Stage 2 Disinfectants and Disinfection Byproducts Rule Bruce Macler USEPA Region 9 415 972-3569 H Br Cl Bromodichloromethane.

Slides:



Advertisements
Similar presentations
Systems Working Together to Comply with New LT2/Stage 2 M/DBPRs KY & TN Wholesale.
Advertisements

IDEM Drinking Water Program Water Resources Study Committee.
Sean Lieske Drinking Water Compliance Team Leader Compliance Assurance & Data Management Unit Water Quality Control Division Colorado Department.
Regulatory Review Presented by: Joe Munson. Outline  New Employee/Office  Lead and Copper Reminder  Stage 2 Disinfection Byproduct Rule.
The Stage 1 Disinfectants/Disinfection Byproduct Rule.
The Ground Water Rule and You Advanced Small Water System Course PUBLIC HEALTH DIVISION Center for Health Protection, Drinking Water Services.
Nathan Saunders, P.E. Maine Drinking Water Program Public Water System Owner & Operator Responsibility.
Maine Laboratory Certification Program June 20, 2013 Jennifer Jamison Laboratory Certification Officer Phone: (207)
Ground Water Rule Review, Updates and Compliance Plans MSDH – Bureau of Public Water Supply Spring 2012.
Slide 1 Delta Water Quality: Implications for Utility Compliance with the Safe Drinking Water Act Edward G. Means III Sr. Vice President McGuire Environmental.
1 If you do not have a copy of the Stage 1 DBPR handouts, a copy can be downloaded from the Encounter Collaborative meeting page:
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
Storage Tanks Impact on Water Quality and Assessing Performance Presentation 3 April 2015.
1 Filter Backwash Recycling Rule FBRR Final: June 8, 2001.
Stage 2 DBP Plan Workshop May 2013 Janice Thomas, CDPH Sonoma District, Drinking Water Field Operations Branch.
1 Long Term 2 Enhanced Surface Water Treatment Rule – LT2 Mark McIntire Drinking Water Program SDWWA Water Seminar February 7, 2006 Please ask questions.
Distribution System Control Strategies.  Tank Management/Operations  Flushing  Rerouting Water  Others  optimizing existing booster chlorination.
Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground.
Assessing Plant DBP Performance Using the DBP-CPE Warren J. Swanson, P.E RMSAWWA/RMWEA Annual Conference Grand Junction, Colorado Schmueser gordon.
Leah A. Guzman Environmental Program Specialist Drinking Water Program Alaska Department of Environmental Conservation Sustained Compliance—What It Means.
Proposed Rule for Preventive Controls for Animal Food 1.
Monitoring Plan Template
Buckhorn Disinfection Byproducts / Backwash Disposal Project Board of Directors Meeting June 14, 2012.
The Stage 2 Disinfection By-Products Rule DoD/EPA State Conference Compliance Track DoD/EPA State Conference Compliance Track Atlanta, GA Atlanta, GA June.
Stage 1 and 2 Disinfection Byproduct Rule presented by: Joseph Munson.
Overview of the Microbial and Disinfection By Products Rules in Alaska Presented by: Jeanine Oakland Statewide Compliance/Enforcement Coordinator Drinking.
1. Disinfection By-Products: A Historical Perspective Effect of Early Analytical Methodology for Analyzing Trihalomethanes (THMs) –Concentrating processes?
MassDEP Drinking Water Program 2014 An Overview Yvette DePeiza, Director Drinking Water Program CERO - 7/29/2014.
Mississippi State Department of Health
Regulatory Update Silver Falls Conference 2006 DHS Drinking Water Program.
