1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.

Slides:



Advertisements
Similar presentations
Course Material Overview of Process Safety Compliance with Standards
Advertisements

Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Review Questions Business 205
Internal Audit Documentation and Working Papers
Information Risk Management Key Component for HIPAA Security Compliance Ann Geyer Tunitas Group
1 Proposed Rule to Protect Food Against Intentional Adulteration
Contractor Management and ISO 14001:2004
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
SAFETY, HEALTH, AND ENVIRONMENTAL AUDITING
Design, Implementation and Maintenance
Codex Guidelines for the Application of HACCP
Fundamentals of ISO.
Information Security Compliance System Owner Training Richard Gadsden Information Security Office Office of the CIO – Information Services Sharon Knowles.
International Auditing and Assurance Standards Board The Clarified ISAs, Audit Documentation, and SME Audit Considerations ISA Implementation Support Module.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
1 European Conference on Training Strategies Kieran Cox -NSAI Education & Promotion-
Ship Recycling Facility Management System IMO Guideline A.962
LSST Camera Performance and Safety Assurance Plan and Safety Overview Joe Kenny Camera Safety Manager LSST Safety Council Review 18 August 2015.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Occupational Health and Safety
Basics of OHSAS Occupational Health & Safety Management System
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Visit us at E mail: Tele: www.globalmanagergroup.com.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
ISO OPERATIONAL CONTROL
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Hazards Identification and Risk Assessment
Contract Training Class I
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Final Rule for Preventive Controls for Human Food September 16, THE FUTURE IS NOW 1.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
J. Levine5/21/02 NCSX ENVIRONMENT, SAFETY & HEALTH (ES&H) NCSX Conceptual Design Review (CDR) May 21, 2002.
12/2/2004Module 2A1 The NCSX Engineering Web – An Overview Part I Work Planning, Project Files, Management Plans and Procedures.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Key Terms Business Continuity Plan (BCP) – A comprehensive written plan to maintain or resume business in the event of a disruption Critical Process –
Final Rule for Preventive Controls for Animal Food 1 THE FUTURE IS NOW.
NCSX Data Management Plan Peer Review Bob Simmons March 31, 2003.
ISO DOCUMENT CONTROL. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to: 
11/23/2004Module # 11 The NCSX Project Web An Indoctrination and Overview.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
How the NCSX Project Does Business
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
NCSX Document and Records Plan Peer Review Bob Simmons March 14, 2003.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
OHSAS Occupational health and safety management system.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.

Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Accelerator Readiness Review October 31, 2006
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Engineering Processes
Management of Change Report Errors to Management.
How to conduct Effective Stage-1 Audit
DOE Review of the LCLS Project October 2006
Presentation transcript:

1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes

1/18/2005Module 42 Purpose Provides review of how the NCSX Project does business This module will focus on: Work Planning Processes on NCSX, including: Work Plans Jobs/WAFs WP to WAF mapping Later modules to will address other parts of how the NCSX Project will do business Modules 1 & 2 are intended to provide overview of the NCSX Project Web and the NCSX Engineering Web Modules 4-10 will focus other aspects of how the NCSX Project will do business The NCSX Engineering Web is, to a major extent, the electronic NCSX filing system Exceptions are the models and drawings contained in the Pro/INTERALINK data base and the hard copy supplier and other PPPL documents stored in the PPPL Operations Center However – bulk of files stored electronically on this web

1/18/2005Module 43 Work Planning Work Plans Per ENG-032 Jobs (WAFs) Essentially P3 resource loaded schedules Provides authorization to start work WP to WAF Mapping Ensures that every WP has at least one job/WAF associated with it

1/18/2005Module 44 PPPL Work Planning Processes Defined by PPPL Engineering Procedure ENG-032 Applicable to all activities at PPPL involving physical changes to engineering, facilities, control computing, and technical infrastructure and equipment or involving collaborations for others NCSX Project will follow ENG-032 Purpose of ENG-032, Work Planning Procedure, is to: Establish criteria by which work planning will proceed Integrates safety into work planning Organizes the systematic avenues by which changes will be planned, prepared, reviewed, implemented, and documented Key decision maker in this process is the Responsible Line Manager (RLM) List of RLMs found at: RLM will approve Work Plans (WPs) As required, the PPPL Deputy Director shall convene a Work Planning Review Board to review WPs in process to ascertain whether they comply with the graded approach guidelines contained in ENG-032

1/18/2005Module 45 When is a WP Required? RLM, in consultation with the Cognizant Engineer (usually Job Manager), will determine whether or not a WP is required Graded approach provides options that balance priorities, identify ES&H requirements, ensures proper controls, and provide an auditable package upon which to base authorization Graded approach permits alternative procedure to be utilized vs. WP to plan work and mitigate hazards, but the default it to require a WP Regardless to graded approach, a WP is always required if the change: Is large or complex or represents a new installation into a usable space Has a significant ES&H impact Involves Tritium or other radioactive contaminated or activated equipment Impact multiple projects, systems, or groups Changes the scope or intent of the original design

1/18/2005Module 46 Guides to Preparing a WP Work Planning Form is electronic Will need to authenticate to get to this web page: Electronic submittal and signatures PROC-004 provides good guidelines to assist in preparing WP (especially for PDR or FDR) WP leads to preparation of a Job in the Primavera (P3) database

1/18/2005Module 47 What Does a WP Achieve? Systematic way to plan the anticipated requirements of a job Defines the scope of the job Performs Hazard Analysis Factors into planning all potential environmental, safety, and health issues Establishes procedural and testing requirements Establishes clear approval indicating ownership of the work

1/18/2005Module 48 PPPL Work Planning Web Page Useful links for using PPPL WP System Sample WP

1/18/2005Module 49 NCSX Design Review Process Design reviews are performed to clarify and verify compliance with functional, project, ES&H, and quality requirements NCSX Project will follow ENG-033 Peer Reviews, Conceptual Design Reviews (CDRs), Preliminary Design Reviews (PDRs), and Final Design Reviews (FDRs) will be conducted and follow requirements of ENG-033 – Design Review Reports, CHITs, etc. In general, all CHITs should be resolved prior to the next design review, and in some instances much sooner Major difference is that on NCSX, all the design review documentation will be stored in an electronic format vs. in hard copy in the Ops Center

1/18/2005Module 410 Guidelines for Conducting Design Review Both ENG-033 and PROC-004 contain design review objectives and design review input documentation The input documentation should be completed and provided to the Design Review Board prior to the review Until all prerequisite design review documentation is completed, the review will NOT be scheduled or held

1/18/2005Module 411 A Process for Electronically Documenting Design Reviews has been Implemented

1/18/2005Module 412 NCSX CHIT/Audit Tracking Log

1/18/2005Module 413 Summary This training module has focused on the work planning and design review processes The NCSX Project is committed to following the requirements and processes contained in: PPPL ENG-032 – Work Planning PPPL ENG-033 – Design Verification (as it pertains to Design Reviews) NCSX PROC-004 augments and supplements ENG-032 and ENG- 033 No exceptions or modifications from compliance with ENG-032 No exceptions or modifications from compliance with ENG-033 with the exception that NCSX design review records will be stored electronically on the NCSX Engineering Web vs. in the Ops Center