Antenna Structure Registration Environmental Notice Process Form 854 Antenna Structure Registration Environmental Notice Process The Commission’s Antenna.

Slides:



Advertisements
Similar presentations
Click to edit Master title style Page - 1 OneSky Teams Step-by-Step Online Corporate Communication Support 2006.
Advertisements

Page 1 of 12 To the ETS - Correspondence Online Training Course Welcome The Correspondence functionality is an online service that enables clients to receive.
Page 1 of 14 This module describes the process for initiating a CMA application for a Well Re-Entry. An Authorization Request may be required if the applicant.
Submitting Further Information in Relation to a Previously Submitted Application Tutorial 3.
Creating and Submitting a Necessary Wayleave Application
Page 1 of 15 Welcome To the ETS – Crown Mineral Activity Road Allowance Online Training Course This module describes the process for initiating a CMA application.
WASTE MANAGEMENT ©2010 SciQuest USA Confidential 1 Powered by RFx User Guide.
Target 2nd tier Prime Supplier Guide
Vendor Interface Training Manual. 2 Hub Online's Vendor Interface program utilizes the latest internet technology to satisfy all kinds of shipping needs.
This tutorial will take approximately 15 minutes. Click here to advance. Click here to go back.
GSA eBuy Seller’s Tutorial
Electronic Compliance Program-Ex-Im Online Training Overview Disbursement Request Submission October 2013.
Homepage To learn about eLOMA click on the ‘Learn about eLOMA’ link under the Tools For Professionals.
FCC Registration Number (FRN) Phase I Enhancements Online FRN Password Reset and ULS FRN Association FCC Commission Meeting Room Washington, D.C. September.
ShelterPoint™ Data-Entry Workflows. ShelterPoint v5.2.3.
Gasoline and Diesel Event User Guide. Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
MNCIS: Minnesota Court Information System
Employee Self Service (ESS) Version Employee Self Service  access from any computer  view their elected withholding, earnings summary, check.
Role of Account Management at ERCOT Market Participant Identity Management Overview (MPIM)
NAMS Account Activation Training. 2 What is NAMS? The NASA Account Management System is NASA’s centralized process for requesting and maintaining accounts.
UNCLASSIFIED User Guide Applicant. UNCLASSIFIED Table of Contents What is the SAFETY Act? Applicant Guide Help Desk.
FC C Federal Communications Commission Wireless Telecommunications Bureau Prepared by TOWER CONSTRUCTION NOTIFICATION SYSTEM DEMONSTRATION January 31,2005.
Your on-line connection to Ferraz Shawmut; Getting Started Login / out Contact Us Home Page, Account Inquiry My E-Account Account Status Ordering Options.
ECHECK REQUEST APPROVER GUIDE Updated 08/10/2013https://enet.miami.edu.
COCIS Home Page. Click on CA/RA Status hyperlink.
Entering an Adoptive Placement. How to Use This CBT The following graphics are designed to help you to navigate through this Computer-Based Training.
U.S. General Services Administration Doug Janka Area Property Officer (APO) Personal Property Management (PPM) Federal Acquistion Service May 9, 2012 CFL.
GSA’s Vendor and Customer Self Service (VCSS)
How to use Oracle Grid OEM to deploy J2EE applications By: Charles Li Date: 5/2/2005 Updated: 10/12/2005.
Home NEW INNOVATIONS Resident/Fellow Introduction NEW INNOVATIONS Resident/Fellow Introduction This presentation includes the following topics: Login Notifications.
AESuniversity Setting up Referrals. Referral Setup What is a Referral? What do you want out of Referrals? Ways to set up a Referral System User process.
Drinking Water Infrastructure Needs Survey and Assessment 2007 Website.
0 eCPIC Admin Training: Automating User Account Management These training materials are owned by the Federal Government. They can be used or modified only.
HPHConnect New User Registration Tutorial A Guide for Harvard Pilgrim Providers August 2005.
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
Online Bid Submission in Bid4Michigan Screen Walk Tutorial Compiled by Christine Mitchell 1/4/2011.
Design Webcast: Changes Affecting ICWA in eWiSACWIS 01/06/2009.
Commission on Teacher Credentialing Inspire, Educate, and Protect the Students of California Commission on Teacher Credentialing CTC Online Manual October.
My Dashboard (for Corporate Users) Intuit Financial Services University Business Financial Solutions Certification.
1 TOWER CONSTRUCTION NOTIFICATION SYSTEM ENHANCEMENTS March 30, :00 PM Room 6-B516 of the Portals II Building 445 Twelfth Street, SW Washington,
Electronic submission of Applications using PRIAMOS How To Guide PRIAMOS PRogramme Information and Activity Management Operational System.
Dark Light Dark Light Accent Accent Accent Accent
Atrezzo Provider Portal Outpatient Case Creation July 2015 INTEGRATED CARE MANAGEMENT AND QUALITY IMPROVEMENT 1.
At the Workforce Development and Continuing Education Student Menu select Register for Noncredit course(s) under Registration.
Vendor’s Malt Manufacturing Return. Log in with the user id and password provided through the EDS registration process and click on the Login button.
Agenda Background Scenarios Existing Data No Existing Data Search Q & A The User is Presented with the Log In screen to Access the Auction Application.
Navigating Selection Manager –
Partner Ready Portal: New Partner Registration Process
71-95 GHz Registration A Streamlined Approach to Licensing.
PMIS Introduction to Request New Catalog Item Training Presentation US Department of Health and Human Services.
Submit a Response - Non Construction (First Time - No Addenda)
FHA Training Module 1 This document reflects current policy related to this topic. Its content is approved for use in all external and internal FHA-related.
Broker Mexico Domiciled: (Property and Household Goods) Submit an Application for New Registration Unified Registration System (URS) URS New Application.
Maryland Provider Portal Training – Submission of 3808 Retrospective Reviews March 2016.
MODULE IN STATE DBA LOGIN Assign Designations for Technical Assistant work by State DBA.
1. On the homepage, click the “Register” link below the Login box in the left navigation bar. Registration Step 1.
Rapid Global | Suite 8, 240 Currie Street | Adelaide SA 5000 | | 1 Webmaster Instructions: Adding the Rapid link to your.
How to register as a Preparer and create eDMRs
eCHECK Request Approver Guide
How Can NRCS Clients Use the Conservation Client Gateway
Training Guide for Faculty
Learn How to Use the Menu Options
To the OASIS Royalty Reporting Online Training Course
Training Guide for Faculty
To the ETS – Crown Mineral Activity Online Training Course
Vendor Portal Registration Procedures
To the OASIS Royalty Reporting Online Training Course
To the ETS – Crown Mineral Activity Online Training Course
Home Tab – Task List Now please remember that in order to utilize this functionality trade users will need “Full Access” to “Forms” and the mode of communication.
Welcome Effective May 13, 2019 the following services will require an authorization through the KEPRO Atrezzo Portal: Code Modifier Description T1017 HF.
Presentation transcript:

Antenna Structure Registration Environmental Notice Process Form 854 Antenna Structure Registration Environmental Notice Process The Commission’s Antenna Structure Registration system has been modified to incorporate the Environmental Notification Process adopted in the Order on Remand FCC

Antenna Structure Registration Environmental Notice Process Form 854 Antenna Structure Registration Environmental Notice Process Form Modifications Form Administrative - Functional Questions Form Form 854 File Number Form 854R - New Structure Data

ASR Data Entry ASR Application Search ASR Registration Search - New Search Criteria Online Pleadings System Environmental Notice Process System Modifications Antenna Structure Registration

Environmental Notice Process Antenna Structure Registration Required: New Tower Construction - No Waiver - Not on Federal Lands - EA Modifications to Existing Towers - Height Increase - Lighting Change to Less Preferred Style Exempted: Replacement Towers Modifications - Administrative Data - AGL Height Lowered - Lighting Change to More Preferred Style Purposes: OC, NT, CA, AU, DI, DU, WD

ASR Environmental Notice Process Additional guidance materials are available at the FCC’s website: Antenna Structure Registration

List of Applications on Environmental Notice After deployment a link to the list of Applications on Environmental Notice will be added to the ASR Home page.

A link to the list of Applications on Environmental Notice will also be on the ASR Application Search page.

- The file number is a hyperlink to the application details. - The File Environmental Request button takes the user to the online Pleadings module.

- When clicking on the File Environmental Request button this informational window is displayed. - The Continue button takes user to the online Pleadings module.

The ASR Application Search details page provides the user with the ability to: - View Pleadings filed for an ASR Environmental Request - View Environmental Assessment documents submitted by the applicant.

ASR Data Entry Screens – Login Page

ASR Data Entry Screens – ASR Manager Page

ASR Data Entry Screens - Purpose Utilizing the purposes in this section will display only your applications currently on National Notice. Utilizing the purposes in this section will display only your applications that are Ready for Certification. These applications have been on Environmental Notice for 30 days + the 10 day buffer period and a FONSI has been issued or no EA is required. These applications are ready to file the Part 2 of the Form 854.

Filing Part 1 of New Purpose Form 854

Entity Type drop-down list selections:

ASR Data Entry Screens - Contact Information Page

ASR Data Entry Screens – Antenna Technical Data Page The FAA Study Number and Issue Date are not required in the Part 1 filing of the Form 854.

Type of Structure drop-down list selections:

Proposed Marking and/or Lighting Options drop-down selection list:

Environmental Compliance page - Scenario 1 - (Environmental Notice is required)

Environmental Compliance page – Scenario 2 - (Waiver Request)

Environmental Compliance page – Scenario 3 - Another Federal Agency Responsible for Environmental Review)

ASR Attachment Types

ASR Data Entry Screens – Application Summary Page

ASR Data Entry Screens – Certification Page

ASR Data Entry Screens – Confirmation Page

Filing Part 2 of New Purpose Form 854 Select Amend/Certify an Application in the Applications Ready for Certification section.

* Select application and click Continue button.

* * The system prefills and displays all of the data entered in the Part 1 filing.

The FAA Study Number and Issue Date are now required.

The system prefills and disables the Part 1 answers. The “Certification” is the only question required to be answered on this page.

Select the basis for your certification and provide the Local Notice Date.

ASR Data Entry Screens – Part 2: Application Summary Page

ASR Data Entry Screens – Part 2: Certification Page

ASR Data Entry Screens – Part 2: Confirmation Page