Introduction: Throughout history and especially in today’s global economy, companies and agencies are constantly looking for ways to do more and more with.

Slides:



Advertisements
Similar presentations
Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
Advertisements

Understanding 5S.
5S training Office Environments.
5S BASIC TRAINING What is 5S and why do we want to do it?
 Sort the necessary from the unnecessary  Use the Red-Tag technique to highlight unneeded items  Manage all removed items Separate the essential from.
Going Lean Can it work for the Medical University? Jennifer Hooks MBA Manager, Performance Improvement Six Sigma Master Black Belt Lean Sensei.
An introduction to Lean tools and methodologies
J-1 Next Steps Jordan Dentz. J-2 Assignments 1. Establish core continuous improvement team (April 21) 2. Current state value stream map (draft April 28;
Supplier Development Kaizen Implementation Kit
Every patient matters STAFF INVOLVEMENT USING LEAN IMPROVEMENT.
Lean Accounting and Value Stream Costing
Introduction to 6S.
1 © 2005 Superfactory™. All Rights Reserved. Lean Office - 5S and Visual Controls Superfactory Excellence Program™
CONTINUOUS IMPROVEMENT PROGRAM
Thomas A. Crane – 2009 Proactive Quality Management System 1 Proactive Quality Management System “A goal without a plan is just a wish.” Thomas A. Crane.
5s (Workplace Organization) Implementation
Introduction to 5S. What is 5S? An easy definition is: Finding a place for everything and putting everything in its place. 5S is also the foundation for.
 There are five primary 5S phases: 1.Sort. 2.Straighten. 3.Shine. 4.Standardize. 5.Sustain. The 5 S's Kamalnathan, MIM.
Just-In-Time Manufacturing David Comita Arielle Herold Jaslyn Moore Shanelle Williamson.
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
Vehicle and Equipment Maintenance Tracking & Cost Program Designed for the Green and Construction Industries For Companies of Any Size EQUIP TRACK.
Visual Workplace - A Prerequisite To Becoming World Class
5S Improving safety & efficiency
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
Chapter 4 5S.
BUILD WITH US. ™ 5S – The Foundation for Improvements Safety the “6 th ” S.
A Workplace Organization Method
LEAN Roger Jones Joe Novello. Introductions Historical Background Baldridge Quality Framework.
Intro to Business, 7e © 2009 South-Western, Cengage Learning SLIDE CHAPTER Types of Production Production Planning Planning.
Visual Management Quick Review
Lean Manufacturing Visual Systems XYZ Company.
Total Productive Maintenance (TPM)
5S REFRESHER What is 5S and why do we want to do it? Six Sigma Simplicity.
Risk Management Services OVERVIEW of FY2013 WC Injury Review Memory Toolbox: A Review of Loss Control Acronyms.
1  Established in 1964  Located in Escondido, Ca Company Vision: To be the most dependable, diversified and efficient job shop, dedicated to unbeatable.
5S at New Belgium Brewing Company
5-S Quick Learning Module Industrial Solutions, Inc.
From Concept to Reality. F & B Farms and Nursery Kaizen event June 2011 Potting Line Process Before conditions: Inconsistent work – particularly on machine.
The Decision Maker. Managing a Profitable Company.
Safety Series Safety Leadership Series 5 S + 1 Safety Makes the Difference!!!
Implementation of Lean at Rheem Manufacturing
Visual Management Visual Management.
Lean Manufacturing. Why do this? Lets look at jobs on Monster.com that refer to Lean - ployer/?WT_srch=1&s_kwcid=job%20ope.
6 S System The Visual Workplace Directorate of Training and Education
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Using 5S to Start Your Lean Journey Presented by: Brian D Krichbaum Process Coaching Incorporated.
Version 3.0.
BE-TL1-001-DRAFT-5S 5S Business Excellence DRAFT October 5, 2007.
1 Lean Manufacturing: An overview Presented By: Laura S. Brown Industrial and Systems Engineering Senior Capstone Mercer University School of Engineering.
Lean production, Kaizen & 5S K.B.Gopalam Aura Leadership Foundation Hyderabad.
5S Workplace Organization Northland Community & Technical College Presented by: Tim Bergerson, Robbi Brateng, Mitch Ostrom, Jesse Adkins, Bob Gooden,
May 2016 Safety Focus Extra. What is 5S and why do we want to do it? Simple but highly effective set of techniques that help organize and remove excess.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
5S WORKPLACE IMPROVEMENT Central Stores & Freight Room.
ERP vendor perspective
Best Practices Consortium
QC,QA and QSE, huh? What does it all mean?.
5S workplace organisation
The University of Jordan Mechatronics Engineering Department
5S BASIC TRAINING What is 5S and why do we want to do it?
5S Burr Oak Tool, Inc. 5S PROGRAM Workplace Organization SUSTAIN SORT
Office 5S “S” by “S” Implementation guide Site clear = Clearing Up
IMPLEMENTATION OF EIGHT PILLARS THE TOTAL PRODUCTIVE MAINTENANCE AT WATER SUPPLY COMPANY Iswandi Idris Ibrahim Ruri Aditya Sari.
Continuous Improvement Coordinator
Industrial Engineering Department, Dokuz Eylul University, Turkey
5S BASIC TRAINING What is 5S and why do we want to do it?
IDM 355 Topics for Lean Quiz
5S BASIC TRAINING What is 5S and why do we want to do it?
July 2019 Safety Focus Extra
Presentation transcript:

Introduction: Throughout history and especially in today’s global economy, companies and agencies are constantly looking for ways to do more and more with less and less.

 Lean: A shortened name for Lean/Flow Technology. Lean is a tool that management utilizes to decrease time between customer order and shipment of product.

 Why would the UW-Stout Physical Plant be a good candidate for Lean?  Lean can be used anywhere, any company, any agency.  It gives the opportunity to owners and employees, managers and customers a chance to evaluate their processes and the tools to make changes / improvements.  Yes. Lean is perfect for the UW-Stout Physical Plant

 Lean is a subject with many sub parts. UW-Stout Physical Plant focuses on; Production efficiencies / value stream mapping 5S Inventory reduction Continuous improvement

 To begin the process of gaining efficiencies you must first define your product. Meaning what are your customers willing to pay for. Materials, labor and expertise involved in changing and maintaining campus. It was determined that the Work Order Process was the best place to begin. Remember to involve customers and employees.

 Value Stream Mapping - Before

 Value Stream Mapping – After

 What did we gain? L/T Lead Time, P/T Production Time Administration Support for Skilled Trades Past State L/T: 2.15 days P/T: 27 minutes Current State L/T:.5 days P/T: 18 minutes Data Collection and Charge Backs Past State L/T: days P/T: 17.7 minutes Current State L/T: 7.56 days P/T: 8.5 minutes

 Electronic handheld devices used to provide information to the employee. Equipment history Daily labor sheets Work orders Area maps Part inventories  Electronic ordering in process Paperless systems Better tracking and information retention

 The 5S approach is a relatively simple, but powerful, method for shop floor improvement.  The 5S’s Sort Set in Order Shine Standardize Sustain

 Removal of everything that is not directly needed to do a job. Defective or excess quantities of small parts and inventory Outdated or broken tools and gear Old rags and other cleaning supplies Electrical equipment with broken cords Outdated memos, notices, and schedules

 Everything needed at the operation is arranged and labeled so that objects can be found as well as put away. Most people understand this but it is a time consuming step that is often rushed.

 Concentrates on keeping things clean and tidy. People enjoy working in a clean environment and are more efficient. Management must understand the importance on supporting “clean up time”.

 This S concentrates on the processes of the first 3 S’s Assign personnel the job responsibilities of the first three areas. Integrate these new job responsibilities into the daily work routine. Audit the previous two steps.

 It means to make a habit of properly maintaining correct procedures over time.  Sustain is the most difficult step for most groups. They have the drive for the first 4 steps but over time they grow uninterested.  If Sustain is successful, the company is much more able to implement changes.

 Current Project North storage  Future Projects Craft workers shop area Mechanical rooms Vehicles

After

After

After

 Working with Grainger Industries to accomplish inventory reduction. We are not experts in these systems so we are working with someone who is. We hope to reduce inventories of unneeded parts and replace them with long lead time items that are critical to the function of campus.

 Action Item Lists We meet weekly and go over the current state of projects we are working on.  Lean thinking expanding into other areas of the department. Employees more able and willing to change, if it is for the better.  Continuous Improvement is a mind set that must exist in everyone if you are to succeed.

Thank you.