Ray Morgan – Regional VP One – Stop Shop Permitting.

Slides:



Advertisements
Similar presentations
Medicaid Management Information System (MMIS) Replacement
Advertisements

July 15, 2008 – GB Work Session Discussion of Mayor Thomas E. Swisstack’s Priority List Recommendations.
Regions and Eco zones Of Canada.
Bentley SUPERLOAD Oversize/Overweight Permitting and Routing.
 Permitting Routing › Definition › Permits Type › Permitting Process  Project Purpose › Proposed Solution  GIS › Definition › Functions › Benefits.
SW Region Construction Conference February 19 th 2014 Joe Schneider – Work Zone Engineer Traffic Section – SW Region La Crosse Office.
Minnesota Department of Transportation House Transportation Policy & Finance Committee February 23, 2015.
NASTO Region Matthew Hedge. What is new or proposed for the states of the NASTO region?
Froland Transportation, Inc. Established in 1991.
Charlottesville Residency Monthly Report 1 April 2004   Mission  Essential Tasks Assessment  Construction & Maintenance  Planning & Traffic Engineering.
Computer Integrated Manufacturing CIM
OLD KINGS ROAD Special Assessment District. Overview History Phased Project Current Status.
Heavy/Specialized Solutions 1 8/2013 Model Definition Landstar is a worldwide, non-asset based provider of integrated supply chain solutions delivering.
Polish Heavy Transport Association. Introduction Short information about lecture About Us 1 Permit and escort 2 3 Our goals.
A Review of Issues Related to Harmonizing Dimensional Transport Requirements in the Northeast Prepared for the Northeast Manufactured Housing Association.
Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group.
E. Hosseini Aria & R. Ahooee Islamic Azad University, Iran.
Multimodal Concurrency: Response to 2005 Legislative Session Briefing for House Local Government Committee November 30, 2006 King Cushman Puget Sound Regional.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
March 2009 Permitting Over Sized Loads In Texas Ray Hutchinson Motor Carrier Division, TxDOT.
Bus Stop Design Guidelines - In Support of Effective Service Planning
Motorized Off-Road Vehicle Training Campus Safety Division Risk Management & Safety.
By : PHILLIP, ANGUS, DASHAUN, JORDAN, AND MARCUS.
Software and Services for the Protection of Essential Infrastructure AUTOMATED STREETWORKS SYSTEMS IMPROVE PRODUCTIVITY beforeUdig New Zealand Stephen.
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
1 Development of California Regulations for the Testing and Operation of Automated Vehicles on Public Roads Steven E. Shladover, Sc.D.Ching-Yao Chan, Ph.D.
Carol Davis Permit Program Manager TxDMV Motor Carrier Division.
NDACo Legislative Wrap-up Funding for Non-Oil Producing County Highways and Bridges Jason Benson Cass County Engineer.
Benefits of the CTF Program
UNHCR/e-Centre/InterWorks - Emergency Management Training
March 27, 2007 – Hill Farms March 28, 2007 – NE Region Wisconsin LCS Lane Closure Planning System LCS Oversight Group Meeting Steven Parker - TOPS Lab.
INDOT Access Management Study _________________________ Long Range Transportation Planning Section Division of Environment, Planning and Engineering INDIANA.
First Public Hearing February 10,  Board of County Commissioners direction of April 2008 to assess efficiency of development review process and.
Illegal Dumping Prevention MWMA - April Drivers Special handling requirements Landfill bans Cost Lack of convenient & affordable disposal options.
Proportionate Share Agreement for Mango’s Tropical Orange County Board of County Commissioners April 22, 201 Proportionate Share Agreement for Mango’s.
INVENTORY AND HISTORY. Instructional Objectives n Types of inventory and historical data n Different methods of collecting inventory and historical data.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
1 Network Properties (Ownership, Service Paradigm, Measures of Performance)
DESIGNING AN EFFECTIVE WORKPLACE SAFETY STRATEGY Presented by Rick Vines CDTA Director of Risk Management.
Transport and handling at CERN for FAIR
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
1 Society for Environmental Graphic Design | February 17, 2009 Part 6: Maps, Handouts, the Web and Dynamic Wayfinding.
Alachua County Mobility Plan Sidewalk Mitigation & Bicycle and Pedestrian Planning Efforts.
Mike Wendt & Cara Abts WisDOT Regional Traffic March 10, 2015.
Are You a Smart 4 th Grader? Geography 1 What are the 5 themes of Geography?
1 Chapter 15 Network Properties (Ownership, Service Paradigm, Measures of Performance)
THE NEW HOME APPLIANCE CLAMPS – GENERATION G. FIELD OF APPLICATION Carton Clamps or Domestic Appliance Clamps are used throughout the logistic chain to.
McClain County Multi- Jurisdictional Multi-Hazard Mitigation Plan Update Image from
Optimized Permitting and Routing of Oversized and Overweight (OS & OW) Vehicles Branford Dodd, Director Oklahoma Dept. of Public Safety Jay Adams – Hexagon.
Request to Advertise January 27,  Board of County Commissioners direction of April 2008 to assess efficiency of development review process and.
Preparing VDOT’s GIS data for the Implementation of Bentley Superload Brian Young – GIS Technical Lead (ARS) Paul Bucher – Quality Assurance Officer Jean.
1 You’ve got questions. We’ve got answers. Getting up to speed on LTL freight shipping Getting Up to Speed on LTL Freight Shipping.
Joy Patterson, Principal Planner City of Sacramento March 16 th, 2016 For the 2016 Planning Academy.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
US Army Corps of Engineers BUILDING STRONG ® Huntington District Floodplain Management Services Dan Bailey, CFM Huntington District August 2012.
Oversize/Overweight Vehicle Permitting
Super-Loads in Colorado
CEP services.
Computer Integrated Manufacturing CIM
Any Product, Any Service, Anywhere, Any Time!
ArcGIS Decision Support Tool for Infrastructure Improvement
Automated streetworks systems improve productivity
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
Heavy Equipment Transportation services
Automated streetworks systems improve productivity
Safety is part of our culture at Halliburton
1.
ECOZONES AND THE REGIONS OF CANADA
NMDOT Ports of Entry New Mexico Infrastructure Finance Conference
Presentation transcript:

Ray Morgan – Regional VP One – Stop Shop Permitting

Who We Are Transporter of loads with “unique characteristics” creating difficult transportation dynamics. Extreme Dimensions - length, height, width or weight Radioactive Delicate / Special Handling, High Value Shipments Service area throughout the US and Canada. Utilizing modular type equipment for dimension and weight mitigation.

New Automated Permitting Systems Features: –Automated routing systems –Comprehensive mapping –Shortened process times –Better accuracy –Better accounting

Disconnects in Permitting More states are issuing permits that include city or county roads. “New” intelligent permitting systems or “automated” routing systems in many cases have no information on city or county road networks that are included and required for as part of the route for OS/OW loads. The automated permit systems route a load to “local roads”, “off-route” or ‘off-network” but do not clearly identify where the state route ends, road number or permitting authority.

Disconnects in Permitting Most cities or counties do not have the mechanism or competent staff to make comprehensive assessments of dimensional shipments. Most cities or counties do not have a process or sophisticated path in place to approve or deny routing requests. When a state permitting authority directs a permitted load to a route there should be some responsibility for that authority to provide the permission for the use of that route.

One Stop Shop Permitting Automated permitting systems should include all roadways to be utilized for the movement of permitted loads if required by the permitting authority. If city / county permits are required they should be provided as part of the permit that is issued by the governing authority. Fees for city / county permits could be added to the cost of state permits and the documents attached or integrated into the state document.