1 MTAC 138 April 23, 2014 FAST User Group 3 January 21, 2015.

Slides:



Advertisements
Similar presentations
® MTAC Payment and Acceptance February 19, ® Agenda ME&PT Organization Task Team #23 Communications Update Scorecard/Assessment Update Full Service.
Advertisements

October 23, Value of the Area Focus Groups:  Offers Immediate Issue Resolution  Provides Opportunity for Crucial Feedback / Suggestions / Ideas.
® Service Performance Measurement using Intelligent Mail & Seamless Acceptance.
Global Systems Management Surface Visibility Presented by USPS at July 10 Packages Subgroup Meeting.
® 1 Mail Prep and Entry Steering Committee Meeting May 14, 2013.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
Service Performance Measurement using Intelligent Mail & Seamless Acceptance.
Seamless Acceptance Pritha Mehra, USPS Manager, Marketing Technology & Channel Management.
Understanding & Using the USPS DSMS System The Benefits, Requirements Added Value of the Drop Ship Management System.
1 It’s Time for Intelligent Mail ® : Bringing It All Together Wednesday, Sept. 17, 2008.
Progress with the Postal Act of 2006 November 18, 2009.
Thursday, October 23, 2014 Area Mailing Industry Focus Group Postal/MTAC Update.
Reduce Postage Costs and Improve Delivery, Combined Mailing Solutions PCC Mailers Forum 2014 September 10 th, 2014 Deborah Damore Fairrington Transportation.
1 DSCF Entry Discount Review Tampa Bay Suncoast PCC January 14, 2015.
Mail Entry & Payment Technology Agenda  Benefits of IMpb  IMpb Requirements Unique Barcode Shipping Services File (SSF)  Postal Wizard Enhancements.
1 Catalog Industry Update Tom Foti David Mastervich April 14, 2010.
CSA Simplification March 1, CSA Simplification  CSA to eDoc Association will be modified in June  No changes to CSA file downloaded from FAST.
MTAC Update November 6, 2002 Larry Goodman USPS Co-Chair Dan Minnick Industry Co-Chair.
1 Pritha Mehra Vice President, Mail Entry and Payment Technologies Mail Entry and Payment Initiatives.
FAST for Periodicals MTAC Workgroup 95 Washington, D.C. November 8, 2007.
PostalOne! ® Electronic Mail Improvement Reporting (eMIR) Electronic Mail Improvement Reporting (eMIR) Marketing Technology & Channel Management.
® Western Area Mailing Industry Focus Group July
Southern Area Operational Window Change Effective January 5, 2015 August 21, 2014.
Network Rationalization Mail Moves, Labeling Lists and Mail Direction File Industry Webinar July 1, 2013 To listen to a recording of this presentation.
PostalOne! ® System Presented by:. 2 Agenda What is Business Mail? What is the PostalOne! System? What Does PostalOne! Do? What Are the Benefits? How.
Status of NDC Activations MTAC Briefing August 12, 2009.
® Webinar #12 State of the Business and Do Not Mail Presented by Pat Donahoe and Wendy Hocking Friday, January 30, 2009.
November 01, 2005 MTAC 93 Design & Concept Testing Workgroup Status.
® Flats Update Rosa Fulton Executive Director, FSS Krista Finazzo Manager, Operational Requirements MTAC – November 2010.
Monthly Updates to Presort Data. Agenda What is Presort Data? History of Update Schedule Important Terms to Understand The New Schedule Transition to.
® 1 MTAC 138 April 23, 2014 MTAC 138 October 22, 2014.
Corporate Automation Plan PHASE 2 February 4, 2004Washington D.C.
