Erez Etzion, Tel Aviv University

Slides:



Advertisements
Similar presentations
Developments of micromegas detector at CERN/Saclay
Advertisements

sTGC for ATLAS Small Wheel upgrade
Status of the ATLAS MM project
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Proposal and current status of developments 4 th RD51 meeting (WG1) 23 November 2009 Atsuhiko Ochi ( Kobe University )
The ATLAS B physics trigger
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
1 Cluster Quality in Track Fitting for the ATLAS CSC Detector David Primor 1, Nir Amram 1, Erez Etzion 1, Giora Mikenberg 2, Hagit Messer 1 1. Tel Aviv.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
LHeC : Muon Systems L. Pontecorvo.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
SPHENIX GEM Tracker R&D at BNL Craig Woody BNL sPHENIX Design Study Meeting September 7, 2011.
Muon System and Physics Performance Ludovico Pontecorvo CERN-INFN.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
Trigger processor John Huth Harvard. NSW + TGC of BW’s track fitting track position (R,  ) d  : deviation of incidence angle from infinite pT muons.
STGC Trigger Demonstrator sTGC Trigger Demonstrator ATLAS Israel Annual Meeting 30 December 2012 Lorne Levinson, Julia Narevicius, Alex Roich, Meir Shoa,
The ATLAS New Small Wheel Trigger Lorne Levinson For the ATLAS NSW collaboration ACES workshop, 19 March 2014 Thanks to my NSW colleagues for many slides.
A new generation of RPCs to be tested for the super- LHC CERN GIF workshop 20/06/2011 G. Aielli.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
Shandong University TGC Site Review Review team General impression Material presented Possible improvements Action items Conclusions.
M. Bianco On behalf of the ATLAS Collaboration
Some thoughts on the New Small Wheel Trigger Issues V. Polychronakos, BNL 10 May,
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
ATLAS micromegas activities (MAMMA)
Report of activities in T1049 (M6-FTBF) Introduction Test beam set-up Preliminary results Conclusions.
New Small Wheel muon trigger optical module New Small Wheel muon trigger optical module S. Hou 2014/08/29 Academia Sinica.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Summer Student Session, 11/08/2015 Sofia Ferreira Teixeira Summer Student at ATLAS-PH-ADE-MU COMSOL simulation of the Micromegas Detector.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
 The zigzag readout board is divided into eight η-sectors; each sector has a length of ~12 cm and comprises 128 zigzag strips; zigzag strips run in radial.
Precision Drift Chambers for the ATLAS Muon Spectrometer
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
24/03/99Report to LHCC Referees Muon Group Status Report Outline: Muon Filter - New Geometry - Support System Optimisation Studies - Pad, Strip and Pad/Strip.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Prototyping electronics and data acquisition for sTGC
STGC Trigger Electronics sTGC Trigger Electronics ATLAS New Small Wheel Milestone Meeting January 2013 Lorne Levinson L. Levinson, sTGC Trigger Electronics1NSW.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
Muon New Small Wheel sTGC Trigger for Phase I ATLAS NSW sTGC Workshop July 2012 Lorne Levinson, Nachman Lupu, Giora Mikenberg, Julia Narevicius,
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
NSW Electronics Preliminary Design Review Feb 2015 Introduction and Review Scope Feb 2015 NSW ELTX PDR S. Zimmermann 1 Stephanie Zimmermann.
L. Pontecorvo1 The Muon New Small Wheels INFN CSN L. Pontecorvo.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Trigger & Tracking detector for CMS
MICROMEGAS per l’upgrade delle Muon Chambers di ATLAS per SLHC Arizona, Athens (U, NTU, Demokritos), Brookhaven, CERN, Harvard, Istanbul (Bogaziçi, Doğuş),
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
The principle of operation of a micromegas chamber
Muon Chambers and Electronics for ATLAS Phase 2 Upgrades
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Results achieved so far to improve the RPC rate capability
Atlas: Upgrade Phase I Massimo Della Pietra.
Dubna/JINR Status & Plans
ATLAS-MUON Trigger hardware developments
CMS muon detectors and muon system performance
Optical data transmission for
for the transition region on behalf of the RPC upgrade group
Tracking and L1 triggering in the ATLAS Muon spectrometer at sLHC
Why Micromegas? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack.
ATLAS Muon Spectrometer and
LHCb Muon Detector MWPC & GEM
L H C A T L A S International Collaboration on the LHC Project
Pre-installation Tests of the LHCb Muon Chambers
Presentation transcript:

Erez Etzion, Tel Aviv University ATLAS Upgrade Program E. Etzion, RECFA meeting, Tel Aviv April 10th, 2014 Erez Etzion, Tel Aviv University

E. Etzion, RECFA meeting, Tel Aviv LHC timeline Here is the timeline for the LHC (written in black) and ATLAS (in blue).because of the increase of the luminosity, The ATLAS detector must be upgraded according the LHC upgrades. The NSW project will take place in the Phase 1 upgrade, around 2018 April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

ATLAS Muon Spectrometer CSC MDT TGC A z-y view of 1/4 of the ATLAS detector (0,0) is the interaction point. The yellow box is the big wheel region and the blue box is the small wheel region . In yellow we have the Cathode Strip Chambers (CSC) , in blue the Monitored Drift Tube chambers (MDT) and in violet the Thin Gap Chamber (TGC). It is located approximately 7 m from the interaction point. It covers the angles with eta between 1.3 and 2.7 April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Thin Gap Chambers April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Muon trigger April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Why upgrade ? Performance of the muon tracking chambers will be degraded with the luminosity increase Muon end caps trigger will have too high fake rate Average luminosity : 9.6 1032 cm-2 s-1 luminosity : 1034 cm-2 s-1 Simulated hit rate (Hz/cm2) Range tube rate 200-300 kHz On the left picture, we have the hit rate in the region of the Small wheel in the CSC and MDT chambers as function of the radial distance from the beam line for L = 9.6×1032 cm−2 s−1 at √s = 7 TeV . The first 2 meters are covered by the CSC and the rest is covered by MDTs.in red, we have the fit to the data and in blue, the fit to the simulated cavern background (low energy photons and neutrons). The ration between the simulated and real data allows to calculate the foreseen rate at higher luminosity represented on the right picture : it shows the (observed) hit rates in the MDT and the CSC scaled to the value corresponding to the nominal Run III luminosity of 3 × 1034 cm−2 s−1.. We can clearly see that most of the detectors will be irradiate with a rate superior at 500 Hz/cm2 the yellow band represent the range of hit rate between 200 and 300 khz/tube, because of the size of the tubes. a big fraction of the MDT system will have to operate with tube rate much above 300 kHz. This is a real problem because as you can see on the next slide, April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv NSW trigger concept Increased Phase I backgrounds, but must maintain existing trigger rate Filter “Big Wheel” muon candidates to remove tracks that are not from the IP Only track “A” should be a trigger candidate. Challenge is latency: 500nsec for electronics + 500ns fibres to be in time for Big Wheel Micromegas: 2M strips, 0.5mm sTGC: 280K strips (3.2mm), 45K pads, 28K wires sTGC, MM find candidates independently, list merged for Sector Logic Hit per layer: sTGC: hit is centroid of 3-5 strips Micromegas: hit is address of strip   April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Detector layout sTGCs: primary trigger detector Bunch ID with good timing resolution – additional suppression of fakes Good space resolution providing track vectors with < 1 mrad angular resolution Based on proven TGC technology; Pads & strips, instead of only strips as in current detector Micro-Mesh Gaseous detectors (Micromegas): primary precision tracker Space resolution < 100 μm independent of track incidence angle Good track separation due to small 0.5 mm readout granularity (strips) Excellent high rate capability due to small gas amplification region and small space charge effects 9.3m A 3d view of the current small wheel. The CSC are in green , the TGC in brown and the MDT in blue. The size of the small wheel is roughly 10m high Present Small Wheel – defines basic layout and envelopes 16 detector layers in total 2 technologies, MicroMegas and sTGC April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv sTGC Based on TGC technology Lower cathode resistance – for high rates Pads – online trigger tower Strip charge readout – precision coord. readout Wire readout – coarse f coord. Pads coincidence defines ROI and select strips to send to sTGC trig processor where precise position is calculated sTGC geometry Wire-carbon gap 1.4 mm Wire-wire space 1.8 mm Strip pitch 3.2 mm Inter strip gap 0.5 mm Gas mixure CO2:n-pentane (55:45) Wire potential 2.9 kV April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Construction sites April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Muon test beam set up Muon test beams at CERN (180 Gev) Two quadruplets equipped with ASD, two monitor chambers (small TGC chambers M1 and M2) and two scintillators M1 M2 L1 L2 L3 L4 L5 L6 L7 L8 Sc1 Sc2 Combined test with sMDT Mechanical system that allows to rotate the TGC with high accuracy A typical test beam setup is composed of 2 scintillators read by PMTs to trig the signal. 2 monitors, which are in fact 2 small TGC are used to track the muons and the 2 quadruplets in between. This set up allows to calculate efficiency, resolution,… and so on and … April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

