Main components of an action Plan Frezghi Irénée Martijn.

Slides:



Advertisements
Similar presentations
19-20 September 2013, IBGE, Rio de Janeiro, Brazil
Advertisements

DROUGHT MONITORING CENTRE - NAIROBI WHAT COULD BE DONE ON DROUGHT WITHIN ISDR PLATFORM?
WATER FOR THE 21 st CENTURY ECONOMY AND ENVIRONMENT Santa Ana River Watershed Conference April 11, 2013.
Towards More Sustainable and Market-based Payment for Ecosystem Services A Pilot Project in Lijiang, China Lu Zhi.
AIACC Regional Study AS07 Southeast Asia Regional Vulnerability to Changing Water Resources and Extreme Hydrological due to Climate Change.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
PP 7.1 THE ROLE OF BASIN PLANNERS. The Roles of Basin planners Basin planners have three main roles:  Bringing together knowledge  Identifying stakeholders;
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
1 Preparing Washington for a Changing Climate An Integrated Climate Change Response Strategy Department of Ecology Hedia Adelsman, Executive Policy Advisor.
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
Eduardo Mondlane UniversityInstitute for Water Resource, Rhodes University PhD Proposal-Progress Agostinho Vilanculos Supervisors: - Prof. Denis Hughes.
WATER ISSUES IN THE EASTERN EUROPE:
Introduction to the Session 6 - Theme 4 – on “Water Resources Management and Governance”
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
America’s Water Upmanu Lall water.columbia.edu.
IWRM as a Tool for Adaptation to Climate Change
Approaches and Mainstreaming of Ecosystem-based Adaptation in Europe International workshop “Mainstreaming an ecosystem based approach to climate change.
1 The 14 th Meeting of the ASEAN Working Group on Water Resources Management (AWGWRM) Increasing Long Term Awareness Knowledge and Community Participation.
There are a number of different ways of managing transboundary river systems, and different institutional responses to these challenges.
PP 5.1: IWRM Planning Framework
Characterization Report Module 2: Water Budget, Pressures and Impacts, Significant Water Management Issues, Monitoring, Characterization Report Characterization.
Watershed Assessment and Planning. Review Watershed Hydrology Watershed Hydrology Watershed Characteristics and Processes Watershed Characteristics and.
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
E NVIRONMENTAL STATISTICS STATISTICS DIVISION Regional Strategy for the implementation of SEEA: key features and reflections for the Caribbean Regional.
Dr Richard Johnson, Mountain Environments, UK.  Lead Partner: Germany: Research Institute of Forest Ecology and Forestry  Partner countries: Germany,
1 Influence of Main River Basin District Plans on Environment Czech University of Life Sciences Faculty of Environmental Sciences Miroslav Martis,Vladimir.
TOPIC 3.2 ENSURING ADEQUATED WATER RESOURCES AND STORAGE INFRASTRUCTURE TO MEET AGRICULTURAL, ENERGY AND URBAN NEEDS.
Approaches and Mainstreaming of Ecosystem-based Adaptation in Europe International workshop “Mainstreaming an ecosystem based approach to climate change.
FP7 /1 EUROPEAN COMMISSION - Research DG - December 2006 Building a Europe of Knowledge Towards the Seventh Framework Programme Marta Moren Abat,
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Flash Floods in a changing context: Importance of the impacts induced by a changing environment.
Basin management plan Case Sibalom watershed, Philippines Marion Hermus Cornelia Rudolph Lennart Swinkels.
River Basin Management in Southern Africa Barbara Schreiner.
Opportunities and Challenges of Water Resources Management in Lao PDR
Global public policy network on water management Water and Climate Change Adaptation – Key Messages for COP-15 gppn.
Monitoring Programme. What is monitoring? Environmental monitoring is the systematic observation, measurement and calculation of the condition of the.
Ecologic.de 16-Jun-03Testing the WATECO-Guidance: Corfu Pilot Project Testing the WATECO-Guidance: the Corfu Pilot Project Prepared by: I.G.M.E. / Ministry.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Kettle River Watershed Management Plan Stakeholder Advisory Group Meeting #3 – July 19, 2012.
PROJECT PLAN: The Nature Conservancy Corps of Engineers ICPRB Presentation Potomac Watershed Roundtable January 9, 2009.
Group Work IWRM Integrated River Basin Management.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
INTRODUCTION 2.EUROPEAN UNION HARMONIZATION PROCESS 3.LEGISLATION STUDIES 4.ADMINISTRATIVE STRUCTURE 5.IMPLEMENTATION PROCESS.
RESERVE DETERMINATION STUDIES FOR SELECTED SURFACE WATER, GROUNDWATER, ESTUARIES AND WETLANDS IN THE GOURITZ WMA – PSC MEETING NO 1 OVERVIEW OF THE RESERVE.
AF 42 1 IMPACTS OF CLIMATE CHANGE, VULNERABILITY AND ADAPTATION CAPACITY IN THE LIMPOPO BASIN OF SEMI-ARID LAND SOUTHERN AFRICA: THE CASE OF EASTERN BOTSWANA.
International Network Of Basin Organizations topic 3.1: “Basin Management and Transboundary Cooperation”. Operational tools  Long term basin management.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Climate Change Impacts on Water Resources and Human Livelihoods in the Coastal Zones of Small Island Developing States (CASCADE) Project Stakeholder Panel.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
SOCOPSE Final Conference Maastricht, June 2009 Prof.Dr.Damià Barceló, Paula Guerra, Dr. Ethel Eljarrat IDAEA-CSIC, Spain. WP5: Case Studies Ter and Llobregat.
THE NATIONAL CLIMATE CHANGE RESPONSE POLICY NATIONAL CLIMATE CHANGE RESPONSE POLICY CLIMATE CHANGE ADAPTATION The relevance of Adapting to Climate Change:
Regions Adapt Webinar «Water resources and management working group» 8 April 2016.
Under 4.7 Habitat of the MTDS, Working Group 2 deals with:
Model Summary Fred Lauer
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
The 1st Draft of Thailand National Adaptation Plan
Overview of Bank Water Sector Activities
River Basin Management Plans
Washington State Infrastructure Financing
A Blueprint to safeguard Europe’s waters
Communication on Green Infrastructure
Strategic Plan for DRM and Urban Resilience along the Choluteca River.
Responding to Changing Climate Washington State Department of Ecology
The International Committee on Contaminated Land Management of Groundwater Quality in the Netherlands
River Basin Management Plans
WG PoM 15 October 2015, Brussels
Optimization for Sustainable Water Resources
Presentation transcript:

Main components of an action Plan Frezghi Irénée Martijn

Situation We, as river basin managers, have just arrived in the Philippines We have the task to set up an action plan for the Province of Antique What will we do in our first week to start things up?

Focus area

General information Information about the basin is available in the Antique strategic upland study, the Physical planning study for ANIAD concentration areas and there is some other literature available On the other hand a lot of information is not available in literature, and should therefore be gathered otherwise

1. Description of the state of basin natural resources, trends and how changes will be monitored List natural available resources in the area such as, (ground)water, minerals, biodiversity, agriculture and how these resources are being used Determine trends in the basin, for instance, population growth, deforestation,floodings, sedimentation/erosion, climate Try to get an overview of temporal trends by using historical literature/maps and memories of elderly people Use satellite images and fieldwork to gather actual data

2. Inventories of land use, ecosystems, current water availability and demands, pollution sources Determine land use by literature research, satellite and GIS information, classify land use groups Ecosystems can be assessed by collecting on site field data and some information is available in literature Water availability can be determined by measurements on surface water flows, groundwater levels and annual precipitation characteristics. At the moment we know that the use of water is arranged on barrangay level, regional water usage agreements are not yet made. By listing water users and their water use, the water demand can be calculated Define polluters by measuring water quality down the river

3. Assessment of aquatic and terrestrial ecosystem needs, vulnerability to floods, droughts or extreme meteorological events, implication of changing land use We have to see the river basin as one coherent system, where everything interacts To asses aquatic and terrestrial needs, we need information about the resilience of the ecosystems and under what conditions they perform best From there we can also asses if an ecosystem is vulnerable to floods, droughts, etc. We have to keep in mind that changing land use can have far going effects on the adjacent environment From information about settlements, topographic knowledge, geomorphologic conditions and hydrological characteristics we can already asses which parts are most likely to suffer from flooding, drought events and erosion/sedimentation

4. Stakeholder analysis Make a table to get insight in important stakeholders: Arrange appointments and meetings between municipalities and identify all stakeholders that shall be participating For example the local level ‘barrangays’ can play a very important role in the participation of local people in river basin policy StakeholderScalePrivate/ NGO/ Public RoleImportance (1-10) barrangaylocalpublicWater supply 8

5. Analysis of priorities List issues and order them by importance Which issue has the largest negative impact and causes other problems? Which solution can be implemented on short term? Is deforestation a more severe problem than flooding and water pollution? Set up a matrix to make an inventory of the priorities

6. Basin and sub-basin goals, both short- and long- term Implement a policy document Implement water pricing Try to solve most immediate problems by setting short term goals If erosion problem is a major and immediate one then, secondary plantation terrace construction along the hills Try to reach multidisciplinary integrated water management on the long term

7. Water allocation and water quality objectives Divide basin wide water resources in a fair way among all water users, taking the environment into account Set water quality objectives according environmental and social standards Set up a water quality monitoring program

8. Benefit shares Set up a plan that ensures the equity of benefits of all stakeholders Reinvest benefits made (from mining, fishing, rice farming, forestry, taxes) partially into development of the region Use money from water pricing to invest in environment and infrastructure

9. Water related development scenarios, assessment of future water demand, risk assessments Predict scenarios by using the trends found in component 1 Take uncertainties into account and make a worst case scenario, a utopic scenario and one in between

10. Strategy, measures and action plans for the achievement of goals, including sub-basin management plans and implementation guidelines The most important is to get participation going between all stakeholders A structured policy and a central commission is important By good communication and participation a river basin vision and a policy document should be formed From the policy document, legislation and action plans can be made

11. Financing arrangement for water use and management, including details for cost-sharing programs, for projects and other actions Money comes from: water pricing Polluter pays Taxes Funds from the national and local government International institution Specific budget allocations are to be made to river basin services and projects, depending on importance

12. Responsibilities and schedules for implementation The state sets up water policy The province implements the central river basin management plan The basin committee works according to the policy and sets a time schedule for the actions taken The municipalities are responsible for parts of the river basin and coordinate the barrangays The barrangays have the action responsibility

13. Details of the monitoring programme Determine what has to be monitored, why and where Network of measuring stations in the river basin

Assignment 2 the provincial government is planning to sell 60 million cubic meters (60,000,000 m3) of gravel to Singapore city. The plan is to mine that amount in 6 rivers. They want to know what possible implications this can have for the river functioning Gravel digging is done in the actual and former river bed, so close to the main stream of the river Assume that digging is done up to 2.5 meters in dept, and for 100 meters of the width of the river bed this means that 240 km of river bed is needed Or 40 km per river in the lower regions. Banks will erode and valuable farmland will be lost Maybe more salt intrusion This means that all the estuaries are destroyed ecologically, morphologically and socially The only positive things are that with a deeper riverbed, flood waters originated by rain can be discharged faster and a lot of money will be made