Laboratory Operational Team

Slides:



Advertisements
Similar presentations
CMRSC Division of Hematology/Oncology
Advertisements

Partnerships for Health Reform Public Sector Contracting of NGOs to Deliver HIV/AIDS Services: Case Studies from Brazil and Guatemala XIII International.
AIRS/UWA Disaster Response Team: What to Expect When Disaster Strikes I&R Training & Education Conference June 1, 2009.
HIV Drug Resistance Training
Anne Sholander, MT(ASCP), International QA/QC Coordinator, SMILE
Roles and Responsibilities. Collaborative Efforts to Improve Student Achievement Guidelines for developing integrated planning and decision making processes.
Multidisciplinary Site Development and Clinical Care Working Group Report 28 July 2004.
ASPIRE Off-Site Visits. Rationale Why make an allowance for off-site visits in the protocol? Adherence & Retention Off-site visits Improving Clinic Flow.
HIV Counseling &Testing. Page 346 HIV and Risk Reduction (RR) Counseling Required at all scheduled visits Includes HIV Pre- and Post-test counseling.
The Roadmap to Successful Xpert Implementation - 37 steps -
NIH Research Funding Source:
Data and IT Working Group J Mthethwa, J Neaton, M Serfontein, H Potgieter, P Khabo, M Gezmu, D Follmann V Jezile, P Ntshangase, Cooper.
@TxSchoolSafety Continuity of Operations Planning Workshop Devolution & Reconstitution.
Project Phidisa Presented by: Lt Sheila Senokwanyane Communication Coordinator Make better, Prolong lives.
How to Prepare for a FTCA Site Visit Office Hours
Conducting multi-centre international research Leanne M Aitken Princess Alexandra Hospital & Research Centre for Clinical and Community Practice Innovation,
1 Money Follows the Person Working Group August 26, 2011.
State Emergency Response Commission (SERC) and Local Emergency Planning Committee (LEPC) “Alabama's coordinating agency for disaster preparedness, response,
Health Workforce Pilot Projects Program Overview.
Employee Self Assessment Tips for writing employee accomplishments Presented by Diana Attia June 16, 2005.
Possible solution: Change testing & care for patients in TB treatment Old system TB patient treated at TB center Referred to VCT center for HIV testing.
Implementing Rapid HIV Testing in New York State Mara San Antonio-Gaddy Director Bureau of Direct Program Operations NYSDOH, AIDS Institute.
1 VA-Affiliated Nonprofit Research and Education Corporations (NPCs) Barbara F. West Executive Director National Association of Veterans’ Research and.
Emerging Latino Communities Initiative Webinar Series 2011 June 22, 2011 Presenter: Janet Hernandez, Capacity-Building Coordinator.
Addiction Health Services Research Conference Lexington, KY Louise Haynes, MSW Adoption of HIV Counseling and Testing Following Completion of Randomized.
Who’s the Boss? Faculty Advisor or Principal Investigator Supervision versus Student Investigator or Study Coordinator Responsibilities Gwenn Snow, MS,
PhidisaTraining Section Report July, 2004 Chair: Capt. Johanna Motaung Co-Chair: Judy Zuckerman Operational Group Members: Cpln. Mashinini Cpln. Mhlongo.
Botswana National Program: Nurses Dispensing ARVs Tendani Gaolathe M.D Director Botswana-Harvard Partnership /PEPFAR Master Trainer Program.
Federal Geographic Data Committee: Coordination Group Meeting Proposal: FGDC Annual Planning Process & Monthly Performance Management Reviews Submitted.
Assignments to the Operational Teams (and a few editorial comments)
1 Phidisa: Regulatory and Ethics Operational Team Report Col. Xolani Currie, Chair Laura McNay, Co-Chair Ezekiel Emmanuel Patty Price-Abbott Anita Lessing.
1 Status Report: Task Force on FAMU Finance and Operational Control Issues Derry Harper, Inspector General & Director of Compliance December 6, 2007.
Enhancing the culture of multi-disciplinary workshops on using data for decision-making: Tanzanian efforts to improve completeness of CD4 assessments Molly.
June 5, Use of the district’s financial resources is key to the ongoing operations : Facilities Transportation Food Service Staff Development.
Interim Executive Director June  Financial Management Practices Audit Results Fiscal Year Audit Results Fiscal Year Internal.
RESIDENT PROJECTS ROBERT LEONHARD QUALITY IMPROVEMENT MANAGER.
DISTRICT IMPROVEMENT PLAN Fiscal Domain Annual Progress Report Lakewood School District # 306.
Belinda Seto, Ph.D. Acting Deputy Director for Extramural Research National Institutes of Health Human Subjects Research Enhancements Awards Renaissance.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Investment Management Process (IMP) ACF-1 John DiNofrio Gary Graybill Alex Storoz March 31, 2003.
Nursing Process- Implementaton. Implementation Implementation is a category of nursing behavior in which the actions necessary for accomplishing the health.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
PHARE TWINNING CONTRACT BG/2004/IB/TR/02/UE Strengthening the capacity of the Ministry of Transport to manage the Sectoral Operational Programme on Transport.
Integration of Male Services into Family Planning Settings April 4, 2006 Norman Clendaniel Delaware Division of Public Health.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Module 5: Monitoring Retention and Adherence to PMTCT and Planning the Way Forward.
1 The GCC Metrology Group GULFMET Mohammad Al Mulla GSO - Building for Integration
NAME 2004 Field Operations and Procedures NAME Special Session Field Operations Center Concept: Define requirements for, and conduct the day-to-day operations,
Use of Routine Feedback Reports to Site and District Staff in Cote d’Ivoire Hermann Brou Annual Meeting, M&E satellite meeting Johannesburg, July 28, 2010.
Investing in Different Models of Local Ownership to Ensure Sustainable Patient Care Track 1 Implementers Meeting Maputo, Mozambique August
Discuss the analytical skills, including systems thinking, needed for a systems analyst to be successful Describe the technical skills required of a systems.
The TJU Human Research Protection Program (HRPP): Part I – Which Entities/Offices are Involved ? J. Bruce Smith, MD, CIP.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
Jeroen Van’t Pad Bosch, Technical Director Elizabeth Glaser Pediatric AIDS Foundation, Tanzania EGPAF PROJECT HEART STRENGTHENING HEALTH SYSTEMS THROUGH.
SHOPS is funded by the U.S. Agency for International Development. Abt Associates leads the project in collaboration with Banyan Global Jhpiego Marie Stopes.
Progress on Implementation of the Comprehensive HIV and AIDS Plan February 2004.
11 Laboratory Quality Improvement for clinical HIV/AIDS Services in the Uniformed Forces Mwaibako, J, Shija, L; Haverkamp, G; van den Hombergh; Katebalila,
1 Module 2: HIV Counseling and Testing for PMTCT Ministry of Health/HAPCO, Ethiopia.
Unit 5a. Managerial activities and administrative controls: exercise TB Infection Control Training for Managers at National and Subnational level.
Durban, July 20th 2016 Ruggero Giuliani MSF - Mozambique
College-Wide Budget Meeting November 12, 2008
Northumbria Primary Care Ltd
Clinical Engineering Lecture (3).
Dr. Velephi Okello, Principal Investigator, MaxART Trial
Effect of POC CD4 testing at HIV diagnosis on attrition prior to ART initiation among youth in Khayelitsha, South Africa Pre-treatment losses to care remains.
MVD System Modernization Implementation Request
Joint Finance Committee/ Council May 21, 2018
Legislative Budget Office (LBO) 2-Year Workplan
120 Day Action Plan FOR SENIOR MANAGER, CALL CENTER OPERATIONS
Department of Teaching & Learning
Presentation transcript:

Laboratory Operational Team Dr Zinhle Makatini Thank you chair. First, I want to thank the organisers for inviting the NCC to participate in this meeting. I am one of the members of NCC and am standing for Dr Khomo, the chairperson. Most of you have already had about the NCC before today’s meeting, and the role of the NCC in the certification process for eradication of polio. I hope I will be able to convince you in the next 10 minutes that our role would be very difficult without your support.

Accomplishments over the past year Initiated contract with Lancet Lab for: CD4, HIV RNA, routine safety labs, repository lab and sample transport Established procedures for: - Phlebotomy (pre- and post-test counselling) - HIV and pregnancy rapid testing - Blood smears - Sample processing and shipping Trained lab personnel at 1 Mil and Mtubatuba

Tasks for Upcoming Year Evaluate composition of Laboratory Team Develop transition strategy for funding Lancet Contract Re-evaluate opportunity for development of enhanced laboratory capability within SAMHS – beginning with sample repository

Composition of Laboratory Team Current Members of Lab Operational Team: South Africa USA Dr Z Makatini (Chair) Dr Robin Dewar (Mentor) Dr MJ Mphahlele Ms Julie Metcalf - Dr L Webber Ms Helene Highbarger Phidisa Lab Staff: - Director (1) - Deputy Director (1) - vacant - Lab assistants (12) – 8 vacant

Transition Strategy for Funding Lancet Contract Current Status – HJF administers funding of the Lancet contract Preparation for change – Scientific Application International Corporation (SAIC) to administer funding for the Lancet Transition from HJF to SAIC projected to take 3-4 months Line of communication for Lancet Laboratory will continue to go through the Phidisa Laboratory Director Dr Z Makatini

Lab Infrastructure at SAMHS Creation of a repository within the SAMHS is the next most important task. Requirements - Building permits - Operational - Facility - Personnel - Data base

Lab Research Proposals Discordant couples HIV Genotyping Predictive value of lab markers: Hemoglobin Total lymphocyte count Weight

Phidisa Laboratory Budget for Fiscal Year ending June 2005* Clinic Labs SAR 350,000 Site visits SAR 70,000 Meetings SAR 45,000 Lancet contract SAR 10,250,000 Repository SAR 7,000,000 *Does not include personnel & genotyping costs

Laboratory Requests for: Operational Teams Please work with the Lab Director to: - Identify lab-dedicated staff. - Establish the patient flow scheme for each site. - Train clinical staff on laboratory specific issues.

Concluding Remarks With the upcoming implementation of new protocols and the opening of new sites, we anticipate a busy year for all, including the Site Labs. Good communication between the site PIs and the Lab Director will ensure the continued success of Project Phidisa.