MMO: Payload AIV MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter AIV (Assembly, Integration, Verification) for.

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

ATHENA WFI Meeting Garching, January 28, 2014 Markus Plattner.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Folie 1 Service Oriented Architecture - Prototyping study - DLR/GSOC Author: S.Gully.
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
Development plan and quality plan for your Project
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Effective Methods for Software and Systems Integration
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Agenda Teams Responsibilities Timeline Homework and next steps.
Aerospace Testing 2006 A Centralized Approach To Ground Support Software To Reduce Technical Risk and Overall Mission Costs Thomas Hauck GSE Software,
Current Status of Software Design for MMO-PWI Y. Kasahara, T. Imachi (Kanazawa Univ.) and Y. Kasaba (ISAS)
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
Distributed Software Development QR Marks The Spot Alpha Prototype Rebeka Belavić, Marko Basuga.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
Chris Taylor TEC-EDS 1 SOIS Prototyping Activities CCSDS SOIS Berlin 2008 C. Taylor ESA- ESTEC.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
1 Thomas HottTechnical Reviews Contents, 2 nd CDE-WS, 12 th & 13 th May 09 XFEL Technical Coordinator Technical Reviews – Contents – 1.
BepiColombo/MMO: PWI/WPT-S PWI Kanazawa Meeting [Mar 2006] WPT-S MEFISTO-S [WPT: Team members] Lead Co-IY. Kasaba (JAXA) ManufacturerNIPPI [PWI] K. Ishisaka,
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
Agenda Thanks! Schedule and Coordination Objectives Review Timeline Homework and next steps – Scope Team’s Work (Discussions) – Stakeholder Management.
BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter MDP (Mission Data Processor) for BepiColombo.
MMO-SWG #3[Mar ] PA (Safety & Mission Assurance) Activities for MMO ➢ MMO PA Plan was developed, and it will be distributed to MMO Contractors &
Distributed Software Development QR Marks The Spot Beta Prototype Vadym Khatsanovskyy, Nicolas Jacquemoud.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
Paul Butterworth Management Technology Architect
JAXA’s Exploration of the Solar System Beyond the Moon and Mars.
MMO-SWG #3[Mar ] BepiColombo Project & MMO Science Schedule H. Hayakawa, Y. Kasaba, M. Kato, T Mukai, and JAXA BepiColombo Project.
MPPE. (1) Progress from the Sep design meeting 18 Oct 2005(Tue)4 th MPPE ISAS/JAXA 18 Oct 2005(Tue)MEA team ISAS/JAXA 19 Oct.
February 5, 2009 Technical Advisory Committee Meeting Texas Nodal Program Implementation: Program Update Trip Doggett.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
BepiColombo Data Handling and the Science Archive Based on the presentation in Bepi-SWT #1 in April 2005 ESTEC) [J. Zender (ESTEC), Y. Kasaba (ISAS)]
ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused.
Page 1 BepiColombo MMO Status Update For HEWG2014, June 2014.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
Maite Barroso - 10/05/01 - n° 1 WP4 PM9 Deliverable Presentation: Interim Installation System Configuration Management Prototype
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
SE513 Software Quality Assurance Lecture10: Documentation and Quality Records Control Galin, SQA from Theory to Education Limited.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
IFS310: Module 9 Systems Design - Procurement Phase - Software Design.
Agenda Thanks! Schedule and Coordination Objectives Review Timeline Homework and next steps – Scope Team’s Work (Discussions) – Stakeholder Management.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
-1- The fundamental function checks of EWO, WPT-Pre, and IPD and their I/F checks will be done inside the MHI. Function and I/F checks of the LF-SC/DB-SC.
Installation and Commisioning SE view point Romuald Duperrier ESS SE manager.
SOIS Prototyping Activities
SPF MAG Quarterly Report – Feb 2015
I&T&C Organization Chart
Double Star Progress Meeting #3 Beijing 2 July, 2002.
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
EDR HLRF Work Packages Draft Summary
2K CB FDR Overview:  Agenda, Charge, Review Process
Lockheed Martin Canada’s SMB Mentoring Program
Presentation transcript:

MMO: Payload AIV MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter AIV (Assembly, Integration, Verification) for BepiColombo MMO Payoads Y. Kasaba, T. Takashima, H. Hayakawa (JAXA/BepiColombo Project Office)

