ITB SOI-ASIA Site Update Adhy S. Bramantyo

Slides:



Advertisements
Similar presentations
IT Week Report Middle School Project Toshihiko SHIMOKAWA Kyushu Sangyo University.
Advertisements

ax2 + bx + c 2x2 + 11x + 5 ac 2(5) = b =11 ( ) 2x2 + 10x + 1x
Advanced Piloting Cruise Plot.
Our library has two forms of encyclopedias: Hard copy and electronic versions. The first is simply the old-fashioned "book on the shelf" type of encyclopedia.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Chapter 1 The Study of Body Function Image PowerPoint
Brief Update from Operation-TF. UDBox Status Total 12 Boxes –6 Shipped to Partner ITB/AIT/ASTI/USC/USM/AIMST AIT has trouble on the BOX –1 Operational.
Operation TF Kotaro/Abas. Discussion Two-UDL 13Mbps Detailed Schedule ASTI Routing (APAN-AI3) UNSYIAH Network Update –Current network situation Diagram.
SOI Asia Site Update Yoo 19 April 2006 SOI Asia/AI3 meeting.
ITB Site Update Affan Basalamah Huahin, April 2006.
SOI Asia / AI Spring Meeting Huahin Thailand 18-19, April 2006.
Page 1 Approximately Maximum Bandwidth Routing for Slotted Wireless Ad Hoc Networks Approximately Maximum Bandwidth Routing for Slotted Wireless Ad Hoc.
Yasuo Tsuchimoto SOI Asia Project Keio University / The University of Tokyo.
IEEE R10 GOLD Congress 2006 Ken Chan Past Chair Hong Kong Section 15 July 2006.
Mourad Loulou, Tunisia Section Chair 1 Mourad Loulou Tunisia Section Chair IEEE Tunisia Section.
The MPI Forum: Getting Started Rich Graham Oak Ridge National Laboratory.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
GSMP Local Community Network Global Agenda 29 Nov (revised) Melanie Kudela.
GSMP Local Community Network Global Agenda 25 Oct (revised) Melanie Kudela.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 Lisa Alexander and Helen Dennis April 16, 2008 Data Updates/Data Review Form District Test Coordinator Meeting.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Term 2, 2004, Lecture 9, Distributed DatabasesMarian Ursu, Department of Computing, Goldsmiths College Distributed databases 3.
SVQs Business and Administration Launch Events January/February 2011.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Duration CONSTRUCTION Opening Date EQUIP INSTALL. & TEST Incheon International Airport Control Tower Outcome Progress DESIGN & AWARD : AOR 36 MONTHS.
Richmond House, Liverpool (1) 26 th January 2004.
+ St. Mary and St. Joseph Coptic Orthodox Church.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Day of the week 9:00 – 10:00 10: :00 12: :00 13: :00 14: :00 15: :00 16:00 – 17:00 17: :00 18:00 – 19:00 19:00 – 20:00.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
© 2006 Cisco Systems, Inc. All rights reserved. MPLS v MPLS VPN Technology Introducing MPLS VPN Architecture.
1 ITSS This overview deck contains two sections. Please use the links below to navigate –How to Register for ITSS Application AccessHow to Register for.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
VOORBLAD.
1 Multimedia Systems 2 Dr Paul Newbury School of Engineering and Information Technology ENGG II - 3A11 Ext:
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
1. 2 No lecture on Wed February 8th Thursday 9 th Feb 14: :00 Thursday 9 th Feb 14: :00.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
IPv6.kr DNS Deployment Plan Feb, 2004 Seung-hoon Lee & Billy Cheon IP Address Management Team Korea Network Information Center.
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Week 1.
1. 2 No lecture on Wed February 8th Thursday 9 th Feb Friday 27 th Jan Friday 10 th Feb Thursday 14: :00 Friday 16:00 – 19:00 HS N.
20&27 May Agenda 1.Highlight the difference between system flow of e- Invoice and paper invoice – 15 minutes 2.Demonstrate the operation procedure.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Immunobiology: The Immune System in Health & Disease Sixth Edition
September 16, 2006 Welcome Ryerson Teaching Assistants and Graduate Assistants ”
Other MAGDAS I Stations 2006 HER ABJ ILR AAB FYMLAQ TIR LKW DVS SMA EUS ANC GLY WAD MGD CST 2006 Jan. Feb. Mar. Apr. May Jun. Jul Aug. 5V1v1 9.


Presentation transcript:

ITB SOI-ASIA Site Update Adhy S. Bramantyo

Outline SOI ASIA courses in ITB Activities in DSP course ITB-Unsyiah To do list (in progress)

Our classroom picture

Activities in Aichi Expo at Sep. 21, 2005 Tsunami Symposium at Dec. 8-9, 2005 Introduction to Quantum Computing on June 27-29, 2005 Tsunami lectures on May 11, Dec. 21, 2005 Reproductive Bioscience and Biotechnology on Feb. 7, 2006-Mar. 15, 2006

Activities…(contd) Advanced Topics for Marine Science on Nov. 22, 2005-Mar. 6, and on Oct. 26, 2005-Dec. 14, Object Oriented Software Development on Feb. 27, 2006-Mar. 13, 2006

DSP-DMC events ITB president gave speech

DSP Course ITB-Unsyiah twice a week Tuesday 9.00 WIB – WIB Friday WIB – WIB Rehearsal 1 day before lecture Recorded by Ganesha TV (ITB students television) We send a copy of lecture to Unsyiah via FedEx

DSP Course…(contd) Operational Status Bandwidth kbps Codec h.261, fps Some packet loss Still working on it Using ipv4 unicast Trying to use ipv6 unicast this week Some problems Blackout electricity in Unsyiah during the lecture happens sometimes… We will address this problems

Some pics on DSP Courses

To Do List (in progress) Our planning to build new dedicated multimedia room for SOI course

To Do…(contd) Enhancing operational monitoring in ITB-Unsyiah course Mailing lists, irc, website Distance Learning Project in Indonesia DGHE (Directorate general of Higher education) build R & D Network in Indonesia Passing the SOI traffic into TEIN2 Network

Thank you!