April, 2002Energy Audits1 Heating Degree Days The difference between the base temperature (balance point) and the mean ambient temperature for the day.

Slides:



Advertisements
Similar presentations
Energy Audit Process For Data Centers Len Kientz
Advertisements

Energy Conservation Energy Management.
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
eQuest Quick Energy Simulation Tool
ENERGY SURVEYING Please Click through this presentation.
Sustainability Advocates Program New Advocates Training April 7, 2009 ENERGY AT NYU.
Portable Classroom Controls Project Chuck Collins RCM Meeting April 27, 2007.
Tas seminar/demonstration on Part L 2006 of the Building Regulations Presented by Alan Jones EDSL February
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Sustainable Architecture Presented by Caroline Batson Senior Architect and Sustainability Manager.
University of Liège Faculty of Applied Sciences Thermodynamics Laboratory Workshop “Commissioning and Auditing of Buildings and HVAC Systems” Use of a.
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
The Three Tiered Philosophy
ENPM808W Energy Efficiency/Energy Audit and Conservation Week III, Lecture 1: Energy Audit Procedures and Energy Benchmarking Dr. Michael Ohadi Spring.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Requirements For Performing A Professional Lighting Audit By Stephen Guthrie President EnerNet, Inc.
BEM class 3 Climate & Human Comfort. Class (lecture) objectives Appreciation of the indoor and outdoor environments and how they relate to our energy.
© CNT Energy 2013 CNT Energy’s Energy Savers Program The Streamlined Approach to Retrofitting Multifamily Buildings in Chicago Russell Ruch Energy Analyst.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Heating energy calculation methods Anti Hamburg Lecture TTK-UAS.
Energy Calculations Dr. Sam C M Hui
Benchmarking Properties for Energy, Water, and Resident Complaints Prepared by Steven Winter Associates & Tohn Environmental Strategies Special Thanks.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
Sustainable IT at Stanford S T A N F O R D U N I V E R S I T Y S U S T A I N A B L E I T Page 1 Energy Efficiency Rebates & Sustainable IT Sustainable.
Introduction to An ASHRAE Professional Development Course Cutting Utility Costs through Strategic Energy Management Draft 01/21/06 1.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
C LIMATE C ORPS B AY A REA 2012 T RAINING Kif Scheuer.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
Conducting An Energy Analysis. Professional Energy Analysis – Summary.
Session 3 - The Tool Box Essential Project Development Tools Ryan Stroupe, PG&E Pacific Energy Center.
© 2001 The Gas Company. All copyright and trademark rights reserved. High Efficiency Unit Heaters Workpaper Presentation Prepared for Cal TF Presentation.
Chapter 7 Heatingand Heat Management Heat Management.
Managing Operational Energy in Buildings
Weatherization 201: Weatherization Works! Updated September 23, 2008.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Name of Building(s) or Project Speaker(s) Organization(s)
Effective Energy Management. 1.Develop baseline 2.Identify and quantify savings opportunities 3.Measure and benchmark to sustain efforts.
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
1 ISAT Module III: Building Energy Efficiency Topic 7: Transient Heating and Air Conditioning Loads  Thermal Admittance  Intermittent Heating 
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
Predesign Conceptual Design Design Development Detailed Design & Documentation Construction Operations and Maintenance.
1 Assessing heating and cooling demands in buildings using the AUDITAC Customer Advising Tool (CAT) Dr Ian Knight Cardiff University UK.
Group 4B: Bergold, Kajander, Leppä, Niemeläinen, Pesonen.
Energy Design of Buildings using Thermal Mass Cement Association of Canada July 2006.
Wireless Sensing and Control of the Indoor Environment in Buildings  Objective: Develop techniques to improve building operation through intensive wireless.
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
Week 9 Common Commercial Building energy efficiency measures (Energy Management Opportunities)
GRES Education. The goals of the GRES Education program are to: help school districts reduce energy use, conserve water, and minimize waste production.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Week 11 Data Collection: meters and instruments – commercial.
Energy Conservation Building Upgrades Alma School District.
Commercial Energy Assessments City of Ames Emily Rice The Energy Group.
Lecture Objectives: Accuracy of the Modeling Software.
Presented to The Raymore Peculiar Schools Board of Education Van McLain Energy Educator/Manager February 26 th, 2007Energy Management Conservation Program.
Part 16 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Fort Stanwix National Monument Energy Audit Contract
Seminar On Energy Audit Submitted To: Submitted By:
Learnings from Energy Audits – and how to get value from them ….
The most exciting DDC control to be introduced in the last 30 years.
Energy Efficiency Saves Your Business Money
Biobehavioral Health Building, University Park, PA
Energy Saving Concepts and Opportunities in Foundry (A case Study)
The most exciting DDC control to be introduced in the last 30 years.
Who Benefits? Building Owners
Presentation transcript:

