CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.

Slides:



Advertisements
Similar presentations
T1 status and plans INFN Genova November 2014 Collaboration Meeting.
Advertisements

The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Overview of basic issues.   The design of the (Outer) Tracker Upgrade for phase 2 has been ongoing for more than 4 years  So far the (implicit) assumption.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
B. IlleWACH /11/20021 WELCOME to WACH I am happy to introduce this ‘Workshop Analysis Calorimetry H4’ dedicated to M0’ data analysis and the.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
A Screwdriver Is All You Need Ask most people what they know about computers, and they’ll tell you that a PC is a complex, sealed box full of confusing.
The RPC Closed loop Gas System Slides from Bianco and Guida.
Status of NA62 straw electronics Webs Covers Services Readout.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
December Status of MRS photodiodes ND280 Convener’s Meeting, 9 June 2006 Yury Kudenko INR, Moscow.
25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Shutdown plans for the FPIX 27/01/2009 Mauro Dinardo University of Colorado – Boulder, USA Mauro Dinardo University of Colorado – Boulder, USA Pixel General.
Tracker Goals o Main issue is to be able to run cold as more radiation is accumulated. o Due to “uncontrolled” humidity behavior, our present limit is.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
MICE Spectrometer Solenoids Step IV running
Planning for Proto-DUNE PD Installation and Cabling at CERN
University of Colorado – Boulder
Detector building Notes of our discussion
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
RICH Status from last RICH meeting
Structure and etc Shoji Uno (KEK) at B2GM
Renovation of the 45-year old PS magnets
DT Infrastructure: LV, HV, Gas
10/month is the present production rate 2 FTE + sporadic contributions
Radiation Laboratory Meeting
FNAL Production Experience
VELO-meeting January 25, 2007 Sub-projects: SX & SX
EUDET Extended SC meeting 31 August 2009
Presentation transcript:

CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091

Schedule MondayTuesdayWed.ThursdayFridaySaturdaySunday 2-8 Mar +Z extraction and transportation 9-15 Mar+ Z: Tubes / AOH / Rear foot / Baseline check / Full re-test Mar – Z extraction and transportation Mar – Z: Repair / Tubes / AOH / Rear foot / Baseline check / Full re-test + Z Re-test / Survey 30 Mar 5 Apr +Z packing / transport + Z insertion (2 days)-Z Re-test / Survey – Z packing / transport 6-12 Apr– Z insertion (2 days)Detector CheckOutEaster brake!!! Apr Last CO day! CMS +Z START CLOSING! Very tight schedule ( a little bit more than 4 weeks!!!!) to extract, cross a border, repair, improve, recheck a detector! 4/20/092

Motivations Silicone tubes have been used inside the forward pixel detector to make the connection between the Aluminum pipes and the Half-Disk hose barbs They needed to be replaced with more robust tubes Old Silicone tubes are rated up to 1.7 bars New Silicone tubes are rated up to 10 bars  the limit will be set by something else. We will be able to run at 2.4 barg instead of 1.9 barg (big difference in terms of effectiveness of establishing flow) 1.Replace the Silicone tubes with new tubes rated up to 10 bars 4/20/093

Motivations 2.Fix 6% of the detector which broke during operations at P5 During the July transportation/insertion 1 high voltage wire-bond was broken and we lost immediately one module with 8 Read-Out Chips (ROCs) (<1%) After 1 week that the detector was inserted last July a short developed on a power line inside the half cylinder making impossible to operate 1 petal of the detector which has 135 ROCs (~3%) After 1 month from the insertion we had another short on a high voltage line which involved 93 ROCs (~2%) A little bit later the last incident another module started to give a low signal on the output line making it impossible to operate 24 ROCs (~0.5%) We were eager to understand what was going on and especially we wanted to know as soon as possible if there was a design flaw that could lead to many more problems! Unfortunately, all these problems happened on the –Z side (the +Z side was still perfect) and the schedule forced us to extract the +Z side first, giving us little time to intervene on both sides in case all these problems could be the sign of something major. Luckily, that was not the case! 4/20/094

5 We wanted to put a “Cold Finger” to perform a thermal contact between the optical laser diodes and the cooling pipes in order to better stabilize the temperature and thus the analog output signal during operations. The humidity reading at P5 has been difficult to interpret ! We convinced ourselves that when the magnetic field was turned on, due to some movement caused by the field, the pixel volume was not sealed anymore. This would prevent us to run the detector below -8 on +Z-side and below +2 on the –Z-side. This problem will be addressed by the CERN experts but, to make sure we understand correctly the humidity in the pixel volume, we wanted to replace the humidity sensors and place them in a different position to have more reliable dew point measurements. Motivations 3.Operational stability and humidity monitor improvements Replacing the silicone pipes, understand and repair the problems with the detector, improve the humidity reading and the stability of the output signal HAD TO BE DONE IN 1 MONTH! No mistakes were allowed and a careful planning had to be done!!! 4/20/09

Extraction Pixel platform Pixel table Base frame The pixel system has been designed to allow extraction in case it needs to be repaired during the shutdowns! The concept worked really well! We also practiced procedures and methods for future removal when the detector will be irradiated and time constraints will be important to minimize the exposure to radiation! 4/20/096

Repair/Commissioning 1.The first 10 days we worked on the +Z side. The silicone tubes were substitute, the cold fingers were placed and the humidity sensors where changed. Both half cylinders were then re-commissioned and almost ready to go back to P5, in the mean time everybody was waiting for the –Z side to understand what was going on there… 2.As soon as the –Z side was back at CERN we all wanted to know what were the problems and we found out that the power cable in the damaged half cylinder were damaged under Damaged wires a heat shrinking plastic placed to keep together the cables of each petals! We removed all the heat shrinking plastic from all the wires, check them to see if there were any other wires damaged, measured the resistance of all the cables and re-made the ones that were not passing a very tight resistance criteria and then re-test them all! 4/20/097

Repair/Commissioning 3.We then re-tested the +Z side after the cables checkout to have it ready for the P5 reinsertion, while in the mean time we were still working on the –Z side! 4.We realized that the high voltage problem was due to a wire that was pinched by a board inside the half cylinder that with time developed in a short and we fixed it! 5.We substituted the module with the broken wire-bond. 5.Finally we tried to tackle the last problem of the module that had a very low output signal. Unfortunately this problem appear only in a certain temperature range ( very strange! ) and since the module is in a delicate position we decided to leave it as it is (~0.5%of the detector). It should work when we’ll go to low temperature! 7.We shipped and reinserted the +Z side while we were still re-commissioning the –Z side. 8.Finally we shipped and reinserted also the –Z side 2 days before Easter brake! 9.During the final commissioning at P5 we had our last emergency. In fact one of the cooling tube, outside the detector, had a small hole caused probably by a mishandling! In one day the CERN team was able to do a fantastic job and fixed it, allowing us to finish the detector checkout just few minutes before Easter brake!! 4/20/098

Conclusions In the last few months the pixel community made a huge effort to improve significantly the safety of the detector and to repair and make it more stable after the operational experience at P5 from July to December. We carefully planned in January and February all details to make this delicate repair operation a success. In March and April we then executed the plan methodically in a professional way. Now the detector is safely back in place and in much better shape (>99.5% efficient)! We feel much more confident in operating the detector now that we know why we had all those problems! We are ready now to take some data as soon as the beam will be available! 4/20/099

Added … from P5 to CERN 4/20/0910