To Protect and Enhance Kentucky’s Environment Revised Total Coliform Rule RTCR Kentucky Implementation January 1 st, 2016.
The Radionuclides Rule Monitoring, Compliance, and Substitution.
Ground Water Rule Workshop Department of Environmental Conservation September 22-23, 2009 Dan Weber & Gloria Collins Regulations Team DEC Drinking Water.
STAGE 2 DISINFECTION BY- PRODUCTS (DBP’S) A GUIDE TO COMPLIANCE 1.
Primacy Revision Application The Arsenic Rule. Major Points Components of Primacy Revision Application Attorney General’s Statement Special Primacy Requirements.
What effects do they have in drinking water
To Protect and Enhance Kentucky’s Environment Revised Total Coliform Rule RTCR Effective April 1, 2013.
$200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 MCLsMonitoring RulesReporting.
State of Alaska Implementation of MBDP Rules Carrie Bohan Environmental Program Specialist ADEC DW Program.
Underground Storage Tank Compliance Act of 2005 Bill Torrey UST/LUST Regional Program Manager US EPA – New England EBCNE April 19, 2006.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
Denver Water’s Preparation for the Stage 2 Disinfectant By-Product Rule Bruce Hale (DW) Steve Lohman (DW) Arnold Strasser (DW) Edward Koval (B&V)
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
Disinfectants and Disinfection Byproducts Rule (Stage 1&2 DBPRs) Wyoming Potable Water Age, Lagoon Aeration and Utility Line Replacement Seminar Hosted.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
TOTAL COLIFORM MONITORING 40 CFR TRANSIENT NON-COMMUNITY PUBLIC WATER SYSTEMS.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
1 Exceptional Events Rulemaking Proposal General Overview March 1, 2006 US EPA.
EPA Groundwater Rule 40 CFR Parts and 142. Reasons for the Groundwater Rule  To protect public health due to viruses and other bacterial exposure.
Revised Total Coliform Rule Sandy Brentlinger Southwest Drinking Water.
Nitrification Action Plans
Purpose of Water Treatment c. Safe Drinking Water Act and SDWA amendments.
Revised Total Coliform Rule (RTCR) Community Systems Rychel McKenzie Jason Pushard December 2015.
1 TCEQ Drinking Water Sample Collector Training October 2006 Alicia Diehl TCEQ Public Drinking Water Section UCMR Sampling TCEQ Drinking Water Sample Collector.
Total Coliform Rule (Old)vs. Revised Total Coliform Rule (New)
Level 2 Assessment. Abbreviations to Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. Coli PN – Public Notice.
SWRCB Public Workshop for Periodic Review January 10-12, 2005 Slide 1 Issue 4c New Objectives Greg Gartrell Assistant General Manager Contra Costa Water.
Level 1 Assessment. Abbreviations To Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. Coli PN – Public Notice.
Hexavalent Chromium MCL Regulation Guidance Eric Zuniga, PE San Bernardino District SWRCB – DDW.
SAFE DRINKING WATER GENERAL UPDATE TO CHAPTER 109 June 19, 2007 Bureau of Water Standards and Facility Regulation.
Water Quality Facts John Shirey City Manager William Busath, P.E. Director of Utilities Pravani Vandeyar Water Quality Superintendent.
Total Coliform Rule (TCR)
Submittal And Review Of New And Revised Water Quality Standards
Water Quality Standards Submittal & Review Process
TCEQ Office of Water Water Supply Division
Sample Siting Plans under the Revised Total Coliform Rule
Sample Site Plans.
OHWARN Workshop Disruption of Service Rule Update
Trihalomethanes Removal Evaluation
Presentation transcript:

Stage 2 Disinfectants and Disinfection Byproducts Rule Bruce Macler USEPA Region H Br Cl Bromodichloromethane

Stage 2 DBPR Will ultimately require TTHM and HAA5 MCL compliance at each monitoring point in distribution system –No averaging across distribution –Goal to control for DBP "hot spots“ –More linkage between wholesalers and retailers Initial Distribution System Evaluation –Monitoring requirement to determine compliance points Proposed August 18, 2003 –Federal Register v.68, n.159, pp Final Rule expected December 15, 2005*

*Regulatory Schedule S2 DBPR expected to be signed by EPA Administrator on December 15, 2006 –At same time as LT2 ESWTR Publication in Federal Register is official “promulgation” date- January? 60-day Congressional review hold Rounded to beginning of following month for “effective” date –April 1, 2006 starts the ball rolling

Purpose of the Stage 2 DBPR Purpose is to provide additional protection from disinfection byproducts of concern Supplements existing S1 D/DBPR by focusing on parts of distribution system with higher risks

Significant Changes from Proposal Proposed Interim “Stage 2A” MCLs to apply before final “Stage 2B” locational MCLs –Deleted these as too complex Proposed early implementation dates –Now will be staggered Proposed system-based monitoring –Now will be based on population served Added criteria and details on “Significant Excursions”

Systems Affected by the Stage 2 DBPR Applies to all CWSs and NTNCWSs that add a disinfectant other than UV, or deliver water that has been treated with a disinfectant other than UV –Systems using surface water –Systems using ground water under the influence of surface water –Ground water systems –Consecutive systems Consecutive systems are defined in the Stage 2 Rule as public water systems that buy or otherwise receive some or all of their finished water from one or more wholesale systems for at least 60 days per year.

Why Are Consecutive Systems an Issue? Wholesalers’ MCL requirements end at turnouts… Some regulated contaminants increase in the distribution system –TTHMs –Coliform bacteria States have taken varying approaches to regulating DBPs in consecutive systems

Definitions Consecutive system is a public water system that buys or otherwise receives some or all of its finished water from one or more wholesale system(s), for at least 60 days per year Finished water is water that is introduced into the distribution system of a public water system and is intended for distribution without further treatment, except that necessary to maintain water quality Wholesale system is a public water system that treats source water and then sells or otherwise delivers finished water to another public water system for at least 60 days per year. Delivery may be through a direct connection or through the distribution system of one or more consecutive systems Combined distribution system is the interconnected distribution system consisting of the distribution systems of wholesale systems and of the consecutive systems that receive finished water from those wholesale systems

Stage 2 DBPR Components Initial Distribution System Evaluation (IDSE) New compliance monitoring locations –Sites chosen from IDSE and/or Stage 1 DBPR sites –Locational Running Annual Average –Operational Evaluations Inclusion of consecutive systems Population based compliance Revisions to Stage 1 DBPR –Reduced monitoring based on TOC –Bromate reduced monitoring

Source Water TOC Reduced DBP Monitoring Stage 1 DBPR –Systems with TTHM < mg/L, HAA5 < mg/L, and TOC < 4.0 mg/L as a running annual average can qualify for reduced monitoring of TTHM and HAA5 No timeframe specified Stage 2 DBPR –Timeframe added –To qualify for reduced monitoring sample every 30 days –To stay on reduced monitoring sample every 90 days

Reduced Monitoring for Bromate Stage 1 DBPR –Systems that use ozone monitor for bromate at the entry point to the distribution system. –Reduced monitoring if bromide in source water is < 0.05 mg/L –Stays in effect until December 31, 2008 Stage 2 DBPR –Reduced monitoring if bromate is < mg/L RAA at entry point to the distribution system New analytical method for bromate with lower detection limit System must have 12 months of data utilizing new method –Goes into effect January 1, 2009

Consecutive Systems Must comply with IDSE requirements Must conduct TTHM and HAA5 compliance monitoring Must comply with the Stage 1 DBPR requirements for chlorine and chloramines –Daily monitoring –MCLs (4.0 mg/L)

Challenges for Consecutive Systems If receiving treated water –Likely to contain DBPs already –May contain high levels of precursors and disinfectants that make more DBPs over time Upstream treatment changes may substantially affect downstream water quality –Long-term –Variable or episodic

MCL Compliance Challenges for Consecutive Systems S1 DBPR controlled DBP precursors –Not an option for consecutive systems S2 DBPR introduces new BATs for consecutive systems –Chloramination (>10,000 only) –Management of flow and storage These may not work –May need locational treatment in distribution system

Population-Based Monitoring and Scheduling Stage 1 DBPR –Scheduling based on source water type and population served –Monitoring based on source water type, population served, and number of plants Stage 2 DBPR –Scheduling based on source water type, population served, and population of systems in combined distribution system –Monitoring based on source water type and population served

