Developing a Comprehensive Energy Plan for Your Facility.

Slides:



Advertisements
Similar presentations
Energy Audit Process For Data Centers Len Kientz
Advertisements

Energy Performance Contracts Chip Barnes. What is an EPC? Popular way to obtain infrastructure energy efficiency & operational improvements with: Popular.
Energy Efficiency Programs June 2012 Presented by: Dr. Herbert M. Eckerlin, Professor of Engineering.
Introduction to Performance Contracting. What Is an ESCO? An Energy Services Company helps customers: –Upgrade facilities, including both: Energy efficiency.
DANIEL SELIGMAN Policy Manager, Maryland Energy Administration NICHELE PARKER Program Manager, Maryland Energy Administration.
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
Guilford County Schools ENERGY MASTER PLAN for School Facilities July 25, 2008 Facilities Planning and Construction Department Maintenance Department.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Improving Industrial Energy Efficiency 6 th Annual High- Performance Manufacturing Conference Cobourg, November, 2010.
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
City of Dallas 2030 District Initiative April 24, 2015.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Department of Facilities Management Maintenance & Operations.
Energy Conservation & Performance Contracting
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
2 Approved by the Board of Regents in 2006 to support rising energy prices due to double digit increases in utility rates and in lieu of an increase in.
Rachel Weaver Program Manager Maryland Energy Administration
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Local Government Case Study – Fairfax County Jennifer L. Gorter, PE, CEM Fairfax County Government Facilities Management Department (FMD) July 11, 2008.
GETTING HELP FOR LARGE ENERGY EFFICIENCY IMPROVEMENTS AT A SMALL COLLEGE Anne Duncan, Environmental Sustainability Coordinator Terry Rowe, Sales Team Leader.
October 2007 Energy Efficiency Partnership For Greater Washington.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
You can achieve 100% Energy Saving WHEN YOU TURN OFF THE LIGHTS.
Building Metering & Benchmarking: It’s Worth the Energy American University Emily Curley, Sustainability Coordinator Chris O’Brien, Director of Sustainability.
Saavedra Gehlhausen Architects Title: text size 36 pt. Text size 28 pt. Karl J. Jacobs Center for Science and Math.
Big Ten Sustainability Conference November 14-15, 2010 Funding Strategies: Energy Savings Projects and Seed Grants Funding Strategies.
Leveraging an Energy Plan Managing Energy to Reduce Operating Cost and Improve Building Valuation.
1 every student. every classroom. every day. Building a Sustainable School District Jody London, President, Board of Education October 28, 2011 Council.
Sustainability and Public-Private Initiatives Sean Patton Director, Energy Solutions LOCKHEED MARTIN CORPORATION JUNE 8, 2012 Sustainability for the Future.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Resource Conservation Program November 2003 Kelley Gonzales Resource Conservation Manager.
Phoenix Convention Center Phoenix, Arizona Data Center Energy Management Strategies Edwards AFB Data Center Consolidation ESPB Building Performance Data.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Meeting the 10% Conservation Goal Jennifer L. Gorter, PE, CEM Fairfax County Government Facilities Management Department (FMD) April 11, 2008.
Energy Conservation Initiatives Joan Kowal Energy Manager, UMCP May 1, 2008.
Leading by Example Philip Gates, CEM, CMVP, EIT Energy Manager 1.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Nicholas J. Hennessy, Ph.D Sustainability Coordinator Bowling Green State University Energy Conservation Measures: It Takes a Community.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Supporting NCCU’s Educational Mission – with “Real-Time” Energy Measurement & Reporting.
Energy Services Harsha Holalu Ramakrishna Energy Extension Specialist Department of Mechanical and Aerospace Engineering.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
E NERGY P ERFORMANCE C ONTRACTING : Financing Energy Performance Improvement Projects Patricia Gómez PE, CEM, LEED AP Office of Sustainability Miami-Dade.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
Energy Efficiency Update Before the Senate Energy, Utilities & Communications Committee Part 2 May 17, 2011 – State Capitol Robin Smutny-Jones Assistant.
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
District of Columbia Housing Authority Office of Capital Programs and Development Construction Services Administration, LLC Going Green: Intelligent Investments.
Turning Energy Data into Operations Intelligence Presented to: FMA September 17, 2013.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Ontario SMART GREEN Program. Program Overview  SMART Green is a program funded by the Ontario Government to drive competiveness, energy efficiency and.
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
The Energy Efficiency and Solar Nexus:
Fort Stanwix National Monument Energy Audit Contract
EDENTON-CHOWAN SCHOOLS
EnMS Management Review
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
The ESCO Retrofit Model Financing energy efficient HVAC improvements through ESCOs Stephane le Gentil - November 2017.
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Delivering Efficiency with Performance Contracting
EDENTON-CHOWAN SCHOOLS
Presentation transcript:

Developing a Comprehensive Energy Plan for Your Facility

Presenter Ralph Graham, BS EET, MHA, CHFM Director, Utilities Management UAB, Birmingham, AL Served on the ASHE Board Serving ASHE Task Force and Committees Serving on AHA-CC Committee Since 2007 Serving on AHA-CC Board AlaSHE’s ASHE Advocacy/Sustainability Liaison AlaSHE Member since 1996 AlaSHE President 2000

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Agenda Establish a Baseline Evaluate Energy Conservation Efforts Determine Program Objectives Proposed Energy Conservation Program Program Schedule Program Costs and Savings Case Studies Next Steps

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps UAB Baseline Operates and Maintains 12.2 Million Conditioned SF Total Utility Cost - $47.2 Million O&M Cost - $7.27 per SF Utility Cost - $3.87 per SF Energy Management Department Funded by 3.07% Utility Surcharge Develop a Baseline

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Energy Efficiency Benchmarking UAB Site EUI: 156 kBtu/SF 50 th Percentile Site EUI Benchmark: 136 kBtu/SF 25 th Percentile Site EUI Benchmark: 118 kBTU/SF 10 th Percentile Site EUI Benchmark: 106 kBTU/SF Savings Opportunity: 32% Develop a Baseline

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Prior Energy Conservation Program (ECP) Efforts UAB Facility Management Replaced 10,000 Fixtures in CY2013! Energy Cost Reduction Measure Annual Savings ($/year) Building Occupancy Schedules1,500,000 Reduce Air Flow Setpoints700,000 Retrofit Light Fixtures300,000 Replace Water-Cooled Vacuum Pumps and Air Compressors 150,000 Install Variable Frequency Drives40,000 Reclaim Fin Water104,000 Meter Sewer Diversion1,800,000 Replace Equipment800,000 Retro-Cx Hospital Facilities3,000,000 Modify Utility Rates and Riders2,000,000 Total10,394,000 Evaluate Prior Efforts

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Program Objectives Reduce Energy Consumption to Lowest 10% of Peer Institutions Reduce Greenhouse Gas Emissions by more than 25% Reduce Annual Energy Costs by more than $15 Million Improve Thermal Comfort, IAQ and Occupant Safety Extend District Systems to New and Existing Buildings Single Platform Instrumentation, Control and Electronics System Upgrade Building Automation Systems Sustain Energy Savings Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Proposed Energy Conservation Program Preliminary Program Cost Estimate: $112.1 Million Estimated Annual Program Savings: $15 Million Program Implemented in 4 Phases: – Phase 1: Develop UAB Strategic Energy Plan – Phase 2: Evaluate Energy Conservation Program Funding Methods – Phase 3: Implement Energy Cost Reduction Measures – Phase 4: Sustain Energy Consumption and Cost Savings Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Phase 1: Develop UAB Strategic Energy Plan Supply-Side Audits Building Demand-Side Audits District Energy System Demand-Side Audits ICE Long-Range Plan Campus Strategic Energy Plan (StEP) ICE Staff Assessment & Benchmarking Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Phase 2: Evaluate Energy Conservation Program Funding Methods Alternative 1: Business as Usual Alternative 2: UAB Facilities Department Bond Issue Alternative 3: District Energy System Reserves with Reinvestment of Savings Alternative 4: Energy Savings Performance Contract Alternative 5: 3 rd Party Asset Monetization Alternative 6: 3 rd Party District Energy System Concession Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Alternative 1: Business as Usual Flat Rate for Steam and Chilled Water Consumption Individual Department Funded Energy Reduction Projects Conventional District Energy Systems Design Additional Plant Capacity Installed for Campus Growth Multiple Building Systems – Not Integrated Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Alternative 2: UAB Facilities Bond Issue Provides Funding by Sale of Tax-Exempt Bonds Bond Covers all Program Costs UAB Manages All Activities Bond Payment Allocated to Each Campus Department Steam and Chilled Water Rates Established by Cost of Service Studies Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Alternative 3: District Energy System Reserves with Reinvestment of Savings Invest in Highest Payback Projects First Reinvest Savings to Fund Remaining Projects Self-Financed Program Slower Program Implementation Schedule Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Alternative 4: Energy Savings Performance Contract UAB Provides Financing Energy Savings Company (ESCO) Implements “Turnkey” Cost Reduction Measures ESCO Guarantees Annual Savings Contingent on Continued Contract with UAB Actual Savings are Measured & Verified through Pre-Approved Plan Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Alternative 5: 3 rd Party Asset Monetization Provides Funding through Sale of UAB District Systems Sale Price Structured to Cover Cost of Energy Conservation Programs 3 rd Party Pays All Costs Associated with ECP Related to District Energy Systems UAB Continues to Operate District Energy Systems Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Alternative 6: 3 rd Party District Energy System Concession Similar to Alternative 5 3 rd Party does not Purchase the District Systems from UAB 3 rd Party Purchases a Concession Right to Operate UAB’s Equipment and Systems Replacement of CEP Equipment by 3 rd Party Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Phase 3: Implement Energy Cost Reduction Measures Supply-Side ECP District Energy System Demand-Side ECP Expansion of District Energy System Building Demand-Side ECP ICE System Upgrades Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Supply-Side ECP Negotiate Rates and Riders Removing Tax from Exempt Accounts Demand Response Other Utility Incentives Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps District Energy Demand-Side ECP Rate Design for Fixed Cost Recovery Increase Chilled Water Temperature Difference Extend District Energy to New and Existing Buildings Install Most Cost-Effective – Combined Heat and Power – Heat Pump Chiller Heater – Thermal Storage Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Building Demand-Side ECP HVAC & BAS Upgrades Retro-Commissioning Lighting Retrofits UAB Colleges: School of Medicine College of Arts and Sciences College of Business College of Dentistry College of Education College of Engineering College of Health Professions College of Nursing College of Optometry College of Public Health UAB Hospital Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps ICE System Upgrades Consolidate into Single ICE Platform – Building BAS – Plant PLC – CAMS – Metering System Integrate BAS and ADT Systems Unique Operator Passwords Energy Efficiency Programming Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Phase 4: Sustain Energy Consumption and Cost Savings Sustain Reduced Energy Consumption – Program Support – Remote Monitoring – Operator Training Maintain Achieved Energy Cost Savings – Measurement & Verification Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Remote Monitoring Regular Engineer and Controls Technician Review of ICE Systems Develop List of Issues Present Issues Log to UAB on a Monthly Basis Assist Personnel with Troubleshooting Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Measurement & Verification Obtain and Compile Utility Bills for Each Building Establish a Baseline Obtain Daily Utility Meter Readings Issue Daily Scorecard Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Daily M&V Scorecard Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Training O&M Staff Pre-Assessment of O&M Staff to Determine Training Requirements Develop Curriculum e-Learning Programs Comprehensive Training Program with Classroom and Field Training Sessions Post-Test O&M Staff to Assess Training Effectiveness and Determine if Additional Training is Required Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps ICE Standards Standard Systems List Control Diagrams Points List Sequence/Programming Instructions Network Standards Utility Metering Applications Web Services Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Design & Commissioning Standards Develop Design Standards – HVAC – TAB – CEMS – Information Technology – Interior & Exterior Lighting Develop Commissioning Standards Develop Matrix to Identify Applicability of Standards to Project Type Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Utility Management Services Review Each Utility Bill Verify Utility Rates and Riders Verify Proper Metering Hedge Natural Gas Commodity Participate in Demand Response Programs Program