EInduction Overview 1 eDropship Post-Induction Process October 6, 2010 MTAC Workgroup 138.
1 Presentation Topics Agenda  January Release  BMA Channel Strategy –eDropship –Expanded Start-the-Clock  MTAC Workgroups.
Corporate Flats Strategy MTAC November 7, Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.
Northeast Area Mailing Industry Focus Group February 25, 2015 New York, NY.
MTAC Meeting February 23, 2005 Integrated Mail Management.
® MTAC User Group 007 Meeting October 29, Agenda  Phase 2a Update  MTEOR Enhancements  Inventory Reports.
Optimizing Parcel Preparation & Entry for Seamless Acceptance Final Presentation MTAC Work Group # 109 Industry Leader: Wendy Smith USPS Leader: Jim Cochrane.
February 17, USPS Leadership Forum for Stakeholders.
® Intelligent Mail Update. ® 2 Agenda  Program Update  Move Update  Requirements Reminders  Issues  Release 3 (what’s coming)  Full Service Verification.
Mailing Industry View and Congressional Update Northeast Area Mailing Industry Focus Group Meeting Joe Schick Vice President of Postal Affairs.
EInduction Overview 1 eDropship Post-Induction Process November 15, 2010 MTAC Workgroup 138.
Mail Acceptance and Induction Seamless Mailing with Intelligent Mail Barcodes Debbie A. Cooper Quebecor World Logistics.
Postal Logistics & Transportation Jeff Kruepke Quad/Transportation Services (414)
® Customer Supplier Agreements Presented by Pritha Mehra Vice President, Business Mail Entry Friday, October 17, 2008.
® 1 Network Rationalization APWU Article 12.4.B Meeting February 13, 2012.
® ELT Peak Briefing February 3, 2015 Network Operations Update Great Lakes Customer Focus Group.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
® August 12, 2009 MTAC General Session August 12, 2009 MTAC General Session Update.
1 MTAC eVS®/PTS User Group Thursday November 10, 2011.
1 Service Standards & Measurement Status Report MTAC: February 18, 2009.
GLA FOCUS GROUP August 20, MAILING INDUSTRY ECOSYSTEM 2 Mail Owners E-Commerce Logistics Printers & Mailers Software Vendors Equipment Manufacturers.
MTAC Workgroup #87 - Update Improving the Drop Shipment Process August 3, 2006.
® FSS Update Rosa Fulton Executive Director, FSS MTAC May 20, 2010.
EInduction Overview 1 eDropship Post-Induction Process TBD MTAC Workgroup 138.
® Webinar #10 Commercial First-Class Mail and Standard Mail Measurement Presented by Tom Day Senior Vice President, Intelligent Mail and Address Quality.
Mail Entry & Payment Technology 1 Release 40 Updates MTAC User Group 1 Thursday, January 15, 2015.
1 MTAC May 26, 2011 Washington D.C. Kelly Sigmon Vice-President, Engineering USPS Operations Plan for Flats & Technology Update.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Western Area.
1 Start-the-Clock for Non Full-Service Mailings MTAC 139 November 17, 2010 Rose FlanaganChris Simone Data-Mail IncUSPS.
USPS Response to Hill Request Overview The Request – USPS to “submit a workable plan to fund the key capital investments needed to ensure long- term viability.
1 MTAC WG #175 Update for Northeast Area Focus Group May 4 th,
USPS Pricing October 24, 2011 | 12:30 – 1:30 pm Eastern Time
Chief Operating Officer
USPS Leadership Forum for Stakeholders
Network Rationalization Update
Network Rationalization
Presentation transcript:

1 MTAC 138 April 23, 2014 FAST User Group 3 January 21, 2015

2 Agenda  Roll Call + Review Meeting Minutes (~5 minutes)  Updates (~5 minutes) –Mail.XML Version 10.0 No Longer Supported: R41 –Issue Regarding Testing FAST TEM Environment Follow Up Is testing for making an appointment for HUBs working?  eInduction Pilot at Non-SV Sites Update (~5 minutes)  Network Rationalization Presentation (~40 minutes)  Wrap-up: Questions & Action Items (~5 minutes)

3 Roll Call + Review Meeting Minutes  Roll call  Minutes from January 7 th meeting are posted on MITS –Previous Meeting Summary Completed eInduction Warnings & Verifications Presentation Reviewed Issue Around Testing the FAST TEM Environment Discussed Mail Direction File (V3) ⁻ Conclusion: Still a viable file  Questions or concerns?

4 Updates –Mail.XML Version 10.0 No Longer Supported: R41 –Issue Regarding Testing FAST TEM Environment Follow Up Is testing for making an appointment for HUBs working? eInduction Pilot at Non-SV Sites  The USPS is rolling out eInduction to ALL Non-SV sites starting next Monday, January 26 th  The Postal Service asks mailers to contact USPS at the eInduction USPS account about concerns with scans, misshipped containers etc during national employment. This will be communicated up through the national deployment

5 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization

6  Business Imperative  Phase II Service Standards & CETs  Concept of Operations & Volume Distribution  Phase II Network  Consolidation Timeline  Commitment to Employees  Commitment to Customers  Communication Plans  Project Management Approach Agenda

7  Financial losses of $26 Billion over last 3 years  Continued decline of First-Class Mail volume & revenue  Increasing wage inflation and operating costs  Increasing debt pressures  Uncertainty regarding legislative reform  Review of postal prices in courts  Needed capital investments to acquire package sorting equipment and replace aging delivery vehicle fleet Business Imperative

8 FUTURE NETWORK  Preserves Approx. 66% of Overnight Delivery Volume  Revised Entry Times  Reduced Equipment  Reduced Footprint PHASE II BENEFITS  Reduce Excess Capacity  More Efficient Transportation Network  Fully Utilized Workforce  Up to $750 Million Cost Reduction Driving Efficiency

9 Volume Decline Source: RPW, FY2007 – FY % decline since AMP packages developed

10 Service Standard Changes – Phase II  First Class Mail –Overnight: First Class Presort mail, properly prepared, containerized, for local plants SCF service area, entered by applicable CET –2-day: Intra-SCF single-piece mail or maximum 6 hour drive time between originating facility and SCF facility –3-5 day: Everything else  Periodicals –End-to-end Periodicals transported with First-Class Mail pieces on surface transportation move to a minimum 3-day service standard (equal to the sum of 1 day plus the FCM service standard) revised-service-standards-for-market-dominant-mail-products

11 Periodicals CET Matrix – Phase II Service Standard Change Type No Bundle Sort Needed 5-Digit / Scheme Container Bundle Sort Needed 3-Digit and Up Container Direct 5 Digit Carrier Route Pallets Non FSS FSS Periodicals CETs – Under Phase II Service Standard Change

12 24:00 06:00 12:00 18:00 08:00 Outgoing Operations (5:00 PM – 12:30 AM) Continuous DPS/Secondary Operations (12:00 PM – 6:00 AM) Incoming Primary Operations (8:00 AM – 12:00 PM) BMEU (8:00 AM – 7:00 PM) Continuous Remittance/ Caller Service Processing Concept of 24-Hour Plant Operations

13 USPS Modeled Processing Network Phase II Plan to consolidate processing at 82 mail processing sites in 2015 Facility TypeTotal Annexes2 Customer Service Facilities16 DDC's1 P&DC/P&DF's63 Total82

14 Decrease in Processing Locations Through 2016 Plant Consolidation 239 At start of FY

15  Realignment of operating windows commensurate with earlier availability of committed volume  Realignment of transportation  Delivery opportunities through the earlier availability of mail volume Optimization Opportunities 82 Consolidation Opportunities Identified Savings with the Operational Window Change 82 Moves Proceeding with January 10, 2015 Employee Move Date Phase II- Significant Savings Opportunities Identified

JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC Jan 5 Jan 5 Operational Window Change effective January 10 Plant Consolidations Mail Moves Begin October 1 Finalize All Consolidation Activities | | | | | | | Timeline Network Rationalization Phase 2 – 2015 Timeline Network Rationalization Phase 2 –

17 Methodical, measured transition Options available for staying with the Postal Service Proven track record of working with Unions and Management Associations; success through attrition OUR COMMITMENT TO EMPLOYEES Employees

