Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures

Slides:



Advertisements
Similar presentations
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
Advertisements

Larsen Consulting Solutions, Interconnection Activity around the U.S. IREC Interconnection Workshop Wichita, Kansas October 1, 2003 Chris Larsen.
IREC Interconnection Workshop Oct. 1, Interstate Renewable Energy Council Interstate Renewable Energy Council Kansas Interconnection Implementation.
GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Microgrid – A Smart Grid Alternative Service Delivery Model? Thomas.
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
1 NARUC/FERC Collaborative on Demand Response Pepco and Delmarva Power Blueprint for the Future Filings J. Mack Wathen July 15, 2007.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
Net Metering and Interconnection A Policy Perspective Brad Klein Staff Attorney Envt’l Law & Policy Center March 28, 2007.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Interconnection of Distributed Generation
Smart Grid & Microgrid R&D
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Net Metering and Interconnection Requirements IMUA 2015 Annual Conference May 8, 2015 Delia Patterson General Counsel, APPA.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Topics to Cover Interconnection Process Overview
DOE Interconnection Activities Presented by: Eric M
The Regulatory Assistance Project 110 B Water St. Hallowell, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Grid Access Unit Small and Micro Generator frame-work key focus areas Date : 18 April 2013.
Interconnection of Small Wind & Solar Systems to Distribution Utilities: A Cooperative Perspective Patrick Parke Midwest Energy Hays, KS September 26,
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
 Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image.
Central Vermont Public Service Recognized by Forbes as One of the Most Trustworthy Companies in America Lessons Learned Interconnecting Distributed.
IEEE 1547: The DG Interconnection Standard
Small Generator Interconnection Workshop Goals and Potential Midwest Interconnection Strategy Carmel, Indiana June 15, 2006 Presented by Brad Johnson ACN.
Small Generation Interconnection Standards - IOU Dennis Reed Westar Energy Topeka, KS September 26, 2007.
Demand Response: The Other Side of the Market Assessing the Potential for Demand Response Programs Springfield,IL May 12, 2006 Richard E. (“Rick”) Morgan.
Small Renewable Generators Tony Marciano Public Utility Commission of Texas May 2, 2007 (512)
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Overview Interconnection Federal Regulations –1978 PURPA Legislation –1992, 2005 & 2007 PURPA Legislation Changes –RUS Rules DG Policy State Regulations.
Renewable Generation Interconnection Ken Brunkenhoefer Distributed Generation Consultant
05/18/001 N.Treadway Distributed Resources and Competitive Energy Markets in Illinois Workshop Session III, “Interconnection Issues” Thursday, May 18,
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
DGS Recommendations to the Governor’s Task Force on Contracting & Procurement Review Report Overview August 12, 2002.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
Overview and Status of Distributed Energy Resources Policy Docket Jay Griffin, Chief of Policy and Research Hawaii Public Utilities Commission August 4,
Promoting Distributed Generation Resources Through State Initiatives Ed Ethridge Public Utility Commission of Texas Distributed Resources in Restructured.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Distributed Generation Registration June 30, 2008.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
2004/06/0 2 Market Operations Standing Committee of the IMO1 Small Facilities - Technical Requirements Rhonda Wright.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Interconnected Generation Preliminary Engineering Work Related to Fees.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
Summary Overview: Maryland Straw Man Interconnection Rule Prepared by Brad Johnson* January 11, 2007 ACN Energy Ventures *National.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
Transmission-Distribution Interface Working Group Meeting
Integrated Planning of Transmission and Distribution Systems
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Pseudo-tie business procedure
Electricity Distribution Network Design Training & Courses
DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
Indian Grid Code and Commissioning Test Procedure Dr
Working with Utilities Sean W. Carr, P.E., PMP®
Collaborative Results Restructuring Roundtable March 28, 2003
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Pseudo-tie business procedure
Presentation transcript:

Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures *National Renewable Energy Laboratory Subcontractor MIDWEST INTERCONNECTION WORKSHOP

