GEOSS ADC Architecture Workshop Disaster Management February 5 th, 2008 Guy Séguin Canadian Space Agency

Slides:



Advertisements
Similar presentations
DISASTER REDUCTION AND CLIMATE CHANGE ADAPTATION
Advertisements

A Guide to Localizing the Hyogo Framework for Action
Global Platform for Disaster Risk Reduction, June 2009, Geneva Special event: Accessing space-based information to support disaster risk reduction,
© GEO Secretariatslide 1 Space-based information for reducing loss from disasters Veronica Grasso GEO Secretariat
GEOSS AIP-2 Development Interim Design Review Disaster WG Stu Frye Didier Giacobbo Alexandre Robin (as alternate) Valencia 2 December 2008.
Integrated Risk Management Components in the GEO Architecture Implementation Pilot Phase 2 (AIP-2) ICT for Earth Observation Anwar Vahed.
GEOSS ADC Architecture Implementation Pilot 2 Disaster Management Scenario Caribbean Flood Pilot Sensor Web Report from the AIP2 Kick-off Meeting Boulder,
Reducing Vulnerability to Drought through Mitigation and Preparedness Report to the Inter-Agency Task Force for Disaster Reduction Sixth Meeting Geneva,
Namibian Flood SensorWeb Pilot Project Status Dan Mandl 9/28/09.
Natural Disaster Management Project Pakorn Apaphant/Hiromichi Fukui Project and Application Subgroup Proposed to WGISS 23 Hanoi, Vietnam May 21-25, 2007.
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
© GEO Secretariat Disasters SBA Status of Tasks DI-06-05, DI-06-06, DI New tasks proposed for the WorkPlan G. Rum - 05 September 2006.
1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
DS-01 Disaster Risk Reduction and Early Warning Definition
DI Expand the use of meteorological geostationary satellites for the management of non-weather related hazards. Conduct an assessment of meteorological.
Slide: 1 Guy Seguin (CSA) CEOS Disaster SBA Team Coordinator Priority Actions GEO Disaster WP
© GEO Secretariat Virtual Constellations..new planning process which takes account of international users and their requirements from the outset of satellite.
Remote Sensing at the service of Natural Disasters Warning: the Contribution of the Supersites Concept Professor Stuart Marsh Co-Chair GEO Institutions.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
Slide 1 The Role of Remote Sensing in Disaster Management, Dec. 11, 07, G. Séguin Use of Satellites for Risk Management A key task of the GEO Workplan.
World Meteorological Organization Working together in weather, climate and water Report by the president of RA IV (North America, Central America and the.
Agencies’ response to DRM pilot EO data requirements Ivan Petiteville (ESA, Chair WGDisasters) Stéphane Chalifoux (CSA, Vice-Chair WGDisasters) Andrew.
A Roadmap for the GHCP The GeoHazards Community of Practice (GHCP) Presentation developed during the First GHCP Workshop, Paris, January 18-21, 2010.
RADARSAT Constellation  Evolution of the RADARSAT Program (i.e. 3 satellites – 32 minutes separation);  Average daily global access of land and oceans.
Canadian Space Agency IPY Planning Yves Crevier Canadian Space Agency Space Task Group – IPY Sub-Committee on Observations SAR Coordination Meeting, March.
World Meteorological Organization Working together in weather, climate and water Adaptation to Climate Change Impacts on Coastal Communities M.V.K. Sivakumar.
International Charter Space and Major Disasters 2011 NOAA Satellite Direct Readout Conference Miami, Florida April 4, 2011 Monitoring and Management Support.
World Meteorological Organization Working together in weather, climate and water Panel session on use of satellites in disaster response and mitigation.
Global Inter-agency IPY Polar Snapshot Year (GIIPSY): Goals and Accomplishments Katy Farness & Ken Jezek, The Ohio State University Mark Drinkwater, European.
Weather, Water, Climate Services Supporting Sustainable Development Jerry Lengoasa Deputy Director General Oslo, May 2014 World Meteorological.