Combined Distribution Systems (CDS) All systems in a CDS (i.e., wholesalers, consecutive systems) must comply with Stage 2 DBPR requirements on the same schedule –Compliance date is based on the largest system in the CDS –Largest system is not necessarily the wholesaler State has discretion to determine CDS –Emergency or seasonal connections

Combined Distribution Systems Combined Distribution System Treatment Plant R i v e r Wholesale System Consecutive System System ASystem BSystem C

Combined Distribution System Example System A System serving 12,000 System B System serving 60,000 System C System serving 500 Who treats and sells water to... Sells water to... All 3 systems must comply based on the schedule of System B (Schedule 2)

Violations Monitoring and MCL violations are attributed to the PWS where the violation occurred System A sells to System B and a violation occurs in System B A B System B is in violation because it has the legal responsibility for complying with the MCL System B may set up a contract with System A that details water quality delivery specifications Example

Public Notice and Consumer Confidence Reports Responsibility of individual system Wholesale system is responsible for notifying the consecutive system of analytical results and violations related to monitoring Consecutive system must include the wholesale system’s monitoring results in the consumer confidence report Consecutive system must conduct appropriate public notification upon a violation (whether in the wholesale or consecutive system)

Initial Distribution System Evaluation (IDSE) Studies conducted by water systems to identify distribution system locations that represent high TTHM and HAA5 levels Results of the IDSE are used to select Stage 2 compliance monitoring sites Not required for NTNCWSs serving fewer than 10,000 people In addition to current regulatory monitoring

Initial Distribution System Evaluation Options Standard monitoring –One-year study of TTHM and HAA levels in distribution system using protocol System-specific study using models and data –Must accomplish same goal as standard approach “40/30 Monitoring Waiver” –ALL existing data are <40 ug/L for TTHM and <30 ug/L for HAA Very small systems waiver –<500 people and existing monitoring site representative

IDSE Options (cont.) Systems serving < 500 people Can be granted by the State, if the State determines that the Stage 1 site represents both high TTHM and HAA5 concentrations Waiver All Stage 1 compliance monitoring results (not just LRAAs) are under 40  g/L TTHM and 30  g/L HAA5 Monitoring periods are specified in rule Very Small System Waiver 40/30 Certification

IDSE Options (cont.) The system must evaluate DBP concentrations throughout the distribution system using existing data source or combination of data sources (e.g., historical data, hydraulic monitoring results) Report must be submitted to the State System must conduct 1 year of distribution system monitoring for TTHM and HAA5 Report must be submitted to the State System Specific Study (SSS) Standard Monitoring Program (SMP)

Compliance Spread Over Time Systems >100,000 plus consecutives start first –257 SW+ 22 GW systems in R9 Systems K plus consecutives –Start six months after first group –69 SW + 33 GW systems in next group Systems 10-50K plus consecutives –Start six months after second group –86 SW GW Systems <10K –Start six months after third group –535 SW GW

IDSE Schedule Systems Serving: Submit 40/30 Cert. or Monitoring Plan By: Complete IDSE Study By: Submit IDSE Report By: 1 > 100,000June 30, 2006June 30, 2008Sep 30, ,000– 99,999 Dec 31, 2006Dec 31, 2008Mar 31, ,000– 49,999 June 30, 2007June 30, 2009Sep 30, < 10,000Dec 31, 2007Dec 31, 2009Mar 31, 2010 Schedule for systems in a combined distribution system is based on that of the largest system in the combined distribution system

IDSE Challenges for Consecutive Systems No previous DBP monitoring requirements –May lack data to determine appropriate monitoring locations for Stage 2 DBPR –May not be eligible for VSS Waiver or 40/30 Certification under IDSE Must work with wholesaler, maybe others –Work together to find or get data –Samples may have been taken in consecutive system’s distribution system

Standard Monitoring One of four options for compliance with IDSE requirements Most systems that need to complete an IDSE will use this option- hopefully! Process is set by U.S. EPA –Frequency, number, and location of samples

