Milestone Step 1: Problem Statement Step 2: Requirements Step 3: Gap Analysis; define what are the requirements that are not addressed in SDOs Step 4: Framework Step 5: Architecture Step 6: Individual technologies

Chungnam University 9 Action Items Call for Contributions (due on 31 Jan., 2008): Problem Statement Requirements Gap Analysis; what are the requirements not addressed in SDOs WG7 Meeting on Future Network: 6 April, 2008, Geneva Review Call for Contributions Formal Discussion about possible new projects on Future Network within JTC1/SC6 meeting in 7-11 April 2008, Geneva nitiation of NP Ballot within JTC1/SC6 Start New Work on Future Network from the end of 2008 or early 2009 based on the NP ballot results Inspired by JTC1/SC6, ITU-T also had discussions on Future Network Hopefully be adopted for the Next Study Period to align with JTC1/SC6