18 Changes  Planning for new mail processing footprint and transport pattern  Revised Critical Entry Times Our Approach  Industry-specific solutions, as needed  Ongoing communication and collaborative mitigation of issues Our Customers

19  Early Warning System well established  Mail move plan updated and posted on RIBBS  Continued communication with the mailing industry  Site Intervention based on Early Warning System  Feedback system in place to address customer issues: CustomerFirst! System BSN eService Tools & Processes in place to ensure High Level of Service Performance Flawless Execution Recovery “Tiger Team” Early Warning System High Levels of Service Performance Expected

20 AVAILABLE TOOLS CustomerFirst! System  Business Service Network’s (BSN) repository of mailer customer issues  Issues tracked as Service Requests (SR)  SRs handled as open tickets needing resolution in order to be closed BSN eService  Customer-facing access point for CustomerFirst!  BSN customers can submit electronic inquiries and can learn status of inquiry from web account  Non-BSN customers may contact a local BSN representative by phone or for support EWS Reports  Daily Monitoring of plant inventory levels First Class Periodicals Standard Letters Standard Flats  Weekly Monitoring of: Work in Process (WIP) cycle time Pieces processed after clearance time Mail Conditions Early Warning System (EWS) Seamless Service Performance Tools

21  Enables mailers to plan consolidation implementation progress  File provides targeted mail move consolidation site information, type, and date Mail Move Plan File Mail Move Plan is updated and posted on RIBBS RIBBS Mail Move Plan AREA KeyDe-Activation Plant Mail Activation Plant OriginatingDestinatingDPS O- Letter O-Flat O- Packag e D- Letter D-Flat D- Package DPS- Letter DPS-Flat SA Huntsville P&DF CCCCCC7/25/15N/A Birmingham P&DC WA Tucson P&DC CC7/11/15 N/A Phoenix P&DC PA WAEureka CSMPC 7/11/15 N/A Medford CSMPC PA Industry P&DC N/A 4/18/15N/A 4/18/15N/A Santa Ana P&DC (letters) PA Industry P&DC N/A 9/30/15N/A4/18/159/30/15N/A Anaheim P&DC (flats)

22 Mail Move Plan File Includes:  Consolidation sites scheduled for 2015  Site address, locale key, and the name of the activation (gaining) facility  Mail shape effected (e.g. letters, flats, parcels/bundles)  Process step/entry level ( e.g. originating, destinating, and DPS) Mail Move Plan File Updated January 9th, 2015 Note: A new "Read Me First" tab has been added to this spreadsheet to explain key information in displayed below. Key N/A = Not Applicable C or Completion Date = Previously Completed AREA KeyDe-Activation Plant Mail OriginatingDestinatingDPS O- Letter O-Flat O- Package D- Letter D-Flat D- Package DPS- Letter DPS-Flat SA Huntsville P&DF CCCCCC7/25/15N/A WA Tucson P&DC CC7/11/15 N/A PA WAEureka CSMPC 7/11/15 N/A PA Industry P&DC N/A 4/18/15N/A 4/18/15N/A PA Industry P&DC N/A 9/30/15N/A4/18/159/30/15N/A PA North Bay P&DC CCC7/25/15CC N/A PA Redding CSMPC 4/18/15 N/A WA Colorado Springs P&DC CCN/AC7/11/15 N/A NE Southern Connecticut P&DC 9/7/13 N/A9/7/13 N/A4/18/15N/A NE Southern Connecticut P&DC N/A 4/18/155/1/13N/A NE Stamford P&DC 6/17/13 N/A9/7/131/10/159/7/134/18/151/10/15 SA Gainesville P&DC CCCC7/25/15CN/A SA Manasota P&DC CCC9/30/15 C N/A SA Manasota P&DC CCC9/30/15 C N/A SA Mid-Florida P&DC CCCCCC7/25/15N/A CM Athens GA P&DF CCC4/18/15 N/A SA CMAugusta P&DF 7/25/15 N/A SA Augusta P&DF 9/30/15 N/A WA Pocatello ID CSMPC 4/18/15 N/A GL Fox Valley P&DC CCC9/30/15 N/A9/30/15TBD GL Gary P&DC CCC7/25/15 TBD7/25/15N/A GL Kokomo IN P&DF CCC3/14/15 N/A GL Lafayette IN P&DF CCC4/18/15 N/A GL Muncie P&DF CCC7/18/15 N/A GL South Bend P&DC 2/14/15 6/13/15 N/A WA Salina KS P&DF CCC4/18/15 N/A EA Campton CSMPC6/1/15 7/1/15 N/A AREA KeyDe-Activation Plant Mail Activation Plant OriginatingDestinatingDPS O-LetterO-FlatO-PackageD-LetterD-FlatD-PackageDPS-LetterDPS-Flat SA Huntsville P&DF CCCCCC7/25/15N/A Birmingham P&DC WA Tucson P&DC CC7/11/15 N/A Phoenix P&DC