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Project Schedule* Schedule PhaseStart DateCompletion Date Phase 1: Strategic Energy Plan17-Feb-141-Oct-14 Phase 2: Evaluate Program Funding Methods 17-Feb-1431-Jan-15 Phase 3: Implement Energy Cost Reduction Measures 1-Mar-1431-May-16 Phase 4: Sustaining the Energy Consumption and Cost Savings 1-Mar-1431-Dec-15 *Dates will be coordinated with UA BOT meetings and other approval requirements.

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Estimated Cost of Projects * Project to be Reviewed for Economic Feasibility CategoryCampus Parking Decks HospitalResearch District Energy Systems Total Retro-Commissioning 750, ,000210,00001,460,000 BAS Upgrades 13,000,000280,00010,400,0008,750,000032,430,000 Lighting Retrofits 4,800,000650,0003,150,0001,350,00009,950,000 HPCH Equipment * 2,500,00004,000,0002,000,00008,500,000 Combined Heating and Power * ,000,000 Expand District Energy Systems ,000,000 Convert Chilled Water System to Variable Primary * 00004,500,000 Demand Response Program * 00008,000,000 Cost of Service Based District Energy System Cost Allocation ,000 Other Projects 2,105,00001,805,0001,231,0004,950,00010,091,000 Total 23,155,000930,00019,855,00013,541,00054,619,000112,100,000 Cost and Savings

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Alternative 2: Bond Financing Cash Flow Projection * Assumes tax-exempt bond for 20 year term at all inclusive interest rate of 4.5% Cost and Savings

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Case Study: University of Arkansas System Case Studies ItemUnitsTotal Conditioned Floor AreaSF13,214,450 Total Investment in Energy Efficiency Projects$135,471,303 Total Investment in Energy Efficiency Projects$/SF10.25 Baseline Annual Utility Costs$38,545,487 Baseline Annual Utility Costs$/SF2.92 Current Annual Utility Costs$21,978,078 Current Annual Utility Costs$/SF1.66 Annual Savings$16,567,410 Annual Savings$/SF1.25 Annual Savings%43 Average Simple PaybackYears8.18

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Approve and Execute ECP Proposals Complete Hospital ECP Projects – Retro-Cx Surgery HVAC Systems in North Pavilion – Retro-Cx Remaining HVAC System in North Pavilion – Retro-Cx Spain-Wallace – Retro-Cx West Pavilion – Pilot ADT Interface for WIC and North Pavilion Next Steps

Agenda Develop a Baseline Evaluate Prior Efforts Program Schedule Cost and Savings Case Studies Next Steps Questions?