MMO: Payload AIV MMO-SWG #3 [March 2006] -2- Implementation phase [old Ph-B/C/D] Payload Selection Definition phase [old Ph-A/B] Launch B PM (Ph.B) ESA JAXA both ESA JAXA both Technical study Pre-PM1 MMO&MCS STM test JAXA (ISAS) ESA (Calendar year) PDR E Integrated Test & AIV FM(Ph.C/D) Pre-PM2 PRR B PRR=Preliminary requirements Rev. PDR=Preliminary Definition Rev. CDR=Critical Design Rev. QR=Qualification Rev. MMO-FM at ESTEC (by ESA plan) MMO-STM at ESTEC (by ESA plan) ITT MMO-STM M MMO-EM B MMO-FM B CDR E MIC/EIC B-6B Sub-Env test B-9E QR E AIV B E E STM test Component Dummy Mercury orbit ~ 2years Now!! RFP AO Overall Schedule (Mar 2006) Is it OK? Install of STM2008.8E Install of FM2010.3B Env. Test2010.7B-9E “EM” & “Sub-system level reviews” can be negotiable each by each. Is it OK? Install of STM2008.8E Install of FM2010.3B Env. Test2010.7B-9E “EM” & “Sub-system level reviews” can be negotiable each by each.

MMO: Payload AIV MMO-SWG #3 [March 2006] -3- STM Schedule (Mar 2006) Payload STM: submission to System2008 8E MPPE, MSASI (Hood only?), WPT-S, MEFISTO-S, MAST Payload STM test should be done by 2008 Aug. MMO-STM test in ISAS will be end in 2009 May.

MMO: Payload AIV MMO-SWG #3 [March 2006] -4- EM Schedule (Mar 2006) Payload EM integration test schedule is TBD PWI: from 2007 Oct.?? MGF:from 2008 Feb.?? Others:from 2008 May??

MMO: Payload AIV MMO-SWG #3 [March 2006] -5- Software Schedule (Mar 2006) Software development does not have major milestones. Parts related to EM test will be synchronized to the System.

MMO: Payload AIV MMO-SWG #3 [March 2006] -6- FM Schedule (Mar 2006) Payload FM: submission to System2010 March Payload FM: Environment test2010 7B-9E There might be no chance to remove payloads at ESTEC.

MMO: Payload AIV MMO-SWG #3 [March 2006] -7- EM Schedule for MDP (Mar 2006) Integration test plan for MDP-2 (& MDP-1) with PWI & MGF Details will be discussed in PWI local meeting in Kanazawa in this week. ~Plan: 13 weeks ~ (FM: less) MDP/Instrument tests by “Emulators with SpW” ? MDP/Instrument tests by “Emulators with SpW” ?

MMO: Payload AIV MMO-SWG #3 [March 2006] -8- Action Items in 2006FY Definition of the Schedule, Test location, and Responsibility/Members Definition of the procurement items from each team to each team Definition of the test itemsin Component-level test in MDP-level test in System-level test Definition of the Test environmentin Component-level test in MDP-level test in System-level test It will be defined as “MMO Payload Test Plan” (Draft version is in I-IRD etc.) by JAXA/BepiColombo Project Office. Please discuss in each team, and clarify your Action Items & Request to System / Other teams in CDD and/or Progress report.

MMO: Payload AIV MMO-SWG #3 [March 2006] -9- SensorSpaceCube etc. Signal Generator Spacewire PC Ether etc. GPIB etc. EM/FM: Test Configuration Concept System level ISAS (/ ESTEC / Launch site) SensorMDP / MDP emulator Signal Generator Spacewire PC Ether etc. GPIB etc. MDP level ISAS / MHI etc. SpaceCube etc. Spacewire SensorMDP > DMC Signal Generator Spacewire PC Ether etc. GPIB etc. TM/TC Ground System IEEE1553B? (TLM only!) Board/unit level each institution

MMO: Payload AIV MMO-SWG #3 [March 2006] -10- SpaceCube: present status SpaceWire Analyzer on SpaceCube –Under development, Finished until October (distribution or purchase : after Oct. with soft) –Analyzer will be distributed by MMO-project with SpaceCube GSE –Using SpaceCube with SpaceWire Analyzer –Middle ware (User I/F) will be define next year SpaceWire Analyzer on SpaceCube PC RMAP packet content TLMCOM Sensor with SpW I/F SpW RS232 RMAP HOST RMAP Target

MMO: Payload AIV MMO-SWG #3 [March 2006] -11- Space-Cube (TBC) for GSE Mini-PC with VGA, USB, Ether, CF-I/F SpW port : 3 ports OS : T-kernel (TRON) Language : C (C++ ?) Development : Cross-Compiler on Linux SpW I/F : special API for SpW I/F prepared SpW user program : Sample program that is to read and wite SpW packet attached. If necessary, user can develop programs using APIs for SpW.