PUBLIC HEARING FOR THE PROPOSED Notice To Lessee/Operators of Onshore Federal Oil and Gas Leases Within the Jurisdiction of the Wyoming State Office (NTL.

Slides:



Advertisements
Similar presentations
RECORD KEEPING Cooperative Development of Operational
Advertisements

METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
Housing Notice H Use of New Regulation Section 8 Housing Assistance Payments (HAP) Contracts Residual Receipts to Offset Project-Based Section.
Harmonization of Part 60 and Part 75 CEM Requirements Robert Vollaro
ISO 9001:2000 Documentation Requirements
Transition from Q1- 8th to Q1- 9th edition
Product Receiving, Storing, and Issuing
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Defensible IEPs Douglas County School District 1 Module V: Documentation and Timelines.
2 Agenda Goals of documentation training Iowa Administrative Code SURS Reviews Questions & answers.
Unified Carrier Registration (UCR) Update August 24, 2006.
A VISUAL AID TO PYROMETRY COMPLIANCE (A Guide To An Acceptable TUS Report) February 2010.
Revenue Audits Returns processed in a “non-judgemental” manner Revenue Audit of selected returns. Objective is to promote voluntary tax compliance. Audit.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
Legislative Changes to the County Employees Retirement Law of 1937 (AB 340 and AB 197) Presented by: Contra Costa County Employees’ Retirement Association.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Circular A-110 Everything You Didn’t Want to Know.
Petroleum Accountant’s Society of Oklahoma
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Quality Assurance/Quality Control Policy
Office of Business Development Training
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Technical requirements  Sampling  Analysis  Reporting of the results.
Classification of Instruments :
ISO 9000 Certification ISO 9001 and ISO
WLTP DRAFTING TF, "RECORDED" BMW, Christoph Lueginger DISTINGUISH BETWEEN MEASURED AND RECORDED.
Chapter 10 Verification Procedures. Objective In this module, you will learn: u How to define verification u What functions are part of HACCP plan verification.
Counting and Claiming Presented by: Linda Stull Grants Coordination and School Support School Nutrition Training and Programs.
1 Inspection and Testing Approved for Public Release.
WWLC Standard Operating Procedures Presented by Frank Hall, Laboratory Certification Coordinator.
Offtake Metering Errors Stephen Skipp Asset Manager (Transmission and Storage)
VALIDATION METHODOLOGY
Evaluation and Recommendation of a Flow Computer For Replacing Chart Recorders ETM 5121 Project Proposal Submitted By Toby O’Brien.
Calibration Savvy. Calibration and Conformance  Calibration: Check a measurement against a known universally recognized standard to determine any deviation.
INTRODUCTION TO MEASUREMENT
Class Description In the class today we will be discussing how to properly file the P-17 report. The P-17 form is used by an operator when they are surface.
LECTURER PROF.Dr. DEMIR BAYKA AUTOMOTIVE ENGINEERING LABORATORY I.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
ISTOG Winter 2010 – Ed Cavey Fermi 2 1 ISTOG Issues - Code Inquiries / Proposed Code Cases ISTOG Issues from 2010 January meeting and subsequent telecons.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
SCP’s Instructions The 2001 edition for the first time defined the well-established relationship between the Marine Chemist and the Shipyard Competent.
Owner/Operator Responsibilities in Aircraft Maintenance & TSO’s and PMA’s Aircraft Owners and Operators Jim Niehoff – FAA Safety Team.
Uncertainty & Error “Science is what we have learned about how to keep from fooling ourselves.” ― Richard P. FeynmanRichard P. Feynman.
VI. Developing a VSMP Program General Stormwater Training Workshop.
IFTA ANNUAL BUSINESS MEETING DISCUSSION OF IFTA FULL TRACK BALLOTS AND
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
Managing 6(f) Conversions: The Good, the Bad, and the Ugly Greenville, SC September 8-11, 2015.
Mec-Tric Control Company In Field Valve Testing on SRV’s with on process line AVK pressure device. MEC-TRIC.
? Training removes doubt, instills confidence, and lays the foundation for everyone’s skill and experience level.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
You’ve Found The Cure For Cancer… But Can’t Reproduce Your Results! Could Your Test Equipment Be The Weakest Link?
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
F&A Rates 101 Basics of F&A rates for Proposals, Grants, & Contracts Dr. Mindy S. Connolly, CPCM Sr. Sponsored Research Officer Office of Sponsored Projects.
Pressure Measurement and Calibration for Process Instrumentation
Payments Report Verification and Request March 2017
Chapter 10 Verification Procedures.
Time & effort reporting
PUBLIC HEARING FOR THE PROPOSED
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
(Additional materials)
Chapter 10 Verification Procedures.
Inspection and Testing
Transmitted by the expert
Plastic Pipe Rule – Tracking and Traceability Proposed Requirements
OHWARN Workshop Disruption of Service Rule Update
TRTR Briefing September 2013
TGT Telecon Slides, February 9th
Presentation transcript:

PUBLIC HEARING FOR THE PROPOSED Notice To Lessee/Operators of Onshore Federal Oil and Gas Leases Within the Jurisdiction of the Wyoming State Office (NTL ) Standards for the Use of Electronic Flow Computers Used On Differential Type Flow Meters For Gas Measurement

What Meters Will be Affected by This NTL? “Point of Measurement” The last meter measuring gas produced from a federal lease or agreement prior to the gas leaving the lease or agreement, unless off-lease measurement has been approved. It is the meter from which production volume is reported to Minerals Management Service.