2 What is the Mid-Atlantic Distributed Resources Initiative (MADRI)? Five PJM jurisdictions Regional approach to DR, DG, & Efficiency Facilitated stakeholder process with open mtgs Support from US DOE –also EPA, FERC, PJM MADRI ‘working group’ meets every 6-8 weeks

3 MADRI Initiatives Include:  Advanced metering infrastructure  ‘AMI Toolkit’ for state regulators  PUC briefings  Model regulatory structures to promote distributed energy resources (DER)  Model dynamic pricing tariff (in progress)  Model revenue stability mechanism (in progress)  Effort to enhance DER business case  Mitigation of wholesale market price spikes  Distribution system value of DER  Model Interconnection Procedures For more info:

4 MADRI Interconnection Goals Develop standardized set of procedures for states to consider - not intended to be prescriptive Ensure consistency with IEEE 1547 technical standards Ensure participation from major stakeholders: –PJM, state PUCs, state energy offices, NREL, DG providers & associations, utilities, NEMA were all active –Others participated occasionally, e.g. Chesapeake Bay Commission, Drexel University

5 MADRI Model Procedures Based on FERC and NJ Rules NJ Interconnection Rules (October ’04) –Paved new ground for expedited review procedures –Introduced timelines for utility reviews –Integrated testing & certification requirements FERC Small Gen Rules (May ’05) –Culmination of multi-year national stakeholder process –Included a number of key aspects of the NJ rules –In spite of limited jurisdiction, rule represents broad consensus and is good blueprint for states

6 MADRI Procedures Overview Four Categories of Review –Level 1 <10kVA Inverter Based/Certified –Level 2 <2 MVA Inverter Based/Certified –Level 3A – DG Does Not Export Power –Level 3 – Up to 10 MVA Reference to PJM Small Generator Technical Requirements (IEEE 1547 Based) Procedures to Connect to Area Networks Criteria for Testing & Certification Two Standard Interconnection Agreements –10 KVA and Less –> 10 KVA to 10 MVA Expedited

7 MADRI Summary General Interconnection Provisions… Applicability – 10MVA or less operating in parallel Fees – “nominal” fee for <10kVA, cost based for rest Technical Standard – “PJM Small Generator Technical Requirements” (essentially IEEE 1547) Isolation Device – must be readily accessible lockable, visible-break (or customer provides lockbox for utility access) Multiple DG Units – interconnection request evaluated based on total aggregate capacity Increase in Capacity for Existing System – new agreement based on total aggregate capacity

8 MADRI Summary Level 1 Procedures (What qualifies) <10kVA Inverter-based Certified interconnection equipment Does not connect to Area Network

9 MADRI Summary Level 1 Procedures (Technical Screens)

10 MADRI Summary Level 1 Procedures (Timeline)

11 MADRI Summary Level 2 Procedures (What qualifies?) <2 MVA Projects that fail Level 1 review Inverter-based Certified interconnection equipment Does not connect to Area Network

12 MADRI Summary Level 2 Procedures (Technical Screens)

13 MADRI Summary Level 2 Procedures (Timeline)

14 <50kVA Certified inverter Reverse power relays < 5% of max load on circuit or 50 kVA No new facilities < 10 MVA All generation on circuit < 10 MVA Reverse power relays Dedicated transformer No new facilities MADRI Summary Level 3A Procedures (What qualifies?) Area NetworkRadial Feeder

15 MADRI Summary Level 3A Procedures (Technical Screens) <10kVA to Area Network  Same as Level 1 10kVA – 50 kVA to Area Network  Same as Level 2 Connects to radial feeder  Same as Level 2

16 MADRI Summary Level 3A Procedures (Timelines) <10kVA to Area Network  Same as Level 1 except EDC has an additional 20 days to conduct Area Network impact study 10kVA – 50 kVA to Area Network  Same as Level 2 except EDC has an additional 25 days to conduct Area Network impact study Connects to radial feeder  Not specified – most of assessment expected to be related to looking at potential fault currents