23 RIBBS FAQ’s Frequently asked questions posted to RIBBS

24 We will continue:  Industry Alerts  Industry, PCC webinars and presentations PCC and Managed Account messaging from:  PCC program office  HQ Business Customer Support & Service  From Area and District BSNs BME messaging to affected customers Weekly posting of planned operational moves on RIBBS Structured release cycle for labeling list / mail directional file changes Industry and Customer Communications

25 Project Management

26 Project Plans Established for:  Consolidated Site  Gaining Site  All Sites – Operating Window Changes Project Plans

Complement Advantages of a Transformed Infrastructure Phase ll Benefits Advantages of a Transformed Infrastructure Phase ll Benefits  Reduce Excess Capacity  More Efficient Transportation Network  Fully Utilized Workforce  Up to $750 Million Cost Reduction  Reduced Equipment  Reduced Footprint  Revised Entry Times Phase ll Benefits: 27

28  100% commitment to success of Network Rationalization  Commitment to minimal impacts to customers and our employees  Achievement of the savings projections Our Commitment

29 We are doing our utmost to maintain the long-term affordability of mail and high level of service Long-term Affordability and High Levels of Service We are working to make this transition as seamless as possible for our business customers as well as our 150 million residential addresses Seamless Transition We value the mail and our employees and will provide responsible solutions throughout the transition Responsible Solutions Concluding Thoughts

30

31 Action Items Item # Open ItemsOwner 1Follow up on multi stop appointments and whether appointments must be linked and if a mailer has to have Accept_Misship = “Y” 2Further discussion into the appeals process regarding multi stop loads 3Find a special case regarding how the Postal Service finds the discount level (potentially at a collocated site) and pull a drop site locale key reference 4Follow up regarding the discussion around small mailers 5Future Agenda Topic: Update on eInduction Reports for FCM logical mailers do not work 6Table Zone Discount Verification (E13P) slide 23 for the next meeting. Pull this specific discussion for Zone Discount Verification and to organize for the next discussion 7Double check EPD (slides 19-21) and Zone Discount Verification (slides 22-24) to make sure this wasn’t a copy

32 Action Items Item # Open ItemsOwner 8Double check in this release if changes were made so that Zone Table would be off induction time versus calculation time and postage time. The changes were separate from the eInduction focus. 9Send files to the group regarding the MDF/Labeling List Effective Dates. Try to include effective dates in April release 10Update on Entry Point Discount Mismatch Warning (E7). This is still going on in CAT. Update if it falls out and if there are clarifications 11Industry Request: Expecting this UG to handle all eInduction things, such as going through these reports to make sure they meet the needs of everyone (ie: make sure there are reports. They want to see the language and the errors and then go through the reports) 12Industry to provide an answer as to if the testing for making an appointment for HUB is working 13At one time we talked about getting facility name back into PostalOne!. It is difficult to look up because of locale keys. What is the status of this? Action: Double check this and bring this up in the presentation

33 MTAC 138 April 23, 2014 Questions?