Demonstrated homogeneity of the quadruplet Resolution < 100 mm Position resolution Nuclear Science Symposium and Medical Imaging Conference (NSS/MIC), 2011 IEEE Resolution : difference between expected position from track fit (3 planes) and measured position (4th plane) Position resolution as a function of the incidence angle for the different layers of a sTGC Measure the difference between the expected position from the track fit from 3 plans and measured in the 4th plans. We reached resolution between 60 and 110 um, depending on the HV applied and the position in the chamber. On the bottom plot, the position resolution as a function of the incidence angle for the 4 layers of a TGC : we can see almost no effect of the incident angle and good homogeneity of the quadruplet. Demonstrated homogeneity of the quadruplet Resolution < 100 mm April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

Irradiation with neutrons Test in Demokritos (Greece) : Cosmic muons tracking under neutron (5.5-6.5 MeV) irradiation s The TGC have been tested under neutron radiation at demokritos in greece. The setup is shown on the top figure : the trigger for cosmic ray muons was provided by the triple coincidence of two pairs of ”monitors” – small TGC. The hit position was obtrained by the ”quadruplet” placed between the monitor pairs, as shown in the schematic. The same type of front-end and readout electronics as in the CERN test was used. The procedure of determining the efficiency and resolution was identical to the one described in the previous section, i.e. by fitting a track using three TGC layers and comparing the predicted and measured positions on the fourth On the bottom figure, we can see the efficiency as a function of the irradiation rate. The efficiency deterioration at high rate is not significant. Although there was a concern that neutrons may give rise to large signals, producing sparks, no such sparks were observed during the five-day period of the test. . A hit was considered good if the measured position was less than 10 mm away from the predicted one. No drastic degradation of the efficiency : less than 4% at the highest dose rate No sparks observed Efficiency rate for L=1035 cm-2s-1 90 April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

Irradiation with 60Co source Tests at Nahal Soreq (IL). Cosmic muons detection under gamma (~50 Ci 60Co source) irradiation. sTGC is 120x70cm2 was totally irradiated. Position resolution and efficiency measurements with large scale Thin Gap Chambers for the super LHC, arXiv:1006.0135 [physics.ins-det] No efficiency deterioration observed for a flux of 2.104 Hz/cm2 We keep the Same setup as for the neutron test. The plot shows the efficiency as a function of the rate for different HV values. There is no efficiency loss even at high rate (~20kHz/cm2) April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv nSW - Electronics ·         nSW Trigger Processor. A collaboration of Arizona, Brookhaven, Bucharest, Harvard, Saclay, UC Irvine, Weizmann. The Israeli team focuses on the sTGC part. ·        Front-end electronics ASIC. Testing and characterization of the FEE ASIC at Weizmann and Technion. ·         sTGC Front-end boards – collaborating with USTC on the requirements of the sTGC FE boards ·       New readout for Phase I and Phase II. A collaborative effort of Argonne, Brookhaven, CERN and Weizmann (initiators!) to develop common readout the shared across ATLAS. It is moves substantial functionality which was previously custom hardware for each detector to commercial PC servers and software. ·         nSW Electronics coordinator - L. Levinson (Weizmann) April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