17 MADRI Summary Level 3 Procedures (What qualifies?) Projects from 2 –10 MVA Projects less than 2MVA that:  Are not Certified  Are non-inverter based Projects not approved under Level 1, Level 2 or Level 3A reviews

18 MADRI Summary Level 3 Procedures (Elements of review process) Scoping Meeting to review interconnection request and existing studies Feasibility Study to review short circuit capability limits; identify thermal or voltage limits; grounding requirements; non-binding estimate of facilities cost System Impact Study to evaluate the safety and reliability impacts Facilities Study to estimate cost of equipment, engineering, procurement and construction work

19 MADRI Summary Level 3 Procedures (Timeline Elements) Interconnection Request – EDC sends notice on status of completeness 10 days after receiving request, if deficient, customer has 10 days to complete Scoping Meeting held within 10 days of receiving notification of completed interconnection request Feasibility Study agreement provided within 5 days of determination that it is necessary System Impact Study agreement provided within 5 days of determination that it is necessary Facilities Study agreement provided within 5 days of determination that it is necessary

20 Presumption is That it Should be Safe to Connect to Area Network if: –No Export of Power –DG<5% of Peak Load on Network Up to 50 KW Burden is on Utility to Conduct Study Showing That DG is Not Safe Study is at Utility Expense MADRI Summary Connecting To Area Networks

21 MADRI Made Significant Progress in Integrating 1547 Technical Requirements with Testing Requirements and Clearly Defines Certification Requirements to Qualify for Expedited Reviews This Integration is Key to Successful Implementation of Screens and Will Help Ensure Greater Standardization Among State Interconnection Procedures MADRI Insight Testing & Certification

22

COMPARISON OF KEY DIFFERENCES BETWEEN MADRI & FERC INTERCONNECTION REQUIREMENTS PREPARED BY BRAD JOHNSON 6/08/05

24 Comparison of MADRI and FERC Interconnection Technical Requirements 1.Isolation Device – Required. Must be accessible, lockable visible break type device; alternatives for customer to use lockbox to provide access 2.Generation may not cause protective equipment to exceed 90% of short circuit rating 1.Isolation device not specifically required 2.Generation may not cause protective equipment to exceed 87.5% of short circuit rating MADRI < 10 MVAFERC < 20 MVA References PJM Small Generator Minimum Technical Requirements – Based on IEEE 1547 With Clarification Notes References IEEE 1547

25 Comparison of MADRI and FERC Interconnection Processes Level 1 (<10kVA) & Level 2 (<2 MVA) interconnections require inverters & Certified interconnection equipment No impact assessments by EDC for Level 1 & 2. Limited impact assessment for 3A Level 1& 2 & 3A must satisfy impact technical screens Level 3A ( <10 MVA) Provisions for Area Networks & non-exporting systems Level 3 – study process for all other systems < 10 MVA (virtually identical to FERC/PJM) Streamlined application for <10kVA requires Certified inverter based equipment Super-expedited for Certified interconnection equipment < 2 MW (does not have to be inverter based) Study process for all other systems < 20 MVA (virtually identical to MADRI/PJM) No impact assessments for 1 & 2 above but must satisfy impact technical screens No provisions comparable to MADRI Level 3A MADRI (<10 MVA)FERC (<20 MVA)

26 MADRI Comparison Level 1 Timelines

27 MADRI Comparison Level 2 Timelines

28 Comparison of MADRI & FERC Interconnection Fees FERC Interconnection FeesMADRI Interconnection Fees 1.Level 1 Interconnection Request  Nominal fee (<$100) 2.Level 2, 3A, 3 Interconnection Request  Cost based fee  To be established by appropriate state regulatory body 3.Level 3 Studies  Interconnection customer responsible for all costs incurred for any interconnection studies 1.Level 1 Interconnection Request  $100 processing fee 2.Fast Track Process (Comparable to MADRI Level 2)  $500 processing fee 3.Level 3 Studies  Lesser of $1,000 deposit or 50% of estimated cost of feasibility study at time of interconnection request  Interconnection customer responsible for all costs incurred for any required interconnection studies