April, 2002Energy Audits1 Heating Degree Days The difference between the base temperature (balance point) and the mean ambient temperature for the day The base or balance point temperature varies by building type and age of construction. Contributing Variables: –Thermostat setpoint (F°) –Amount of internal and solar gains (BTU/hr) –Amount of heat loss (BTU/hr) If the mean ambient temperature is above the base temperature, no degree-days are counted The number of degree days are totaled for the year

April, 2002Energy Audits2 Heating Degree Days If the balance point temperature for a building is 65F, how many degree days occur during this week in February? The mean ambient temperatures are provided below. Answer: 76 F°-day M T W T F S S How many degree-days if the balance point temperature for the building is 55F? Answer: 15 F°-day

April, 2002Energy Audits3 Heating Degree Day Comparison San Francisco has more heating degree days using a base temperature of 65F° Stockton has more heating degree days if the base temperature is 60F°, 57F°, 55F° or 50F°

April, 2002Energy Audits4 Sources for Climate/Weather Data Data should come from closest weather station Degree-day data available from PG&E See list in handout for on-line climate sources

April, 2002Energy Audits5 Benchmarking Software Programs Energy Star – ARCH –

April, 2002Energy Audits6 Building Documentation Types of documentation –As built drawings –Equipment inventory –Submittals/test and balance reports –Controls schedule –Maintenance logs/service requests What are you looking for? –The major building loads –Control strategies –Efficiencies of equipment

April, 2002Energy Audits7 Site Visit Tasks Observe building usage patterns –Occupants –Services –Production Verify drawings Catalog existing equipment –Lighting –Mechanical –Envelope Interviews Locate electrical distribution panels Take measurements

April, 2002Energy Audits8 Catalog Existing Equipment System configuration Equipment –Type –Quantity –Efficiency Controls –Identify schedules (Building Automation System) –Locate other sensors and controls –Locate zone controls

April, 2002Energy Audits9 Interviews Interviews: –Facility managers –Facility engineers –Service contractors –Custodial staff –Occupants Questions: –Building schedule –Comfort requirements –Building Performance/Maintenance issues –Age of equipment

April, 2002Energy Audits10 Interview Form

April, 2002Energy Audits11 Site Visit at Night Identify equipment that is in operation –Night ventilation –Thermal storage Identify areas that are in use Identify potential phantom loads Observe/interview custodial crew Observe/test controls –Sweeps –Occupancy sensors –Air side economizer

April, 2002Energy Audits12 Preliminary Energy Auditor’s Toolkit Five Senses Matrix (spreadsheet) for data entry, site plan, notepad & clipboard Light meter Flicker checker Temperature/humidity probe Calculator Digital Camera Simple tool kit –Measuring tape –Screw drivers –Allen wrenches –Pliers –Crescent wrench –Knife –Flashlight

April, 2002Energy Audits13 Equipment Matrix

April, 2002Energy Audits14 Site plan should include… Outline of buildings Name and location of each building Year of construction Size (# of floors and square footage) North arrow Location of utility meters Location of mechanical rooms and equipment Location of electrical rooms Room layout with glazing shown

April, 2002Energy Audits15 Detailed Energy Auditor’s Toolkit Everything from the last kit Power meter Strobe tachometer Pressure sensor (manometer) Balometer/anemometer Liquid flow meter Flue gas analyzer Multimeter Powder gun Low-E glass detector

April, 2002Energy Audits16 Cost Analysis: Pay Back Period Calculate cost of retrofit Subtract cost of incentive Divide by annual energy savings [retrofit cost ($) - rebate ($)]/[savings ($)/year] = Payback years

April, 2002Energy Audits17 Cost Analysis: Life Cycle Cost Add to the initial costs of the equipment –Maintenance costs over the life of the system –Energy costs over the life of the system –Disposal/recycling costs Other issues include –Embodied energy –Productivity improvements –Health impacts Efficiencies are considered an investment and should provide a good annual return over product life.

April, 2002Energy Audits18 Energy Use: Large Office Building