Sample Management Office

Slides:



Advertisements
Similar presentations
Office of River Protection 2013 Hanford ORP Site Status Report
Advertisements

By Chris Ford and James Hughes ( ) ( )
1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
Office of Science Experience with Surveillance and Maintenance (S&M) of Environmental Remediation David Michlewicz – DOE Office of Science, Office of Safety,
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Part III Solid Waste Engineering
Septage Bioreactor Landfill
PRESENTED BY PETER A. SALPAS, PH.D., SALPAS CONSULTING, INC. WITH PATRICIA J. HALSEY, U.S. DEPARTMENT OF ENERGY DEIDRE THARPE, RESTORATION SERVICES, INC.
Great team work. Ecomaster 9 years of activity on Romanian environmental services market with result of positioning as one of the major national providers.
DEPUTY DESIGNATED FEDERAL OFFICIAL PRESENTATION JOEL BRADBURNE, PORTS SITE LEAD U.S. DEPARTMENT OF ENERGY Portsmouth Site Specific Advisory Board September.
Data Management and the Asbestos Management Plan LCDR Robert Horsch Environmental Compliance Branch Division of Environmental Protection.
Corporate Overview Analytical Services Program (ASP) George E. Detsis Manager, Analytical Services Program Office of Environment, Health, Safety and Security.
Office of River Protection 2014 Hanford ORP Site Status Report Glen Clark, WRPS 2014 ASP Workshop September, 2014 Albuquerque, NM Glen Clark, WRPS.
Solid Waste Management Lilian Giertz. Overview  What is solid waste?  How does this affect us?  Current management practices  Future management possibilities.
U.S. Department of Energy’s Consolidated Audit Program (DOECAP) U.S. Department of Energy’s Consolidated Audit Program (DOECAP) Dr. Todd L. Hardt DOECAP.
A Corporate Overview of the Department of Energy Consolidated Audit Program (DOECAP) George E. Detsis Manager, Analytical Services Program Office of Corporate.
U.S. Department of Energy’s Analytical Services Program Systematic Planning and Data Assessment Tools and Training - SPADAT DOE Consolidated Audit Program.
Remote-Handled Transuranic Waste Disposition Discussion Meeting of the National Governors’ Association April 12, 2001 U. S. Department of Energy.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
Jhon Carilli Low-Level Radioactive Waste (LLW) Activity Lead
A Corporate Overview of the Analytical Services Program Annual Site Environmental Report/Environmental Monitoring Workshop Albuquerque, New Mexico October.
Alliant Corporation SAME Savannah Post Sustaining Member Presentation 24 JAN A VA-Certified Service-Disabled Veteran-Owned Small Business
U.S. Department of Energy’s Analytical Services Program George E. Detsis Manager, Analytical Services Program Office of Corporate Safety Programs, HS-31.
Review of Contractual Agreement Requirements Associated with DOECAP George E. Detsis Manager, Analytical Services Program Nile Luedtke DOECAP Operations.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
U.S. Department of Energy’s Consolidated Audit Program George E. Detsis Manager, Analytical Services Program Office of Corporate Safety Programs, HS-31.
One Project. One Team. One Goal.
Environmental Protection in the United States Christopher Green U.S. Embassy July 13, 2006.
Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.
DAVIE LANDFILL Banu Sizirici. MAPS Vista View Park (Davie Landfill)
Office of River Protection 2015 Hanford ORP Site Status Report
Maintaining Department of Energy (DOE) Waste Disposition Pathways in Today’s Uncertain Budgetary Environment Presented by: Lori West July 2015.
Fiscal Year 2015 Overview of the Analytical Services Program (ASP) George E. Detsis Manager, Analytical Services Program Office of Sustainable Environmental.
Nevada National Security Site (NNSS) Nevada Field Office (NFO) FY 2015 Status Report Milinka Watson-Garrett Analytical Services Manager U.S. Department.
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop.
Retrieval and Treatment of Problematic MLLW Streams Renee Echols Senior Vice President CTMA Partners in Progress, July 7, 2015.
DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Portsmouth Site Status Report September 15, 2015 ASP 2015 Workshop.
1 X UCOR Oak Ridge Sample Management Office 2015 Site Status Report Presented by Dr. William Rogers.
1 What’s New in Environmental Management? Karen Shears, Director Procurement and Contracts Division Oak Ridge Office of Environmental.
1 X Oak Ridge Office of Environmental Management 2015 Site Status Report Presented by Vanna Gaffney.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and.
FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 DOE Oak Ridge Office Rebecca Whitehead.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, P.E. Office of Engineering and Construction Management Facilities and Infrastructure.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
Zahava Busse Madeleine Weitzner Period.7/Mr.Vinlove
The Challenge of Getting What You Asked For Integrated Safety Management Summit Knoxville TN August 24-27, 2009 Presented By: Patrice McEahern HNF
East Tennessee Technology Park Emergency Management Program (Vision 2020) Darryl Bonner UCOR Emergency Management October 15, 2015.
Biomass Cogeneration Facility Savannah River Site Aiken, SC
 Construction  Environmental  Remediation June 2008.
Office of Legacy Management Land Transfer and Reuse November 2006 Steven R. Schiesswohl Senior Realty Officer, Office of Legacy Management.
DOECAP Laboratories Phased Audits U.S. Department of Defense 2016 Environmental Monitoring and Data Quality Workshop St. Louis, Missouri April 12-14, 2016.
Cogen for Waste to Energy Process CoGen Limited, Blythe House, Blythe Park, Cresswell, Stoke - on - Trent, ST11 9RD
Kevin Colvett, PE Jonathan Childs, PE CH2M HILL, Nashville CORRECTIVE ACTION PLAN AND ENGINEERING REPORT, PHASE III, FOR THE CITY OF BRENTWOOD, TN Presentation.
2014 Environmental/Radiological Assistance Directory George E. Detsis Manager, Analytical Services Program Office of Environment, Health, Safety and Security,
Low-Level Radioactive Waste (LLW) Disposition at the
Previously… The Northeast region was explored to understand general trends in both anomalously cold day and CAO frequency. Trends appeared to show a decrease.
Oak Ridge National Laboratory Office of Science Site Status Report
Sample Management Office
DOE Consolidated Audit Program
DOECAP Laboratories Phased Audits U. S
U.S. Department of Energy 2016 ASP Workshop
Portsmouth Participation in the DOE Consolidated Audit Program
George E. Detsis Manager, Analytical Services Program
Analytical Services Program Manager,
Superfund Sites: Summary of Oak Ridge East Tennessee Technology Park (ETTP) and Portsmouth Gaseous Diffusion Plant, Ohio.
Oak Ridge Office of Environmental Management Update
Scientific or Engineered Landfilling of Waste
Presentation transcript:

Sample Management Office UCOR Oak Ridge Sample Management Office 2014 Site Status Report Presented by Phil Clark X

UCOR Scope of Work on the Oak Ridge Reservation

UCOR Scope of Work Perform D&D and remediation activities across the Oak Ridge Reservation (ORR) Manage the ORR Landfill and the Environmental Management Waste Management Facility (EMWMF) Manage the Water Resource Recovery Program (WRRP) Perform Environmental Compliance Monitoring Waste management and disposition Pre-Design Study for the Mercury Treatment Facility at Y-12

D&D Activities at ETTP Current ETTP D&D Activities K-25 Slab K-27 (Entire Facility) K-31 (Entire Facility) Planned Activities Poplar Creek Facilities K-1037 Facility Centrifuge Facilities Central Neutralization Facility Toxic Substances Control Act (TSCA) Incinerator Balance of Facilities D & D Completed Property Transfer In Process .

D&D Sampling and Analysis Analytical support for characterization of facility contents and construction debris K-25 slab, K-27, and K-31 are currently underway Other facilities are expected to be shifted to scope as these are completed 3000 analyses performed in FY14 Total cost for analytical services ~$600K

Landfill Operations Environmental Management Waste Management Facility (EMWMF) CERCLA waste associated with the ORR Must meet WAC requirements Oak Ridge Reservation (ORR) Landfill – (formerly the Y-12 Sanitary Landfill) Disposal of sanitary, industrial, construction, and demolition waste

EMWMF and ORR Landfill Sampling and Analysis Sample Locations Monitoring wells Contact Water Leachate Air Sampling Number of analyses per year is relatively constant Weekly, Quarterly, Semi-annual, Rainfall event driven (EMWMF) Dynamic analytical suite for the EMWMF 8000 analyses performed in FY14 Total cost for analytical services $1.2M

Water Quality and Environmental Compliance

Water Quality and Environmental Compliance Sampling and Analysis Samples Groundwater Surface Water Outfalls Runoff Air Monitoring Annual sampling for Water Quality is relatively constant Environmental Compliance varies some, but overall is constant 21,000 analyses performed in FY14 Total cost for analytical services $1.4M

Waste Management and Disposition UCOR has taken a proactive and aggressive approach to waste management Waste is characterized and shipped as it is generated The majority of legacy waste has been dispositioned 1400 analyses performed on waste materials in FY14 Total cost for analytical services $175K

Y-12 Outfall 200 Treatability Study and Conceptual Design Outfall 200 at right; Flow Augmentation at left