Point of Measurement – Example 1 Federal Lease Private Lease Well Meter

Federal Lease Private Lease Well Meter Point of Measurement – Example 2

Federal Lease Private Lease Well Meter Point of Measurement – Example 3

Existing Requirements for Gas Measurement 43 CFR “All gas production shall be measured by orifice meters or other methods acceptable to the authorized officer…pursuant to methods and procedures prescribed in applicable orders and notices.” Onshore Order 5 (OO5) Orifice meters + chart recorders automatically approved AGA Report 3 (1985) Anything else: NTL or meter-specific variance NTL (1995) Rock Springs District, Electronic Flow Computers NTL 96-01, Casper District, low-flow Meter-specific Variances

Why A New NTL? EFC variances a huge workload AGA 1992 calculation requires a variance Technology progression since 1989 (OO5) Standardize EFC requirements Calibration standards and low-flow cut Establish overall measurement uncertainty standards

What Are The Goals of the NTL? Accurate measurement & proper reporting BLM assurance of accurate measurement & proper reporting Blanket approval for EFCs Blanket approval for AGA 1992 calculations for EFCs

What Are The Limitations of the NTL? Not a comprehensive rulemaking for gas measurement Cannot exceed or change the intent of OO5 EFC requirements ≈ chart requirements

NTL SUMMARY “The requirements of this NTL supercede and replace all existing local NTL’s and variances addressing EFC installation and approval.” Rationale: Consistent EFCs requirements

NTL SUMMARY “All EFCs already installed and operating prior to this notice shall be subject to all of the new provisions listed below. Existing EFCs shall be granted a one-year grace period, from the issuance of this standard, to bring those EFC’s into compliance.” Rationale: Accurate measurement & proper reporting needed for all “Points of Measurement”

“Other Standards Incorporated by Reference 1.Onshore Oil and Gas Order 5, Measurement of Gas on Federal and Indian Oil and Gas Leases, remains in full force and effect, except as specified below:……..” NTL SUMMARY Rationale: OO5 applies to EFCs, except: Waives requirements specific to chart recorders Rewords requirements to apply to EFCs Allow AGA 1992 flow calculations

NTL SUMMARY Other Standards Incorporated by Reference (con’t) 2.“EFCs shall be installed, operated, and maintained in accordance with the portions of API Chapter 21, Section 1, 1993, that apply to differential types of flow meters. In addition, Paragraphs 4, 5, 6, 8, 9, and 12, of this NTL supercede or amend sections of API 21.1, as noted at the end of each paragraph listed.” Rationale: API 21.1 is an excellent standard for EFCs BLM has never recognized or adopted API 21.1 Most of 21.1 is adopted Recognize limitations in this NTL

NTL SUMMARY Other Standards Incorporated by Reference (con’t) 3.“All flowrate calculations shall be made in accordance with either AGA Report Number 3 (API Chapter 14, Section 3), 1985, or AGA Report Number 3 (API Chapter 14, Section 3, Part 3), Super-compressibility shall be determined in accordance with AGA Report Number 3 (1985 or 1992), or AGA-8/NX-19.” Rationale: AGA 1992 not currently allowed AGA 1992 = accurate measurement This would allow blanket approval to use the 1992 calculations for EFCs AGA 1992 not a requirement

NTL SUMMARY Informational Requirements 4.“For each meter, the EFC shall display the current instantaneous values of flowing (static) pressure, differential pressure, flowing temperature, and flow rate. The units of measure for each variable shall also be displayed. The display shall be readable without the need for data collection units, laptop computers, or any special equipment, shall be on-site, and shall be in a location that is accessible to BLM (Note: This supercedes API )” Rationale : Necessary for BLM to perform independent inspections Displayed data is unedited API allows a display or data collection unit

NTL SUMMARY Informational Requirements (con’t) 5.“The following information must be maintained onsite and be accessible to BLM personnel without the need for data collection units, laptop computers, or any special equipment (Note: This supercedes API ):  Meter run inside diameter;  Orifice plate size;  Make, range, and model number of each transducer/transmitter;  Calibrated span of each transducer/transmitter;  The physical location of the flowing (static) pressure (upstream or downstream);  A unique meter identification number; and,  Specific gravity”

Rationale : Necessary for BLM to verify accuracy and proper reporting Does not have to be part of the display Same as API 21.1 except for pressure tap location

NTL SUMMARY Informational Requirements (con’t) 6.“All records required by API , shall be retained for at least 6 years, and shall be made available to BLM upon request (Note: This supercedes API ).” Rationale : FOGRMA requires 6-year retention of data API specifies two-year data retention

