CMS Tracker Week, CERN, 19-23 Apr 2004 22 Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.

Slides:



Advertisements
Similar presentations
CMS Week, CERN, June Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.
Advertisements

16 Jul 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
6/22/04 Slide 1 Hybrid Testing Status Lance Simms 6/22/04.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
04 Dec 2001CMS Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University and.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
22 Jan 2002Tracker Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Catania Production Center S.Albergo Universita’ & INFN Catania.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
Status Report on Bonding at Catania
FNAL Production Experience
Hybrid & Module Testing Status
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
Results from module testing
US Module Production Quality
FNAL Module Testing Status
Module Production Status in Florence
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
Bari production centre resp. M. de Palma
Hybrid & Module Testing Status
Module Testing at UCSB: Simulated Production 11-04
L.Fiore Gantry Meeting during the CMS TK week
Module Testing in Florence Carlo Civinini INFN-Florence
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Università di Catania and INFN – Sezione di Catania
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on the Catania Status Salvatore Costa Università di Catania and INFN – Sezione di Catania

22 Apr 2004CMS Tracker Week - Module Production2 Salvatore Costa - Catania Outline 1.Module accounting 2.Bonding: 1.Production rate 2.Bonding experience 3.Pull Test results 4.Failure analysis 3.ARCS & LT Tests 1.ARCS test analysis 2.LT test analysis 4.Usage of central DB 5.Logistics & transportation of modules

22 Apr 2004CMS Tracker Week - Module Production3 Salvatore Costa - Catania Module Accounting Module Type  TotalIB34IB12phi Received from Bari Gantry Bonded58 (51 in DB)2730 ARCS tested56 (47 in DB)2729 OK bad312 LT tested49 (0 in DB)2722 OK bad000

22 Apr 2004CMS Tracker Week - Module Production4 Salvatore Costa - Catania Production Rate Initially slow due to bonding commissioning ( we lacked long-standing experience with previous bonding jobs ), but now on schedule. To illustrate our progress…: –First box received, with 8 Modules, was completed (bonded + ARCS tested) 23 days after arrival –Last 2 boxes, with 9 Modules each, have both been completed within 2 working days after arrival Current bonding capability is 4-5 Modules/day Long Term keeps up with no difficulty with current incoming flux of ~1 9-Module box / week

22 Apr 2004CMS Tracker Week - Module Production5 Salvatore Costa - Catania Bonding Experience Became full-blown Bonding Center on 5 Dec 2003 –Previously designated Bond Repair Center Had passed official CMS Qualification Tests (“bond test # 1 & 2”) Bonding experience with previous experiments: none Equipment: –2 Hughes 2470-II bonders 1991, 1987 automatic but no Pattern Recognition or bond foot deformation feedback –1 ATV GM-100 pull tester manual  Machine downtimes: each time a new machine fault occurred that we had not seen before. Time spent to learn to locate the source of the fault, what action to take and with what procedures. Higher probability of bond failures or accidents

22 Apr 2004CMS Tracker Week - Module Production6 Salvatore Costa - Catania Bond Pull Tests Results 5g IB34 IB12phi sampling

22 Apr 2004CMS Tracker Week - Module Production7 Salvatore Costa - Catania Bond Failure Analysis 53 Modules bonds repairedunrepairable # modules affected %# strips affected %# modules affected %# channels affected % Totals Machine failures Bond foot misplacement to stick Pinholes (caused by bonding?) Operator mistakes Mishandling Wrong ref Wrong par (lifts, pinholes) (1)(1.9)(384)(1.11)

22 Apr 2004CMS Tracker Week - Module Production8 Salvatore Costa - Catania Bond PA-Sen in TIB L1&2 correct misplaced

22 Apr 2004CMS Tracker Week - Module Production9 Salvatore Costa - Catania ARCS Test Analysis All tests performed following the official TIB procedure ARCS 7.0 used for long time (7.1 installed & operational but not yet fully tested) Tony’s macro used initially, starting mid March Riccardo’s update (now v3.1.0) Flagging efficiency with Riccardo’s macro: ~ 100% Out of 53 good modules, 51 are grade A, only 2 are grade B –No IV problems –A total of 55 defective “strips” found over bonded strips 29 caused during bonding 26 pre-existing: Sen pinholes + APV-PA bond opens + Hyb faulty chan open chan

22 Apr 2004CMS Tracker Week - Module Production10 Salvatore Costa - Catania ARCS Analysis: IV We wrote a script which queries DB to compare measured IV with the Sensor one. We also implemented Temperature correction. NO IV problems up to now IV data not available for all the sensors

22 Apr 2004CMS Tracker Week - Module Production11 Salvatore Costa - Catania Long Term Test Analysis 49 modules tested with TIB Official Scenario (about 72 h) –Some modules retested with a 1-night scenario due to failure on the last record –First, cold & last records always recorded Some failures of the sw before Marco’s patch on I 2 C 1 failure due to DAQ problems with Lt_1.22 No failures since Lt_1.24 was installed Riccardo’s macro used for the analysis (now v3.1.0) No new defective strips appeared after LT test –From time to time some noisy strips appear and disappear

22 Apr 2004CMS Tracker Week - Module Production12 Salvatore Costa - Catania 3 Bad Modules In 3 Modules, all from the very last group of Modules received, we have observed plain failure of the ARCS Test after bonding (they had passed with flying marks the test upon arrival): 2 Modules ( , 303) fail Fast Tests’ Low Voltage test: I(V2.50) = ~850 mA (max 750 mA) –Bonds are among the best we’ve made, both mechanically and aesthetically –No visually evident damage from possible mishandling –ESD? 1 Module ( ) fails to power up the Hybrid –Damage to connector?  Has something changed in our working environment or procedures?  All these modules’ Hybrids are marked with Alan’s blue dot  Deep investigation needed to understand these problems

22 Apr 2004CMS Tracker Week - Module Production13 Salvatore Costa - Catania Usage of central DB Bonding data always timely uploaded to TrackerDB since the beginning for all ARCS & LT data, xFLAG has been used to produce XML files: 53 ARCS + 49 LT –XML files checked for consistency with root files and macro’s output No serious problems reported Only few root files need to be redone due to old ARCS bug in the header –86% of ARCS XML files already uploaded –LT XML files not yet uploaded

22 Apr 2004CMS Tracker Week - Module Production14 Salvatore Costa - Catania Logistics & Transportation No major problems with modules received from Bari –In first 2 boxes only the styrofoam blocks on the sides were too far apart, so Modules (on transport cradles) slipped out of their slots, but no damage to the modules resulted. Problem was quickly corrected in newer boxes –Some dirt (mainly small [fabric?] fibers) We blow a 1.5 atm air jet on Module before starting visual inspection Our storage space in clean room can hold ~8 more boxes (72 Modules), –After, better to start shipping to Pisa –or we will have to figure out how to carve out more storage space

CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania ARCS & LT Test The Catania CMS Module Production Crew S. Costa, N.Giudice, F.Noto, F.Raimondo, C.Sutera, C.Tuve Inspection, Test on arrival, Bonding S. Albergo, M. Chiorboli, M. Galanti, G. Gatto, A.Tricomi