New FE ASIC for the nSW : VMM New ASIC common for MM and sTGC designed in 2011. Israel started testing in 2012 Front end provides 64 channels Time to peak Time over threshold Adjustable gain : from 0.5 to 9 V/pC Adjustable peaking time : from 25 to 200 ns Threshold per channel VMM1—An ASIC for Micropattern Detectors, G de Geronimo IEEE Trans.Nucl.Sci. 99 (2013) 1–8. New ASIC common for MM and TGC delivered in 2012. It provides : 64 channels Time to peak Time over threshold Adjustable gain : from 0.5 to 9 mV/pC Adjustable shaping time : from 25 to 200 ns Threshold per channel April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Result sTGC strip + VMM1 In last test beam, strip readout was realized with ASD and VMM ASD analog output (HV=2.85 kV) VMM 3mV/fC (HV=2.85kV) VMM 9mV/fC (HV=2.7kV) Since a new front-end ASIC has been developed, it was important to test the position resolution that can be achieved with this electronics, in particular since the measurements are based on a peak sensing ADC and the efficiency. Bottom figure shows the efficiency as a function of the impact angle for 3 configuration : ASD, VMM 3 mv/fc and 9 mv/fc. The efficiency exceeds 92% for all relevant angles, while the lost 8% are mainly due to a minimum ionizing muon accompanied either by a δ-ray or a second particle The top plot shows the postion resolution as a function of the impact angle for the 3 different configurations. It can be seen that the same position resolutions are achieved, but with a much higher efficiency. VMM1 is working well . Some small problems will be corrected with the VMM2. Except for a few minor problems, all VMM features are working VMM2 April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Simulation Weizmann (S. Bressler) and Irvine U are working on L1 simulation looking at the PADs trigger U. of Michigan and University of Science and Technology of China are working on the strip trigger side. Technion (A. Di Mattia) responsible for the integration in Athena. April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Prototype status 60 x 40 quadruplets Used to develop concept to construct sTGC Training field for the new teams Module -1 First development of full size sTGC The type to be built in China Parts are available and assembly underway April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Status Israel Israel provides overall project coordination PL – G. Mikenberg Construction at Weizmann inst. Cosmic ray testing at Tel Aviv Electronics developments at Weizmann and Technion Test beam coordination Tel Aviv & Weizmann Basic infrastructure well established Focusing on development of assembly techniques Knowledge transfer to Canada, Chile, China, US Recently invested in producing a 40cm x 60cm quadruplet prototype Developed drawings for full size modules Production of prototype for the testbeam April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Man power Instititue Physicists Engineers / Technicians Post docs Students Technion S. Tarem N. Lupo A. Vdovin A. Di Mattia Weizmann I. G. Mikenberg L. Levison D. Lellouch V. Smakhtin S. Bressler M. Shoa B. Pasmantier J. Narevicius, Roich 8 technicians for instatation Tel Aviv U. Y. Benhammou E. Etzion M. Ben Moshe M. Davies A. Ashkenazi H. Cohen April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Funding Institute Source budget Technion I-Core equipment ISF nSW Aida (Gif++) 530 k$ * 1000 k$ (10 years)* 30 k euro (5 years) Weizmann I. ISF (IL-china) + for jigs Minerva 360 k$ 1000 k$ (10 years) 100 k$/year 100 k$ 3 * 50 k euro 20 k$ Tel Aviv U. 206 k$ ISF nSW 3M$ paid to CERN in 10 years. I-Core is an estimated extrapolation. Last two years we got ~30% April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv

E. Etzion, RECFA meeting, Tel Aviv Summary nSW an approved international collaborative effort for the ATLAS upgrade As in the ATLAS construction days a common Israeli effort ! Supported by ISF / institutes and iCORE. nSW goal is to support high flux radiation without loss of trigger efficiency and position resolution Sandwich with micromegas : MM for tracking purpose and sTGC for trigger (fully redundant) First prototype of a new front end designed for MM and sTGC gave good results Module-1 will go for testbeam at Fermilab on May 2014 MUON & nSW week in Israel on June. Working toward installation on 2018. April 10th, 2014 E. Etzion, RECFA meeting, Tel Aviv