Informational Requirements (con’t) 7.“Upon request, the operator shall submit all technical documentation pertaining to the EFCs that are installed. This includes installation instructions, calibration procedures, software and algorithm details, and technical specifications. “ NTL SUMMARY Rationale: Manufacturer’s manual and specifications Required to ensure accuracy

NTL SUMMARY Verification and Calibration 8. “As found” readings for the differential pressure and static pressure transducers/transmitters shall be recorded at 0% and 100% of calibrated span, and at one point that represents the normal operating pressure of each transducer/transmitter (Note: This supercedes API and.3).” Rationale: Minimum requirements = charts Applies to verification, not calibration OK to exceed minimum requirements

NTL SUMMARY Verification and Calibration (con’t) 9. “If any of the “as found” readings required in Paragraph 8 are off by more than the transducer/transmitter specification for accuracy, expressed in units of measure (inches or water column or psi)*, that transducer/ transmitter shall be calibrated in accordance with the manufacturers specifications. (Note: This amends API ).” 10. “If either transducer/transmitter required calibration, then prior to returning a meter to service, “as left” readings for those transducers/ transmitters shall be recorded at 0% and 100% of calibrated span, and at one point that represents the normal operating pressure of each transducer/transmitter.”

NTL SUMMARY 11. “If any of the “as left” readings required in Paragraph 10 are off by more than the transducer/transmitter specification for accuracy, expressed in units of measure (inches of water column or psi)*, the transducer/transmitter shall be repaired or replaced within 48 hours.”

NTL SUMMARY Example of Paragraphs 9, 10, and 11: You are verifying the calibration of a differential pressure transducer on an EFC that has a calibrated span of 0-50”. The manufacturer’s specifications for this transducer state an overall accuracy of  0.2% of span. What is the allowable difference between the transducer and the test instrumentation at 0%, 100% and one point in the normal operating range? Answer: The accuracy of the transducer, stated in inches, is 0.2% of 50”, or 0.1”. Therefore, the allowable tolerance at all 3 test points is  0.1”. The transducer must be calibrated per manufacturer specification if the result of any of the 3 test points exceed  0.1”.

NTL SUMMARY Example of Paragraphs 9, 10, and 11 (con’t) The calibrator applies the following pressures to obtain “as found” readings: Required test pointTest instrumentEFC (as found) 0% 0.0” 0.0” 100% 50.0” 49.9” “normal” 27.0” 27.2” Does this transducer require calibration? Answer: Yes. The transducer must be calibrated per the manufacturer’s specifications because the “normal” point is off by more than the allowable 0.1”.

Example of Paragraphs 9, 10, and 11 (con’t) Despite repeated calibration attempts by the calibrator, the “as left” reading at the normal operating point does not change (i.e., it stays at 27.2” while 27.0” are applied by the test instrument). Is this good enough? Answer: No. The transducer must be repaired or replaced within 48 hours, in order to bring the “as left” reading to within  0.1” of the test instrument at all points required. NTL SUMMARY

Rationale : OO5 requires “zero error” prior to the completion of calibration This NTL adopts flexibility This NTL allows 48 hours compliance instead of “prior to completion of calibration as required by OO5 Defines “unacceptable difference” specified by API

NTL SUMMARY Verification and Calibration (con’t) 12. “An ‘as found’ reading for the temperature transducer/transmitter shall be obtained near the normal flowing temperature of the gas (Note: This amends API )” 13. “If the ‘as left’ readings for the temperature transducer/transmitter are not within 0.5  F of the test thermometer, the temperature transducer/transmitter shall be replaced within 48 hours.”

Rationale: No BLM requirements for temperature calibration Adopting the minimal requirements of API 21.1 API 21.1 refers to the “fluid’s temperature”, instead of “normal flowing temperature”

NTL SUMMARY Verification and Calibration (con’t) 14.If, during a calibration, transmitter/transducer errors result in a flow rate error greater than 2% at the normal flowing conditions tested, the volume shall be corrected in addition to adjusting the transducers/ transmitters to the standards specified in Paragraphs 11 and 13.. … Rationale: This is a modification of OO5 to match applicable sections of this NTL

NTL SUMMARY Other 15. “For meters measuring more than 100 Mcf per day on a monthly basis, the EFC shall be installed, operated, and maintained to achieve an overall measurement uncertainty of  3%, or better, of true flowrate. The calculation of uncertainty shall be done in accordance with AGA Report 3, Part 1, 1991, or other method that has been approved by the authorized officer. BLM may prescribe operating limits to implement this requirement.”

Rationale: This meets the intent of OO5 Chart recorder in compliance with OO5 =  3%. Low-flow (<100 Mcf/day) exemptions in OO5 eliminate uncertainty requirements BLM is developing an “uncertainty calculator”

NTL SUMMARY Other Requirements (con’t) 16.“Unless otherwise approved by BLM, the low flow cutoff shall not be set higher than the manufacturer’s basic uncertainty specification for the differential pressure transducer/transmitter, expressed in inches of water column.” Rationale: Low-flow cutoff eliminates false flow caused by transmitter drift DP transmitter should not drift outside its accuracy specification