The role of the GEO Geohazards Community of Practice for the Supersites Initiative The role of the GEO Geohazards Community of Practice for the Supersites.
CEOS Response to the GEO Disasters Task Guy Seguin CSA CEOS SIT-28 Meeting Hampton, Virginia, USA Date.
# 1 CEOS Agencies’ Support to Disaster Risk Management (DRM) Stephen Briggs, ESA Earth Observation Programmes.
An activity under GEO DI-09-02b (Regional End-to-end Demonstrations) Presentation to WGISS 27 Karen Moe/NASA 13 May 2009 Charts updated from CDERA National.
Special Session II Increasing Investment for Disaster Risk Reduction.
IGOS Geohazards: Status and perspectives 3rd International Geohazards Workshop Frascati, ESRIN, 6th November 2007 Hormoz Modaressi Director IGOS Geohazards.
DI Promote the cooperation of national and international agencies towards a multi-hazard approach to address more effectively and systematically.
REDUCING DISASTER RISK THROUGH EFFECTIVE USE OF EARTH OBSERVATIONS Helen M. Wood Chair, U.S. Subcommittee on Disaster Reduction August.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Status of Current WGISS GEO Tasks and Actions Satoko Horiyama MIURA JAXA Mission Operation System Office of Space Mission Application Directorate (MOSS)
STATUS REPORT ON WA TASK DESCRIPTION: “Organize workshops on water observations, encompassing space-based, airborne, and in-situ observing systems,
Use of Satellites for Risk Management A key task of the GEO Workplan Dr. Guy Séguin Canadian Space Agency Task co-leader Presentation to the ITU-GEO Workshop:
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
Recommendations from the GEO TASK AG Community of Practice Image: NASA, ASTER Science Team Minnesota Kansas Germany Bolivia Thailand Brazil.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda Item # CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
GEO and GEOSS… GEO is an Intergovernmental Group –60 Nations –European Commission –43 Participating Organizations With a Single Objective: GEOSS –To establish.
Slide 1 Use of Satellites for Risk Management Presentation to WGISS-32 Budapest, 27 September, 2011 Dr. Guy Séguin (CSA) Co-leader, GEO Task DI CEOS.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda 11 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th –
ATT Contribution to GEO Archive Task Team WGISS – 22 Sep 11 – 15, 2006 Annapolis, USA.
Committee on Earth Observation Satellites Plenary Agenda Item #3 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015.
Moving Towards GEOSS Vice Admiral Conrad C. Lautenbacher, Jr., U.S. Navy (Ret.) Under Secretary of Commerce for Oceans & Atmosphere Future National Operational.
WA Task Report Prepared by Rick Lawford May 29, 2008.
CEOS WGISS-40 COSMO-SkyMed Ground Segment & other Ground Segment Developments Richard Lowe – Group Manger, EO Systems & Operations.
5th GOES Users’ Conference, New Orleans, January 2008 Geostationary satellites in a WMO perspective Jérôme Lafeuille WMO Space Programme World Meteorological.
Assessments ASSESSMENTS. Assessments The Rationale and Purpose for Assessments.
CEOS DRM Flood Thematic
CEOS Response to GEOSS Water Strategy
Floods WHY? Most prevalent global disaster – largest number of events and largest number of people affected, greatest economic impact; EO can track.
Global Agricultural Monitoring Task AG 0703 Progress
Break out group - Dominica
CEOS Acquisition Requirements and Capacities
GEO strategic directions in support of Disaster Risk Management
ECMWF, GEOGlows, and support for developing countries
The Sendai Framework Data Readiness Review 2017
WGCapD Perspectives of Work Plan –
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
WG Disasters Observation for Disasters
Freshwater from Space Discussion -Next Steps
CEOS strategy for GFOI Phase 2
Presentation transcript:

