MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona 12-15 May 2003 One phase rural distribution installation with direct connection.

Slides:



Advertisements
Similar presentations
Earthing of MV and LV Distribution Systems: A multi-faceted problem.
Advertisements

The Electrical GuruTM Paul W. Abernathy,CME
How to wire CCTV SURGE PROTECTORS By F R Joseph Anton Limited
Earthing PRESENTATION BY: Er. Satnam Singh Lecturer(Electrical engg.)
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Tom Jespersen Energy Adviser. Verendrye Electric Service Area Serve parts of 6 counties around Minot 15,000 meters First PV system installed in 1991 Currently.
SHUNT CAPACITOR FUNDAMENTALS AND PROTECTION
PowerGUARD Energy Saving for inductive loads Saving 8%-15% Protection Power Quality.
PRESENTATION ON SUBSTATION DESIGN
Overvoltage Protection, A. Zeddam, Dakar, Senegal, 25 March 2015 ITU Regional Standardization Forum For Africa Dakar, Senegal, March 2015 Overview.
Single Phase IEC and EATS Distribution Transformers
Overvoltage protection (surge arrester)
Protection Against Transient Overvoltages
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Electrical Power J. Mitchell for AE-210. What Does Electrical Power Do? Provides Energy for Buildings Provides Energy for Buildings Usually all except.
All rights reserved Surge Arrester.
Grounding, bonding, and ground fault currents
SWER New Zealand & Australian Experience
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
By J DAVID MANOHAR (08A31A0232). NECESSITY OF SUPERCONDUSTOR  Damage from short circuit is constant threat in power systems  All the power systems components.
Schematic Diagrams & Circuits
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000.
1200 kV AC Substations - Products and Integrated Solutions International UHV Symposium New Delhi, 29. January 2009 Edelhard Kynast Siemens AG, Energy.
MONFILS Pierre-André (BE) Barcelona May 2003 One phase rural distribution installation with direct connection to HV trunk line P.A. MONFILS, Jean-Louis.
Melo EDP PT Session 2 – Block III – Question 9.1 Barcelona May EDP Distribuição Energia ASD Immunization to Voltage Dips Case Study in Cement.
Didden, M BE Session 2 – Block 3 Barcelona May Considerations to choose the appropriate voltage sag mitigation device M. Didden, K.U.Leuven.
1 Progress of, and prospects for, commercial applications of UHV 1100kV Transmission System in TEPCO 2 nd International Symposium on International Standards.
International Telecommunication Union ITU-T Study Group 05 The model testing/simulations Yasuhiro Honma Technical Session on Home Networks Geneva, 29/04/2011.
KEM_Cespedes_A1 Colombia Session 3 – Block 1 Barcelona May ACCURATE MODELING FOR LOSSES REDUCTION USING A REAL-TIME POWER FLOW AT ENELVEN.
Utility Engineers, PC.  Generation  Transmission  Distribution.
POWER HOUSE.
Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona May ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
Department of Electrical Engineering
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
132KV GSS PIPAR CITY JODHPUR
Diagnostics of photovoltaic power plants operation Vitezslav Benda, CTU Prague, Faculty of Electrical Engineering.
1 Pacini IT Barcelona May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology.
Submitted To:- Submitted By:- Mr.
S. MELQUIOND France Session 1 – Block 1 – Question 1- 5 Barcelona May Question 1-5 Is the transformer protection by mean of protection switch.
Block Diagram of a Typical Electric Supply System
A PRESENTATION On 400KV GSS SURPURA JODHPUR
M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M.
HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
DEPT OF ELECTRICAL& ELECTRONICS MAHKAL INSTITUTE OF TECHNOLOGY UJJAIN.
Exit REMOTE POWER SYSTEM ”Turning your copper into gold”
Single Phase and three Phase Distribution Substation
6 Week industrial Training Presentation
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
© ABB Group October 1, 2016 | Slide 1 DynaPeaQ ® SVC Light ® with Energy Storage FACTS.
Comparison of AIS and GIS Grid Station Muhammad Ali Ashraf Management Associate (Electrical) CPP Project.
Radio Base Stations Sited on Power Line Towers
Automated power Factor Correction and Energy Monitoring System
SUB-STATIONS.
Management Of Tulkarm Electrical Network
Earthing System Earthing System for : - Electrical Network
SHORT CIRCUIT MONITORING BY USING PLC & SCADA
EE6501 POWER SYSTEM ANALYSIS
Basics of electrical engineering
Design of Electric Power Systems and Utilities
Earthing System Earthing System for : - Electrical Network
BY Presenter Name: G.V,Reddy DESIGNATION: Sr. General Manager
Determination of harmonic emission: problem of higher frequencies
Engineering Project Cable Management.
Optimization of the Energy-Supply-Structure of modern Aircraft by using conventional power system technologies Dipl.-Ing. Ilir Purellku Electrical Power.
Contactor A contactor is an electrically controlled switch (relay) used for switching an electrical power circuit. A contactor is typically controlled.
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Presentation transcript:

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May 2003 One phase rural distribution installation with direct connection to HV trunk line P.A. MONFILS, Jean-Louis LILIEN, A. OMBOUA

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Scope of the project Local conditions Makola application Load Reliability aspects SUMMARY

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Scope of the project The problemThe solution

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Typical low load user (Makola)

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May One 500 people village: Estimated load (UNESCO) Typical low load user (Makola) Conclusion: 50 kVA is OK !

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Local conditions

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Local conditions 846 km from the main power supply Very low short-circuit level: 360 A Very low load: –Frequent over-voltages –Important power availability 50 kVA = SIL (Surge impedance loading) Very high keraunic level (lightning activity)

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Local conditions High soil resistivity: > 3000 .m –HV earth resistance: 35  –Risks for the inhabitants in case of line-to-earth fault in case of lightning on the HV line –Needs deep analysis of earthing system

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Schematic diagram Makola application

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May SF6 VT technology: high reliability Limited maintenance Limited weight: easy to transport/handle Limited cost (no switch bay) Direct from 245 kV to 230 V (50 kVA) Makola application

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Makola application

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Makola application

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Makola application

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Load recording

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Load recording

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Reliability aspects Improved technology (SF6 VT) with very limited maintenance Immediate protection by ZnO surge arrester One year experiment: the reliability of the equipment is much higher than the HV system (min 5 power outages per month) Possible improvement by use of HV fuses

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May Improvement of the quality of life of rural populations (< 3% of peoples access electrical power in Congo) Electrical energy gives access to drinking water, food preservation, lighting. Electrical energy may help starting development of local activities Our solution is cost effective, easy to handle and reliable Conclusions

MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May 2003 Thank you for your attention !