Mercury Treatment Facility at Outfall 200 UCOR has performed treatability studies in support of the conceptual design report. Pre-design studies are now underway. Anticipated construction beginning in 2017 Operations starting in 2020. The proposed facility can treat 1,500 gallons of water per minute. The treatment facility will be NPDES permitted

Site Remediation Expected increase in soil samples from the ETTP site Driven by the Zone 1 and Zone 2 Records of Decision (RODs) Some will be associated with land transfers and footprint reduction Will require very low reporting levels in some cases depending on final disposition of parcel ~$10K spent on remediation in FY 2014

Bioassay and Industrial Hygiene Bioassay Program 2500 analyses $250K Will see a decrease in FT 2015 due to changes in program requirements Industrial Hygiene Program 2600 analyses $225K Expected to remain relatively constant through 2015

DOECAP Laboratories ALS Laboratory Group, Cincinnati, OH ALS Laboratory Group, Fort Collins, CO ALS Laboratory Group, Salt Lake City, UT ARS International, Inc., Port Allen, LA Brooks Rand, Seattle, WA CNS Y-12 Analytical Chemistry Organization, Oak Ridge, TN Eberline Services, Oak Ridge, TN GEL Laboratories LLC, Charleston, SC Materials and Chemistry Laboratory, Inc., Oak Ridge, TN Oak Ridge Institute for Science and Education, Oak Ridge, TN Southwest Research Institute, San Antonio, TX TestAmerica Missouri, St. Louis, MO TestAmerica Tennessee, Knoxville, TN

Specialty Laboratories Assured Bio Labs, LLC, Oak Ridge, TN BCS Laboratories, Inc., Gainesville, FL CH2M Hill Applied Sciences Laboratory (ASL), Corvallis, OR Microbial Insights, Inc., Knoxville, TN Microseeps, Inc., Pittsburgh, PA Shaw Environmental Inc. (a CB&I Company), Knoxville, TN

Analytical Support Summary Analytical laboratories performed over 38,000 analyses in support of UCOR projects in FY 2014 The total cost for analytical services in FY 2014 was ~$4M FY 2015 analytical support is expected to remain largely unchanged New D&D characterization projects are expected to be added to the current scope as K-27 and K-31 are completed Landfill, Water Quality, and Environmental Compliance Program needs are expected to remain constant Analytical needs for waste characterization associated with the Waste Disposition Program are expected to decrease about 15-20% Bioassay requirements are expected to decline approximately 50% Industrial Hygiene sampling is expected to remain constant

TSDFs

UCOR TSDF Usage Diversified Scientific Services, Inc., Kingston, TN EnergySolutions, LLC, Oak Ridge, TN EnergySolutions, LLC, Clive, UT Materials and Energy Corporation, Oak Ridge, TN Perma-Fix Environmental Services of Florida, Gainesville, FL Perma-Fix Northwest, Inc., Richland, WA Waste Control Specialists LLC, Andrews, TX TCI of Alabama Veolia Environmental Services (Port Arthur, TX; Tallahassee, FL, Port Washington, WI)

TSDF Summary FY 2014 Over $3.0M spent on waste Disposition FY 2015 $2.5M Projected FY 2016 $2.0M Projected

DOECAP Qualified Auditors Laboratory 1 Team Lead 3 Contractor TSDF 1 Team Lead 2 Contractor

K-25 Retrospective The “U” was the first stage of the K-25 Plant. It came online in 1945.

K-25 Retrospective The K-25 building was 4 stories high and almost a half mile long. The building enclosed some 2 million square feet of space, making it the largest building in the world at the time. The final stages of the plant did not come on line until mid-August 1945. Maximum enrichment during the war was about 20%. The eventual cost of the K-25 complex would be over $500 million. Even though the plant was fully automated, 9,000 employees working in three shifts were needed to operate the plant.

K-25 Retrospective Because the uranium hexafluoride gas which was pumped through the building attacked grease, new pump seals had to be developed that were both gas tight and greaseless. The new seal material developed came to be known after the war as Teflon. In April 1945, a second gaseous diffusion plant, K-27, was started. It would come on line in January 1946 and make all of the other uranium separation processes obsolete. After the war additional gaseous diffusion buildings were built to increase production of enriched uranium (K-29, K-31, K-33). The original K-25/K-27 facility was shut down in 1964 after operating without error for 20 years. The rest of the gaseous diffusion plant was shut down in 1987.

K-25 Retrospective The final wall of the K-25 Facility comes down…

K-25 Retrospective UCOR completed demolition of the K-25 facility in June 2014 6 months ahead of schedule DOE realized a cost savings of ~$225M from the early completion Slab characterization is underway

Any Questions