GEOSS ADC Architecture Workshop Disaster Management February 5 th, 2008 Guy Séguin Canadian Space Agency

2 Outline Background Objectives Disaster Cycle Phase-by-Phase Approach Methodology Example – Floods Issues Identifying Scenarios for ADC

Background GEO Workplan includes task to address Use of satellites for risk management: DI In April 2007, CSA asked by GEO Secretariat to play a leadership role with UNOOSA in broadening scope and impact of task, ensuring development of a virtual constellation for risk management DI to address all four phases of disaster management: mitigation, warning, response and recovery and to examine user requirements and system architecture for a global multi-hazard approach UN-SPIDER recognizes the critical importance of compiling user requirements, and can serve as a bridge between space and disaster management communities

Background (II) CEOS currently reo-organizing its contributions to GEO to ensure coordination within each SBA New CEOS Disaster Working Group created in January and chaired by Guy Seguin All inputs to DI tasks of GEO workplan will be coordinated through this group New list of actions currently being elaborated focused on three main activities: development of architecture to meet user needs, technology demonstrations to increase user awareness and pilot projects to demonstrate operational feasibility

5 Objectives Help space community understand specific needs of disaster management community, as well as operational mechanisms and interactions (local, provincial and national) Collect information on needs of users to establish requirements Establish virtual constellation of satellites to address each phase of disasters, working through existing bodies such as International Charter and CEOS

6 Disaster Cycle

7 Tailored Solutions for Each Phase For Response, broaden International Charter by inviting GEO Member states to designate authorized users; encourage new Charter membership For Mitigation/Warning/Recovery, use pilot project approach with selection of regional champions that can integrate satellite data; organize volunteer contributions on mission-by-mission basis; define global baseline imaging scenario

Work to date System Architecture Group (CSA Chair - Mtgs in June and October) –Participants from ASI, CSA, DLR, ESA, NASA, UN-SPIDER, International Charter, GEO Secretariat, Athena Global User Requirements Group, in conjunction with UN- SPIDER (UNOOSA Chair - Mtgs in June and October) –25 participants from range of civil defense organizations, international organizations (ISDR, UN-OCHA, CDERA, ADPC), space agencies and private sector – presentations to broader conference and validation of results (80 people)

Outcomes to Date Consensus on methodology to collect user requirements for multi- hazard disaster management for all phases Buy-in to process from large representative user body (including civil defense, international organizations) Commitment from space agencies to provide support to modeling scenarios, and to work towards solution in context of CEOS Negotiations underway with International Charter: –Mechanisms for broadening of Authorized User community (those that activate the Charter during response) to include all GEO Member States currently under discussion –Advice sought on how to better access archived data to support other phases (beyond response)

User requirements… Establish user requirements (for each disaster type and phase): –Identify region of interest (priority areas) –Identify target characteristics (what do we want to see?) –Identify temporal revisit period –Establish timeliness/latency requirements –Identify end use for data by intermediate user (application, service, etc)

Establish architecture requirements (for each disaster type and phase): –What type of satellite data? (SAR, optical, altimetry, etc) –Number of satellites and coverage mode? –Ground segment –Application Roll-up across all disaster types to establish overall requirements of virtual constellation Simulate architecture options Architecture options…

©The World Bank – Natural Disaster Hotspots: A Global Risk Analysis Example – Floods Starting Point – World Bank Risk Analysis

User Requirements Roll-up – Floods Phase Requirements MitigationWarningResponseRecovery Target/data Topography Hydrological models Historical atlas of floods Flood models/simulations New infrastructure, houses Land-use classification Monitoring of dikes and dams Precipitation Water level (rivers, lakes) Weather forecast Soil moisture Snow-water equivalent Signs of catastrophic infra failure Water level (rivers, lakes) Extent of flood Status of critical infrastructure Weather forecast Status of critical infrastructure Damage assessment Flooded areas Revisit 1 to 3 years (imagery) 5 to 10 yrs (topography) Daily or better during high risk period Daily in early morning; twice daily if possible Weekly (major floods) for several weeks to several months Timeliness WeeksHoursHours (2-4 max)1 day End use Integration in land use planning/zoning Baseline for response Decision support for warnings & evacuation Situational awareness Resource allocation support Initial damage assessment Tracking affected assets Charting progress