Standard Monitoring IDSE Steps Select locations for Standard Monitoring Prepare and submit Standard Monitoring plan –Primacy Agency must approve or modify the plan Conduct Standard Monitoring –12 months of monitoring for TTHM and HAA5 Select Stage 2 DBPR compliance monitoring locations Prepare and submit IDSE report

Required Components of Standard Monitoring Plan Distribution system schematic –Entry points and sources –Locations and dates of proposed Standard Monitoring sites –Locations and dates of Stage 1 DBPR monitoring sites Population served Source water type Justification of Standard Monitoring sites –Must include data used to justify selection of Standard Monitoring sites

Sampling Requirements What, where, and how often do I sample? –Samples Collected Dual sample set (both TTHM and HAA5) collected at all locations –Sample Locations High TTHM levels High HAA5 levels Average Residence Time Near Entry Points –Number of sites Based on system type –Sample Frequency 1, 4 or 6 samples during the year at each location Number based on population served and source type

Standard Monitoring Requirements When do I sample? –Sample months Peak historical month –Peak TTHM levels or –Peak HAA5 levels or –Month of warmest water temperature Subsequent sample months every 60 days or every 90 days from peak historical month

TTHM and HAA5 Standard Monitoring (1) For GW systems or systems that purchase GW Population Frequenc y Tota l Near EP ART High TTHM High HAA5 < 5001/year (2) 21 (3) ,999 4 (every 90 days) ,000 – 99, , , > 500, (1) A dual sample set (i.e., a TTHM and an HAA5 sample) must be taken at each monitoring location during each monitoring period. (2) Taken during peak historical month. The peak historical month is the month with the highest TTHM or HAA5 levels or the warmest water temperature. (3) You must monitor at or near the entry point if you are a consecutive system. If you are not a consecutive system, you must monitor at a high HAA5 location.

TTHM and HAA5 Standard Monitoring For Surface and GWUDI systems and systems that purchase surface or GWUDI PopulationFrequencyTotal Near EP ART High TTHM High HAA 5 <5001/year (2) 21 (3) ,300 4 (every 90 days) ,301-9, ,000-49,999 6 (every 60 days) , , , , M-4,999, > 5M

Standard Monitoring Site Selection – Justification Plan must include a justification for the selection of sites to be sampled during Standard Monitoring Data sources and tools –Distribution system maps –Water quality data –Distribution system operating data

Factors Affecting DBP Formation Precursor concentration Disinfectant - type and dose Water chemistry Water temperature Water age Biodegradation of HAAs

High TTHM concentration Organics TTHM Formation Disinfection

High HAA5 concentration HAA5 Formation Organics Disinfection

Data Sources and Tools for Site Selection Distribution system maps –Pipes Dead ends Length and diameter Age and material –Land use Highly and lightly developed areas Major users –Entry points and sources –Key components Tanks, pump stations, booster chlorination

Data Sources and Tools for Site Selection Water quality data –Source water quality –DBP data Can use Stage 1 DBPR data for information Cannot use Stage 1 DBPR sites for Standard Monitoring sites –Disinfectant residual data Can be indicative of water age May indicate biodegradation of HAA5

Data Sources and Tools for Site Selection Distribution system operating data –Understanding water flow Pump run times Metered flows between pressure zones Billing records for major users Advanced tools (hydraulic modeling or tracer studies) –Impact of tanks Tank level records and tank configurations –Impact of booster chlorination

Selecting Near Entry Point Sites Tools –Distribution system map Location –After treatment –Before first customer (not required) If fewer entry points than needed –Replace with high TTHM and HAA5 sites Alternate, starting with TTHM

Selecting Near Entry Point Sites– Example System needs 1 location near entry point System has 2 surface water treatment plants and 1 well = 3 entry points System considers flows from each source –WTP 1 – 5 MGD –WTP 2 – 3 MGD –Well 1 – 0.75 MGD Locate site near entry point for WTP 1 WTP 1: 5 MGD WTP 2: 3 MGD Well 1: 0.75 MGD x Monitoring Location

