GEO AIP-2 Drafting a Plan for AIP-2 Test and Demonstration January 2009.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
Advertisements

GEOSS Architecture Implementation Pilot Phase 2 (AIP-2) Name of Working Group Name of Scenario May 4-8, 2009 The Palazzo dei Congressi di Stresa Stresa,
AIP-2 Demo Capture Workshop 4/5 May 2009 The Palazzo dei Congressi di Stresa Stresa, Italy.
AIP-5 Demo Capture Guidelines. Demonstration of Advances Topics –Scenarios and non-scenario demos are encouraged (roughly a demo per WG, regardless if.
AIP-6 Demo Capture Guidelines. Demonstration of Advances Topics –Scenarios and non-scenario demos are encouraged (roughly a demo per WG, regardless if.
GEO Task AR AIP-2 Kickoff Workshop Mid-term plenary NCAR Mesa Laboratory September 2008.
GEOSS Architecture Implementation Pilot, Phase 3 - Call for Participation - George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC December.
GEOSS Architecture Implementation Pilot Water Information Services with GEOSS Interoperability Arrangements George Percivall Open Geospatial Consortium.
High level summary and recommendations from AIP-3 George Percivall Open Geospatial Consortium Task lead AR-09-01B ADC-16, May 2011.
GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 4 (AIP-4) Nadine Alameh, George Percivall, Ingo Simonis Open Geospatial Consortium (OGC) GEOSS.
Natural Disaster Management Project Pakorn Apaphant/Hiromichi Fukui Project and Application Subgroup Proposed to WGISS 23 Hanoi, Vietnam May 21-25, 2007.
AR – Issues for Attention Tactical and Strategic Guidance documents – what is the agreed approval/ publication process? –Strategic Guidance will.
GEO Work Plan Symposium 2011 Days 2 & 3 ID-01 Data Sharing.
SIF Status to ADC Co-Chairs
Standards and Interoperability Forum: Status, Issues & Plans GEO Architecture and Data Committee Kyoto, Japan 9 February 2009 Siri-Jodha Singh Khalsa.
IN-05 Gap Analysis Definition Identify and address critical gaps in observational networks that reflect, in particular, the needs of developing countries,
GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.
GEOSS Common Infrastructure (GCI)
Architecture Priorities. Why do stakeholders perceive that the architecture does not meet needs? Users are not seeing what they expect The interaction.
Session 8. GEOSS requirements, functions, architecture Session Feedback Presenter: Max Craglia.
NCI Clinical Trials Reporting Program CTRP User Meeting May 2, 2012 Gene Kraus CTRP Program Director.
A Global Agriculture Drought Monitoring and Forecasting System (GADMFS) Meixia Deng and Liping Di.
Global Earth Observation System of Systems (GEOSS) Architecture Implementation Pilot (AIP) Air Quality and Health Working Group Stefan Falke, Rudy Husar,
GEOSS Community Portal Recommendations GEO IIB Meeting, Frascati, Italy February 23-25, 2015 Ken McDonald/NOAA
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
1 G A A new Document Control System “A new system to manage LIGO documents” Stuart Anderson Melody Araya David Shoemaker 29 September, 2008
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 6 (AIP-6) Bart De Lathouwer Open Geospatial Consortium (OGC) GEO-X Plenary, Geneva, Switzerland.
ST Kick-off Promoting Awareness and Benefits of GEO in the Science and Technology Community Douglas Cripe – GEO Secretariat Frascati/Brussels
Alan Edwards European Commission & GEOSS Data Sharing Task Force Co-Chair 5 th GEO Project Workshop London, UK 8-9 February 2011 The GEOSS Data Sharing.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR Point.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
GEOSS Architecture Implementation Pilot AIP February 2011 GeoViQua First Workshop George Percivall Open Geospatial Consortium Task Lead AR-09-01B - AIP.
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
ESA/FAO Contribution STATUS & PLANS ADC Full Committee Geneva 1 March 2007.
ENV proposal meeting, Geneva, Sep. 24, GCI Presentation Joost van Bemmelen, ESA
1 Geospatial Enterprise Architecture Community of Practice Development of a Federal Enterprise Architecture Geospatial Profile Update for the Federal Geographic.
SIF Status to ADC Co-Chairs Siri Jodha S. Khalsa Steve Browdy.
GEOSS AIP-2 Overview AIP-2 Societal Benefit Area Working Groups: Air Quality & Health Disaster Response Biodiversity and Climate Renewable Energy Air Quality.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall September 2008.
WGISS-40, Harwell, Oxfordshire, UK, Sept. 28-Oct. 2, 2015 GEO/CWIC Interactions Ken McDonald/NOAA CWIC Session, WGISS–40 October 1, 2015.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
Natural Disaster Management Project Pakorn Apaphant Project and Application Subgroup WGISS 24 DLR, Oberpfaffenhofen, German October 15-19, 2007.
1 Using the GEOSS Common Infrastructure in the Air Quality & Health SBA: Wildfire & Smoke Assessment Prepared by the GEOSS AIP-2 Air Quality & Health Working.
Initial Operating Capability Task Force (IOCTF) Status Briefing September 21, 2008.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 28 February & 1 March 2007.
Architecture Task AR Status Presented to the July Meeting of the GEO and Architecture and Data Committee Dr. Thomas C. Adang AR Point.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
1 Using the GEOSS Common Infrastructure in the Air Quality & Health SBA: Wildfire & Smoke Assessment Prepared by the GEOSS AIP-2 Air Quality & Health Working.
Implementing GEOSS architecture with-and-for Users George Percivall Open Geospatial Consortium Task lead AR-09-01B.
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
GEOSS Common Infrastructure Slides prepared by Alessandro Annoni, JRC Jay Pearlman, IEEE and GEO Secretariat.
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
Introduction to the GEOSS Registries: Components, Services, and Standards Doug Nebert U.S. Federal Geographic Data Committee June 2007.
George Percivall, Open Geospatial Consortium
Steve Peedell Joint Research Centre
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2)
George Percivall September 2008
GEOSS Web Portal Working Group
Closing Plenary.
AIP-7 Demo Capture Stu Frye and Pat Cappelaere
Workshop on Gap Analysis and Prioritization
Plan for AIP-3 Test and Demonstration
4 Years Milestone plan – (Company Name)
4/5 May 2009 The Palazzo dei Congressi di Stresa Stresa, Italy
Air Quality Data Systems and the GEOSS Architecture
Presentation transcript:

GEO AIP-2 Drafting a Plan for AIP-2 Test and Demonstration January 2009

AIP-2 Deliverables Demonstration –Demonstration of community Scenarios implemented through transverse Use Cases –Demonstrations to be recorded and made available via WWW. Engineering Reports To be considered for GEOSS Best Practice Registry –Community of Practice Scenarios, –Transverse Technology Use Cases –AIP-2 Summary Report Persistent Exemplars –Registered services (continuous operation) with 99% availability (~7 hours down time a month); on a reliable network; plan for performance scaling –Nomination to operational task (AR-09-01a)

AIP-2 Test, Integration and Demo 1.Register Resources –Services –Clients 2.Testing at service level –Organized around Technology Use Cases –First, Services indicate they are ready in response to near term call –Then, Clients initiate and lead testing –Concentrate testing in two intensive periods. 3.Testing at the demo level –Organized around SBA Scenarios –Build on the use case testing 4.Demo Capture Important to recognize that testing is already on-going. The testing here is for completeness and for integration.

Phasing of Test, Integration and Demo Scenario Development Use Case Development Resource Registration Use Case testing – led by clients Scenario Testing Scenario Capture 1 st Call 2 nd Call Test Log ready Unit Test Period1 Unit Test Period 2 Scenario Testing Demo Capture Event Update Storyboards JANFEBMARAPRMAY

Test Log Public place to view status of tests planned and results Plan shows which services are to be tested by specific clients Client testers update log with test results Test Discrepancies with status updated by both clients and service providers.