Architecture Requirements – Floods (I) Phase Requirements MitigationWarningResponseRecovery Data typeLow res DEM for flow rates (radar, stereo, laser) Higher res DEM (DTED-2 or better) for extent and location (radar, stereo, laser)_ Medium to high res (scale, other image sources, urban/rural) Optical or radar overlay (geo-coded, ortho-rect.) Archived imagery of previous floods Interferometric analysis of subsidence (and other changes) Met sats Precipitation radar X, C or L-band SAR 10-50m data Passive microwave (for soil moisture) Hi res optical upstream for slow flood Altimeters Interferometric analysis of subsidence (and other changes) Precipitation radar X, C or L-band SAR 10-50m data (extent of flood – large areas) ; higher res radar and optical for urban areas or flash floods (damage) Met Altimeters Med to high res optical and radar Interferometric coherent change maps Coverage and revisit Continuity of existing optical and radar missions (need to develop background mission coverage in areas on flood map) Daily coverage in regional areas affected Pre-dawn or dawn required Daily early morning coverage in regional areas affected Continuity of existing optical and radar missions

Architecture Requirements – Floods (II) Phase Requirements MitigationWarningResponseRecovery Potential data source SRTM (background) SRTM DTED-2, Tandem-X DTED-3, Cosmo, etc…. GPM 3-4 radar satellites on same orbit; 2-3 satellites using same frequency in same orbits Optical: comparable? 3-6 radar satellites on same orbit Optical hi res (2 or more) 2 radar satellites using same frequency Optical hi res (1) Ground segment (need for development) Using existing ground segmentsFast download, fast tasking (northern/southern stations, geostationary com links) Very fast download and tasking (northern/southern stations, geostationary com links) Using existing ground segments ApplicationIntegration with risk map Land cover maps Information used for bulletins and evacuation, warnings Situational awareness products Tracking affected assets

Example of one day coverage of selected satellites (Envisat, ERS-2, RADARSAT-1 and ALOS) Issues Insufficient frequency of observations of various satellite types (radar, optical, altimeters, etc) Harmonization of platforms

Proposed Way Forward Work with International Charter to define process to broaden and simplify access to all GEO Member States during disaster response Within CEOS context, ensure contributions from space agencies towards pilot projects Identify champions within each disaster community of practice and choose pilot projects on a regional level for different disaster types to demonstrate the effectiveness of satellite imagery for disaster mitigation, warning and recovery

Identifying Scenarios Last year, the ADC developed four disaster-related scenarios: Hurricane warning: used archive data volcano eruption: used archive data sub-Saharan wildfire: used EO1 Hyperion data acquisition oil spill response:

Identifying Scenarios Two pilot projects are being considered by CEOS Disaster Working Group: –Flood management in South America –Global wildfire response Next step consist in the identification of region of interest and an implementation of a multi-hazard approach across all phases of disaster management Proposals for 2008 are: –Multi-Hazard & phase approach for Hurricane strikes –Expand Sentinel-1 fire-Hazard to other regions

Multihazard Management in the Caribbean 1/2 Summary: satelllite data is used to support a multi- hazard approach to risk management in the Caribbean (16 countries) – support to DI Context: CDERA, a multinational organization with disaster preparedness and response responsibility for 16 nations, works with the GEOSS to map out risk zones and prepare response plans in preparation of a hurricane/flood, landslide and volcano/earthquake Event: hurricane strikes island and causes serious landslides

Multihazard Management in the Caribbean 2/2 Actions –Mitigation: topographic data, demographic data, Hydrological model, critical infrastructure –Warning: Hurricane Watch, meteorological data/precipitation –Response: Planned acquisition from disaster Charter –Recovery: Disaster Charter data Lead: CEOS disaster team. POC Stu Frye GSFC

Global Wildfire Management Summary: satellite data used to predict high-risk zones for wildfires throughout a calendar year on a global basis Context: supporting DI-06-13, satellite data is integrated with in-situ information from GEOSS sources to assess fire risk and prevent losses Event: a fire season, south west US or Australia (one calendar year) Actions: Use the Sentinel Asia model and Sub- Saharan African Wild fire scenario of 2007 Lead: EO1 team/CEOS disaster team (POC. Steve Ungar)