Selecting Average Residence Time Sites Determination –Flow weighted calculation –Population weighted calculation Tools –Distribution system map –Distribution system operational data Hydraulic modeling or tracer study Pump run times, metered flow –Distribution system water quality data Average Disinfectant Residual

Selecting High TTHM Sites TTHM formation –Advanced water age is primary factor Good TTHM sites –Downstream of tanks –Dead ends, but prior to last customer –Hydraulic dead ends and mixing zones –Downstream of booster chlorination –Sites with difficulty maintaining residual –Areas with low water use –Areas of high historic levels

Selecting High HAA5 Sites HAA5 formation –Water age, but also consider biodegradation Avoid –Areas with known biofilm growth –Areas with difficulty maintaining a residual Good HAA5 sites –Downstream of booster chlorination –Sites with low but detectable residual –Areas of high historic levels –Downstream of tanks –Hydraulic dead ends and mixing zones –Areas with low water use

Standard Monitoring Site Selection Data Sources and Tools Disinfectant residual, maps, models, etc. Select Candidate Sites Select Standard Monitoring Sites Narrow Down Selection Preliminary data will present many “candidate sites” from which the system can choose “selected sites”

Final “Selected” Sites Some site selection will be obvious –Near entry point Others will require professional judgment –Consider geographic representation –Consider hydraulic representation –Consider areas fed by sources with higher DBPs –Use sites that “multi-task” –Consider accessibility

Submitting Standard Monitoring Plan Once the system has collected and analyzed its information, it must prepare the plan and submit it to the Primacy Agency –Must include required information

Primacy Agency Review of Standard Monitoring Plan Primacy Agency will review the monitoring plan submitted by the system –Verify that it contains required elements –Review Standard Monitoring site selection and justification Primacy Agency may approve or modify plan If the Primacy Agency does not take action within 12 months from the date when the Plan was due, the system can consider the plan approved

Next Steps Conduct 12 months of monitoring based on Standard Monitoring Plan –As approved or amended by Primacy Agency –Begin monitoring when plan has been approved, or 12 months from submission deadline Prepare and submit IDSE report –Purpose of the report is to identify Stage 2 DBPR Compliance Monitoring Sites

Selecting Stage 2 Monitoring Sites Calculate a locational running annual average (LRAA) for each IDSE site and Stage 1 DBPR site Select sites with highest LRAA values according to Stage 2 requirements May select sites with slightly lower LRAA values, but must provide rationale in report –Provides better geographic coverage –Maintain historic data collection –Site is used to sample for other water quality parameters

IDSE Reporting Requirements If using 40/30 certification waiver –All TTHM and HAA5 results from compliance monitoring required to qualify for the 40/30 certification –All TTHM and HAA5 results from compliance monitoring taken after the qualifying period for State review –A schematic of the distribution system with results noted –Proposed Stage 2B sites and schedule

IDSE Reporting Requirements If using System Specific Study –All studies, reports, analytical results, and modeling used –Stage 1 TTHM and HAA5 analytical results from the study period –A schematic of the distribution system –Proposed Stage 2B monitoring sites and schedule

IDSE Reporting Requirements If using Standard Monitoring Plan –SMP and Stage 1 TTHM and HAA5 analytical results –The original monitoring plan and data used to justify SMP site selections –A schematic of the distribution system with the results, location, and date of all SMP and Stage 1 samples noted –Proposed Stage 2 monitoring sites and schedule –Justification for Stage 2 selection if needed

System Recordkeeping Must keep a copy of their IDSE plan and IDSE report as well as state modification or approval for 10 years after date of submittal Make all available for review by the state or the public CCR must include the range of sample results from the IDSE monitoring in same calendar year as sampling occurred

Primacy Agency Recordkeeping Must retain a copy of IDSE study plan and any modifications until replaced by the approved IDSE report Must retain a copy of IDSE report and any modifications until replaced or revised in its entirety

Stage 2 Implications for R9 DW Systems Monitoring is complex –Expect M/R violations For most systems, few changes in monitoring points expected Hot spots will be found for some, but unclear how they can be controlled